A A B C D 6 5 4 3 3 2 1 1 2 3 4 5 6

PLAIN CEM. PAINTED FINISH 50mm x 75mm TUBULAR 0.400mm THK. G.I. RIDGE ROLL
0.40mmTHK. G.I. LONG SPAN ROOFING 0.40mmTHK. G.I. LONG
SPAN ROOFING 0.40mm THK. G.I. GUTTER
SLIDING GLASS TYPE WINDOW
W/ FIXED GLASS TRANSOM 50mm x 75mm TUBULAR

TOP OF ROOFING TOP OF ROOFING


2.60

2.60
TOP OF ROOF BEAM TOP OF ROOF BEAM
3.30

3.30
2ND FLR. FIN. LINE 2ND FLR. FIN. LINE
3.20

3.20
FINISH FLOOR LINE FINISH FLOOR LINE
0.60

0.60
FINISH GRADE LINE FINISH GRADE LINE
CHB FIREWALL W/ PLAIN CEM. FIN.
CHB WALL W/ PLAIN CEM. FIN.
PANEL TYPE DOOR
FRONT ELEVATION SCALE 1: 100 METERS LEFT SIDE ELEVATION SCALE 1: 100 METERS RIGHT SIDE ELEVATION SCALE 1: 100 METERS

A B D A B D
9.40 9.40
2.00 4.90 0.90 1.20 2.40 2.05 2.00 3.40 1.50 4.50
1.20
5 NO. OF
1 2 2.20
2.46 0.50 Doors MARK WIDTH HEIGHT
SETS REMARKS
DIRTY KITCHEN PD
3.46

3.28
1.00 m. 2.10MTRS. 2
1 PANEL TYPE DOOR (DESIGN VARIES)
SERVICE AREA SW
8 W/ 4 PCS. LOOSE PIN & HINGES

1.40
TERRACE PD 0.80m. 2.10MTRS. 3

0.68
SW SW SW SW PD
6 8 3 3 2 2
6 PD PD
6 BEDROOM MASTER'S
6
USE 5mmTHK. MARINE PLYWOOD

2.50
2 2
MAID'S FD 0.80m. 2.10MTRS. 6
BEDROOM DOUBLE WALL W/ 50mmx50mm NAILERS
1
2.33

2.33

2.33

PLASMA TV
KITCHEN ROOM SW SW FR. 50mmx150mm DOOR JAMBS
SW 4 4
4
Ref
T&B
FD FD 0.60m. 2.10MTS. PVC TYPE DOOR W/ FIXED LOUVER

4.13
2 7
5 5 5 2 WINDOW, COMPLETE ACCESSORIES

0.60
FD 1
BEDROOM
SD 0.90m. SLIDING GLASS DOOR W/ ANALUK
2.10MTS. 1
FRAMES (SINGLE PANEL)
2.50

SW
4 SW FD 1
4 HEIGHT FROM
3.50

SLIDING GLASS DOOR

NO. OF
4.00

LANAI TERRACE
2.90
SW HEIGHT
FD
Windows WIDTH

0.80
FD 2 3 MARK FIN. FLR. LINE REMARKS
1 SETS
SW TO WDO. SILL

2.20
PD 2 7
FD 2
BEDROOM SW 4x0.80m.= 1.20MTS.W/ 1
4 FD 0.90m.
1 T&B 1 3.20MTS. 0.33 TRANSOM SLIDING GLASS WINDOW
FD 2
4 4
1.20

DINING AREA W/ ANALUK FRAMES W/


13.23

13.23
SW
8 FD 1 17 16 15 14 13 12 11
2x0.80m.=
FD 2 SW 1.20MTS.W/ FIXED GLASS TRANSOM
14.13
2.40

SW 6 0.90m.
1.60m.
2.90

2 0.33 TRANSOM
14.98

2
2.40

2.40
1 2 3 4 SW 10 FW
8
SW 3x0.70m.=
T&B 1.20MTS. 3 0.90m.
2.10m.
0.50

1 2 3 4 5 6 7 8 SW FAMILY AREA 3
3.20

SW 3 4 5 6 7 8 9
3 2 3 2 3 SLIDING GLASS WINDOW
PLASMA TV
SW 2x0.60m.= W/ ANALUK FRAMES
1.20MTS. 6 0.90m.

1.50
SW
PD 8 4 1.20MTS.
1 T&B
LIVING AREA FD
FOYER 3 FD SW SW SW FD 2 SW 2x0.60m.= 1.65 MTRS. 4 0.40m.
AWNING GLASS WINDOW
5.00

2 5 5 1
BEDROOM 5 1.20MTS. W/ ANALUK FRAMES
4.50

4.50

SW
1
2.45

PD
GARRAGE
2.50

1 3x0.70m.=
SW

3.00
SW 0.90 M. 1 1.40MTRS.
SW SW TERRACE 4 6 2.10MTS.
5 5
1.50

MAIN ENTRANCE

PORCH SW 2x0.70m.= 1.50MTRS. SLIDING GLASS WINDOW


0.70m. 1
1.50

2 4
2 2 7 1.40MTS. W/ ANALUK FRAMES
3 SW SW
0.90

0.90

2.25

2 2 FD 2
SW

1.75
1 1 1 8
0.70m. 0.70M. 5 1.50MTRS.
0.95

0.75
RAMP UP L A W N FD
2.01

FD FW 4x0.40m.= ABOVE FLOOR AWNING GLASS TYPE


2.05 MTRS. 1
GROUND FLOOR PLAN 1.60MTS. BEAM WINDOW
3.46

SCALE 1: 100 METERS 3


0.75
0.25
5.87

H 0.25
RT
L A W N

NO 1.48 1.89 1.44 1.25 1.46 1.90 SCHEDULE OF DOORS & WINDOWS
SECOND FLOOR PLAN
3.40 3.00 3.00 SCALE 1: 100 METERS 3.35 3.05 3.00
9.40 9.40
4
A B C D A B C D

CERTIFIED BY: SEAL : PROJECT TITLE: REVISIONS: APPROVED BY: APPROVED BY: SHEET NO.

DATE: JANUARY 14, 2015


PROPOSED TWO - STOREY RESIDENTIAL BUILDIING 2
PLACE: ILOILO CITY AS SHOWN ABOVE

CIVIL ENGINEER
8
LOCATION: LOT 2, BLOCK - 4, WESTWOODS SUBD., DUNGON - C, MANDURRIAO, ILOILO CITY OWNER
D B A A A A B C D 6 5 4 3 2 1
0.40mmTHK. G.I. LONG SPAN ROOFING PVC TYPE DOOR W/ FIXED
SLIDING GLASS WINDOW TILES WALL FINISH FIXED GLASS WINDOW
LOUVER WINDOW
CHB WALL W/ PLAIN CEM.
CHB WALL W/ PLAIN CEM. PAINTED FINISH
PAINTED FINISH

TOP OF ROOFING
2.60

SEE RAFTER DETAIL SEE TRUSS DETAIL SEE TRUSS DETAIL


TOP OF ROOF BEAM
BOTTOM LINE OF CEILING
3.30

3.00
MASTER'S BUILT IN FAMILY
2ND FLR. FIN. LINE TERRACE FAMILY AREA TER. BEDROOM CABINET AREA TERRACE 2ND FLR. FIN. LINE
3.20

BOTTOM LINE OF SLAB

3.20
T&B

2.22
FINISH FLOOR LINE LANAI DINING AREA T&B BEDROOM FINISH FLOOR LINE
SERVICE AREA T&B LIVING AREA PORCH
0.60

0.60
ON FILL FIN. FLOOR LINE ON FILL ON FILL
FINISH GRADE LINE FINISH GRADE LINE
CHB WALL W/ PLAIN CEM. FIN.
PANEL TYPE DOOR

REAR ELEVATION SCALE 1: 100 METERS CROSS - SECTION SCALE 1: 100 METERS LONGITUDINAL SECTION SCALE 1: 100 METERS

10mmØ CHAIR BARS @ 0.20m. O.C.


10mmØ NOSING BARS
4
8
7
125mm THK. + FIN. 6 12mmØ EXTRA BARS
SECOND 0.32
(TYPICAL) SPACED AS SHOWN
FLOOR LEVEL 5
0.05
4
50mmØ STAILESS PIPE 17 16 15 14 13 12 11 3
HAND RAIL 10

0.188
2.40
FW 2 16mmØ MAIN BARS @ 0.15m. O.C.
BENT UP 2 OUT OF 3 @ L/4

0.188
1 2 3 4 5 6 7 8 9 1

0.188
FINISH FLOOR LINE

GROUND
UP

0.60
FLOOR LEVEL 150mm THK. + FIN.

0.85
2-16mmØ VERT. BARS @ 0.18m. O.C. W/
12mmØ BARS 2@0.05, 1@0.10, 1@0.15,
REST @ 0.20m. O.C.

0.25
3

4-16mmØ LONGITUDINAL BARS W/


section 12mmØ BARS @ 0.20m.O.C.
plan 0.60

1.14

PARTIAL DETAIL OF STAIR SCALE 1: 25 METERS


2.08

CERTIFIED BY: SEAL : PROJECT TITLE: REVISIONS: APPROVED BY: APPROVED BY: SHEET NO.

DATE: JANUARY 14, 2015


PROPOSED TWO - STOREY RESIDENTIAL BUILDIING 3
PLACE: ILOILO CITY AS SHOWN ABOVE

CIVIL ENGINEER
8
LOCATION: LOT 2, BLOCK - 4, WESTWOODS SUBD., DUNGON - C, MANDURRIAO, ILOILO CITY OWNER
0.10 0.10 0.25 0.25 0.25 0.20

100mmTHK. CHB WALL W/


2-12mmØ VERT. BARS W/
10mmØ VERT. BARS @ 6 - 16mmØ TOP BARS 2- 16mmØ TOP BARS 5 - 16mmØ TOP BARS 2 - 16mmØ TOP BARS
10mmØ TIES 5 @ 0.05,
0.60m.O.C.& 10mmØ
3@ 0.10, 3@ 0.15, REST
HORIZONTAL BARS

0.13
@ 0.20m.O.C.
EVERY 3 LAYERS OF
FIN. FLOOR LINE CHB FIN. FLOOR LINE 2 - 16mmØ TOP BARS

0.40

0.40
( VAR. )
NATRURAL GROUND LINE NATRURAL GROUND LINE
DET. SECTION OF CANOPY BEAM
(at floor framing only)
2- 16mmØ BOTTOM BARS 6- 16mmØ BOTTOM BARS 2- 16mmØ BOTTOM BARS SCALE 1: 10 METERS

0.65
at support at mid-span at support

0.25
section section
3-10mmØ CONT. BARS W/ 0.40 0.40 3-10mmØ CONT. BARS W/
DET. SECTION OF 2FB -1
SCALE 1: 10 METERS 2- 16mmØ TOP BARS
10mmØ MATT. BARS 0.20m. O.C. 0.10 0.13
10mmØ MATT. BARS 0.20m. O.C.
NOTE:
USE 10mmØ STIRRUPS 5 @ 0.05, 5 @ 0.10,
5 @ 0.15, REST @ 0.20M. ON CENTER

0.40
0.25

plan W.F. DETAIL SCALE 1: 25MTRS.

0.15
V.S. DETAIL SCALE 1: 25MTRS. 5- 16mmØ BOTTOM BARS 2 - 12mmØ CONT. BARS
at mid-span

A B D A B D DET. SECTION OF 2FB-2 DET. SECTION OF LINTEL BEAM


9.40 9.40 SCALE 1: 10 METERS (at floor framing only)
2.00 4.90 0.90 1.20 2.40 2.05 2.00 4.90 4.50 SCALE 1: 10 METERS
1.20
1.50
125mm THK. FLOOR SLAB W/ 12mmØ REINF. BARS
AT 0.15m. ON CENTER BOTHWAYS
3.46

3.28
BENT UP 2 OUT OF 3 @ L/4 2FB-2
ON FILL
ELEV.= 0.50m.
2FB-2

1.40
2FB-1

2FB-1
C1/F1 C1/F1 C1/F1

2FB-2
0.68
WF VS VS WF 2FB-1 2FB-1
6 6 6 6 - 16mmØ VERTICAL BARS W/ 0.25
10mmØ LATERAL TIES 5@0.05,
ON FILL

2FB-2
2FB-2

2FB-2
2.33

2.33

2.33
3@0.10, 3@0.15,REST @ 0.20m.
WF

WF
WF

WF

C1/F1 ELEV.= 0.60m.


C1/F1 ON CENTER

4.13
WF WF 2FB-2 2FB-1 2FB-1
5 C1/F1 C1/F1 5 5 FIN. FLOOR LINE
VS
ON FILL
2.50

0.60
ELEV. = 0.60m. +
WF

ON FILL
ON FILL
3.50

3.50

2FB-2

2FB-1

2FB-1
FIN. 100mm THK.

2FB-1
WF

WF

ELEV.=
4.00
WF

ELEV.= 0.60m.

0.80
0.50m. FLOOR SLAB W/ WF NATRURAL GROUND LINE
10mmØ MATT. VS VS

2.20
BARS @ 0.40m. 2FB-1
4 O.C. B.W. C1/F1 VS 2FB-1
C1/F1 4 2FB-2
4
13.23

13.23

13.23
C1/F1 C1/F1 VS WF
14.13
2.40

1.20
2.90

2.90
WF

2FB-1

2FB-2
2FB-1

2FB-2
2.40

2.40
WF
WF

STAIR CASE
C1/F1 C1/F1
0.50

2FB-1
3 C1/F1 WF C1/F1 3 3

0.30
2FB-1

VS WF VS 2FB-1 2FB-1
section
1.50

ON FILL 3 FD
1.30
5.00

WF

2FB-1
ELEV.= 0.60m. 8-16mmØ MATTING RARS
4.50

4.50

4.50
2FB-1
ON FILL
WF

WF

0.25
ELEV.= 0.26m. BOTHWAYS
2FB-1
2FB-1

WF
3.00

VS VS
1.50

ON FILL
ELEV.= 0.55m. C1/F1
2 C1/F1 C1/F1 C1/F1 2 2
VS
0.70

2FB-1 2FB-1 2FB-1


0.90

0.90

0.90

WF WF
FD

1.75
1 1 2

0.35
1.30
2FB-1

0.70
WF WF FD
2.01

C1/F1 C1/F1 FD

FOUNDATION PLAN 0.70 0.70 0.70


SCALE 1: 100 METERS 0.25 plan
5.87

0.25

1.20 FLOOR FRAMING PLAN 1.48 1.85 1.48 1.25 1.50 1.90
SCALE 1: 100 METERS
3.40 3.00 3.00 3.40 3.00 3.00
9.40 9.40
C1/F1 DETAIL
SCALE 1: 25METERS
A B C D A B C D

CERTIFIED BY: SEAL : PROJECT TITLE: REVISIONS: APPROVED BY: APPROVED BY: SHEET NO.

DATE: JANUARY 14, 2015


PROPOSED TWO - STOREY RESIDENTIAL BUILDIING 4
PLACE: ILOILO CITY AS SHOWN ABOVE

CIVIL ENGINEER
8
LOCATION: LOT 2, BLOCK - 4, WESTWOODS SUBD., DUNGON - C, MANDURRIAO, ILOILO CITY OWNER
A D A B
1.00 3.40 1.00

TOP OF TRUSS

75mmØ G.I. PIPE SCHED. 40 RAFTER

R D 5mm
C HO THK
.x5 5mm
OP THK 6 - 16mmØ BARS ANCHORAGE AT ROOF BEAM W/
mT 0mm
2.52

m . x 50m 2- 5mmTHK. x 50mm x 50mm ANGLE BARS


x 50 x 50
mm mx5
0mm TOP 0mm FULL WELD TO RAFTER ( TYPICAL) TOP OF ROOF BEAM
.x5 CH
TOP
CHO
THK 5mmTHK. x 38mm x 38mm WEB MEMBER OR RD
5mm 5mmTHK. x 38mm x 38mm WEB MEMBER

1.13
D
TOP OF TRUSS
0.22

0.22

2.19
TOP OF ROOF BEAM
TOP OF ROOF BEAM 5mmTHK. x 75mm x 75mm BOTTOM CHORD 5mmTHK. x 75mm x 75mm BOTTOM CHORD

0.15

1.06
1.10 1.00 1.10 1.20 1.40 1.40 1.20 1.10 1.00 1.10
TOP OF ROOF BEAM TOP OF ROOF BEAM
1.50 1.40 1.30 1.20 1.25 1.56
9.40
6.65

FULL TRUSS DETAIL SCALE 1: 50 METERS HIP TRUSS DETAIL SCALE 1: 50 METERS

RAFTER DETAIL SCALE 1: 50 METERS

A B D
9.40
1.10 0.60 2.05 2.05
1.10 4.50 1.10 D B C D

0.60
RB
DS DS

0.60
TRUSS -1 DS
RB

1.40
CB

CB
5mmTHK. x 38mm x 38mm WEB MEMBER
RB RB

1.40
VA

6 DS 6 TOP OF TRUSS
LL

D
OR
EY

TRUSS -1
CH D TOP OF TRUSS
RA

T OP OR
CH
FT

0mm
RB

OP

1.32
HI
RB
ER

x5 mT
HALF TRUSS

P
2.05
-1

0.95
TR
0mm 50m
S
US

DS
US TOP OF TRUSS .x5 mx TOP OF TRUSS
TR

5 S DS
5 HK 5mmTHK. x 38mm x 38mm WEB MEMBER 0m

0.22

0.22
-1 mT .x5
P

5m HK
HI

T 5mmTHK. x 50mm x 50mm TOP OF ROOF BEAM


TOP OF ROOF BEAM 5mmTHK. x 50mm x 50mm BOTTOM CHORD 5mm

0.15

0.15
BOTTOM CHORD
2.05
RB

SLOPE
RB

FULL TRUSS 50mm x 75mm CEE PURLINS


SPACED @ 0.60m. O.C. 1.10 0.75 0.70 0.79 0.79 0.70 0.75 1.10 1.10 0.75 0.75 0.75 0.75 1.10
0.83
1.00

FULL TRUSS SLOPE


DS RB 3.00
4 RAFTER
4.50
4
13.23

13.23
2.05
2.15

HI
P
TRUSS DETAIL -1 TRUSS DETAIL -2
RB

TR SCALE 1: 50 METERS SCALE 1: 50 METERS


HALF TRUSS

RAFTER US
4.40

RB

S
-1
1.88
RB

DS 3
2.15

0.40mm THK. G.I. GUTTER


ER
FT

RAFTER 0.20 2.00 NOTE: 2.00


RA

3
1.88
Y

RB
1.00

USE 10mmØ STIRRUPS 5 @ 0.05, 5 @ 0.10,


LL
VA

TRUSS -2 5 @ 0.15, REST @ 0.20M. ON CENTER


RB
RB
RB
0.50 1.50

1.88

3 - 16mmØ TOP BARS 2 - 16mmØ TOP BARS 4 - 16mmØ TOP BARS

RB TRUSS -2 DS
2 2
RB
1.10

3.00

3.00

3.00
120mm THK. SLAB W/ 12mmØ REINF. BARS
AT 0.20m. ON CENTER BOTHWAYS
1.00 3.40 1.00
2- 16mmØ BOTTOM BARS 3- 16mmØ BOTTOM BARS 2 - 16mmØ BOTTOM BARS
at support at mid - span
0.50 3.00
ROOF FRAMING PLAN
1.10 3.00 1.20
SCALE 1: 100 METERS DET. SECTION OF ROOF BEAM DET. SECTION OF CANOPY BEAM
9.40 SCALE 1: 10 METERS (at roof beam only)
SCALE 1: 10 METERS
A B C D

CERTIFIED BY: SEAL : PROJECT TITLE: REVISIONS: APPROVED BY: APPROVED BY: SHEET NO.

DATE: JANUARY 14, 2015


PROPOSED TWO - STOREY RESIDENTIAL BUILDIING 5
PLACE: ILOILO CITY AS SHOWN ABOVE

CIVIL ENGINEER
8
LOCATION: LOT 2, BLOCK - 4, WESTWOODS SUBD., DUNGON - C, MANDURRIAO, ILOILO CITY OWNER