You are on page 1of 1

REV.

DATE DESCRIPTION PREPARED CHECKED APPROVED


REVISION
OWNER IDENTIFICATION No.:
REV.:

OWNER: CONSULT
VIETNAM ELECTRICITY ANT: POWER ENGINEERING
VINH TAN THERMAL POWER CONSULTING J.S.C 2
MANAGEMENT BOARD (PECC2)
EPC
CONTRACTOR: SHANGHAI ELECTRIC GROUP CO.,LTD.
DESIGN: ShanghaiClydeBergemann
MachineryCompanyLtd
PROJECT: DESIGN STAGE:
For
VINH TAN 2 2×622MW THERMAL POWER PLANT Information

APPROVED CHECKED INSTRUCTIONS For


INSTALLATION OERATION
REVIEWED PREPARED
MAINTEMANCE
DATE 2012.10. SCALE DRAWING No. REV. A

You might also like