TELANGANA

As on 27.02.2019

MONITORED from 01.04.2018 PLF for 333


POWER STATION CAP. TODAY'S to 27.02.2019
(MW) ACTUAL
days
ACTUAL

STATE TOTAL 9888.10 162.61 45163.22 57.15


SECTOR: ST 7288.10 101.80 28236.36 48.48
TYPE: THERMAL 4882.50 100.50 26529.66 67.99
BHADRADRI TPP 0.00 0.00 0.00
Unit 1 0.00 0.00 0.00
Unit 2 0.00 0.00 0.00
Unit 3 0.00 0.00 0.00
Unit 4 0.00 0.00 0.00
KAKATIYA TPS 1100.00 21.65 7027.93 79.94
Unit 1 500.00 11.42 3567.23 89.27
Unit 2 S 600.00 10.23 3460.70 72.17
KOTHAGUDEM TPS 720.00 5.79 3385.76 58.84
Unit 1 60.00 1.17 356.04 74.25
Unit 2 60.00 1.24 376.27 78.47
Unit 3 L 60.00 0.00 0.00 0.00
Unit 4 60.00 1.23 387.51 80.81
Unit 5 120.00 2.15 661.11 68.93
Unit 6 P 120.00 0.00 468.40 48.84
Unit 7 P 120.00 0.00 648.50 67.62
Unit 8 P 120.00 0.00 487.93 50.88
KOTHAGUDEM TPS (NEW) 1000.00 23.46 6858.77 85.82
Unit 9 250.00 5.84 1801.29 90.155
Unit 10 250.00 5.74 1626.72 81.417
Unit 11 500.00 11.88 3430.76 85.855
KOTHAGUDEM TPS (STAGE-7) 800.00 19.26 1042.28 16.302
Unit 12 800.00 19.26 1042.28 16.302
RAMAGUNDEM - B TPS 62.50 1.36 380.10 76.096
Unit 1 62.50 1.36 380.10 76.096
SINGARENI TPP 1200.00 28.98 7834.82 81.694
Unit 1 600.00 14.41 3998.12 83.378
Unit 2 600.00 14.57 3836.70 80.011