Activity Description Unit |Prod] Gew Description ip | pt soo [se wont || “100 Trench Excavation not to exceed 1m. deep) | LM 100.0] 1-Backhoe Opte.2-Dump Truck Driver, 3-Labouer 200 Trench Excavation (not to exceed 2m. deep) | LM | 70,0) 1-Backhoe Optr.2-Dump Truck Driver, Labourer 300 Trench Excavation (not to exceed §m.deep) | LM | 35,0) i-Backhoe Optr.,2-Dump Truck Driver, 3-Labourer 400 | Backfill & Compact Trench | M3 36.0) 1-Mini Loader Opt, 4-Labourer 000 BUILDING STRUCTURE | — 100 Excavation for raft foundation M3. 60.0) 1-Backhoe Optr.2-Dump Truck Driver, 3-Labourer 200 Excavation for Isolated footings | M3 45.0) 1-Backhoe Optr.2-Dump Truck Driver, 3-Labourer 300 Backfill around footings | M3 14.0) 1-Mini Loader Opt, -Dump Truck Driver. 3-Labourer | | 000 CONCRETE ho] 00 Bling Cone ung ne deay| M2 | 349] 2Rehser.2Mason sabower Foundation (Forms & Rebar fixing included ) | 4) Isolated Footing under 0.75 M3 | M3 | 19.0| 1-Foreman, 6-Rehcarp.,2-Stlfer,1-Mason,4-Labourer |. b) Isolated Footing over 4.0 M3 | M3_| 40.0) 1-Foreman, 6-Rghearp.2-Stifxr, -Masoné-Labourer ©) Strip Footing | M3 | 310] Do 4) Mat Foundation under 7.5 M3 | M8 | 13.9) Do ) Mat Foundation over 15.0 M3 (MB | 28.0 Do 200 Retaining Wall (Gravity ) Forms & Rebar incl, a) 1200 mm. High | he | 33.0] 1-Foreman,18-Rghcarp. cr eee 2-Labourer ) 3000 mm. Hi | M3 | 62.0) 0 400 Ground Beams | Ma | 77) 1-Foreman.16-Rghearp.4-Stfr1-Mason2-Labourer 500 Slab on Grade ( Forms & Rebar included ) 2) 100 mm. thk M2. |207.0| 1-Labour Foreman, 6-Mason, 2- Laborer ') 150 mm. thk. M2_ | 202.0} 1-Labour Foreman, 6-Mason, 2- Laborer ©) 200 mm. thk M2. |192.0), 1-Labour Foreman, 6-Mason, 2- Laborer 4) 300 mm. thk M2_ | 165.0|'1-Labour Foreman, 6-Mason, 2-Laborer 550 Slabon Grade ( Forms & Rebar included ) 3) 100 mm. thk M3 _| 34.0) 1-Carpenter Foreman, 2-Rghcarp. 4-Stifxr,3-Labour,1-Mason ) 150 mm. thk. M3 | 51.0} =do- 5° Columns (Forms & Rebar fixing included ) - 2) ma. 300mm | ts | 30} arene Reman 6s 2S Latour Mason 1 400 mm. x 400 mm. M3 | -do- ©) 600 min. x 600 mm. MB) 88 -do- 4) 990 ma, x 900 mm | M3 | ite -do~ 700 | R.CWall (Forms & Rebar fixing included ) | 2) 200 mm. thk. x 2400 men. high | M3 23.0) 1-Carpenter Foreman, 14-rghcarp, §-Stlfx,2-Labour,1-Mason %) 200 mm. thk. x 4275 mm. high | Ma | 13.4) ~do- ©) 300 mm. thk. x 2400 mm. high M3 | 32.0 -do- 800 Suspended Beams i | 8) 3.05 meter span | M3 | 7.8) 1-Carpenter Foreman 12-Rghcarp. 4-Stlr.2-Labour.1-Mason ©) 7.60 meter span j M3} 92i ~do- 900 Suspended Solid Siab | | 2) Lway beam & slab ~ | M3_ 10.2) 1-Carpenter Foreman.16-Rghearp.-Stlxr,2-Mason,2-Labour 3) 2-way beam & slab M3 | 1201 “do 910 | WalfleSiab | | 2) 762 mm. dome (M3 184) ~do- 900 BLOCKWORK ; oy fd 100.) 100 mm. Thk. CMU | Ma. | 18.0) 3-Blocklayer2-Labourer 200) 150 mm. Thk. CMU M2 | 16.5) 3-Blocklayer2-Labourer Page 10f 6 ‘Aetivity Description Unit [Prod] ‘Grew Description 300 | ©) 200mm. Thk. CMU M2 | 13.5) 3-Blocklayer; 2-Labourer 000 METAL WORKS | 100. a) Handrail & Railing ( Aluminum) 1M | 27,0) 3-Structural steel worker | 200 b) Ladder ( Aluminum/Steel bolted toconc) | LM | 17.0) 3-Structural steel worker ¢) Metal decking (76mm. dep galv) | Mz | 63.0) 1-Metalsheet foreman; 3-Metal sheet worker 000 THERMAL&MOISTUREPROTECHON, =| 100 | Dampproofing | |) Brushed on below grade, 1-coat M2 | 41,0| Labourer |») Brushed on below grade, 2-

You might also like