ENERMECH

Leak test 2nd flange connection on DSV 10


Leak test 1st & 3 nd flange connection on FSO 2 10
Nitrogen Purging until 2% O2 content 50
Contigency Proposed 100%
CR ASIA IKM TESTING EMAS EACH SECTION RISER VOLUME
0 32 4
13.084 20 24 LGTH (M)
39.18 100 60 10.43
200% 100 200% 11

PSI
P (atm) 14.7
P (req.) 58.0151 (4 BAR)
V (riser) 7.06293 (O.2 M3)
V (req.)

P V = P V
14.7 0.2 58.0151

0.0506764618 =
VOLUME (M3)
0.19
0.20

3.579245