60mm Thk. WEARING COURSE 1.693
154
(STREAM BED LEVEL) RFL 2.538
60
2.409 (STREAM BED LEVEL)
53
-0.37% -2.5 % 2.359
RUBBLE PAVING IN 1: 3 CEMENT SAND
MORTAR,PAVING TO BE DONE WITH SELECTED
250
CAMBER FORMED WITH RUBBLE OR GRADE 15(19) CONCRETE HAVING A
FLAT TOP SURFACE
150
150
GR.30(19) CONCRETE
EX.C-2.279
150
IL 0.549 150 GR.30(19) CONCRETE
IL 0.599 SURFACE TO BE RAMMED
15
Slope 1:200 (RHS)
(LHS) AND LEVELLED BEFORE
0
250
COMMENCING PAVING
1560
GR.30(19) CONCRETE
500
500
200 1200 200
150 150
75 Thk.15(37.5) CONC.
150
SCREED
150
SECTION A-A
450
(SCALE 1:100) 75 THK.15(37.5)
CONC. DETAIL OF RUBBLE
SCREED
PAVING AT WING WALL
200
450 ( SCALE 1:50 )
SECTION C-C
(SCALE :- 1:50)
1452
200
750 CL 750
1500
1500
TURFING / RUBBLE
PITCHING/GR.15(19) CONCRETE
(TO BE DECIDED)
200
200 TO KODIKAMAM 200
1810
2000
2000
1850
1850
GUARD STONE
DRG. NO. JF/01/CUL/SCB/02 2000 2000
200
CARRIAGEWAY LEVEL
200 200
150
CH.3+750
200
1200
75 THK.15(37.5)
1810
3000
CONC.
75
750 SCREED
1500
200
1850
2000
2000
200
( SCALE 1:50 )
700
75 Thk.15(37.5) CONC.
SCREED
3000
END ELEVATION
FROM PULOLY
1500
1500
( SCALE 1:100 )
750 750
NOTES:
PLAN 1. ALL DIMENSIONS ARE IN MILLIMETRES & ALL LEVELS ARE IN METERS ABOVE MEAN SEA LEVEL (MSL).
( SCALE 1:100 ) 2. ALL WORKS SHALL BE CARRIED IN CONFORMITY WITH RELEVANT SPECIFICATIONS.
4. FOUNDATION LEVELS BELOW INVERT LEVELS GIVEN ARE INDICATIVE ONLY. THE ACTUAL LEVELS
SHALL BE DECIDED AFTER EXCAVATION FOR THE FOUNDATION ARE CARRIED OUT.
5. FOR R/F DETAILS GRADE OF CONCRETE AND CLEAR COVER TO R/F ARE AS PER GIVEN DETAILS.
7. IF WEAK SOIL STRATA IS ENCOUNTERED AT BASE SLAB LEVEL PREPARATION OF SAND BED SHALL BE
INTRODUCED AS INSTRUCTED BY ENGINEER.