U#09 COH and R&M - LDO Consumption

Tank level (meters) /Qty (KL) Cumulative


Consumption consumption
Date Opening Balance Closing Balance Remarks
(KL) for startup
meters KL meters KL activites

7/31/2020 2.16 179.9928 2.1 174.993 4.9998 4.9998


Boiler light up for hot
rinsing
8/1/2020 2.1 174.993 2.05 170.8265 4.1665 9.1663

Oil drained for LDO


8/6/2020 2.05 170.8265 2.01 167.4933 3.3332 9.1663
strainer cleaning

Boiler light up for steam


8/7/2020 2.01 167.4933 1.88 156.6604 10.8329 19.9992
dumping in to condenser.

Boiler light up for steam


8/7/2020 2.01 167.4933 1.89 157.4937 9.9996 29.9988
dumping in to condenser.

Boiler light up for steam


8/8/2020 1.89 157.4937 1.83 152.4939 4.9998 34.9986
dumping in to condenser.

8/9/2020 1.83 152.4939 1.77 147.4941 4.9998 Boiler light up 39.9984


8/11/2020 1.77 147.4941 1.59 132.4947 14.9994 Boiler light up 54.9978

8/12/2020 1.59 132.4947 1.42 118.3286 14.1661 Boiler light up 69.1639

8/14/2020 1.42 118.3286 1.39 115.8287 2.4999 Boiler light up 71.6638

8/15/2020 1.39 115.8287 1.18 98.3294 17.4993 Boiler light up 89.1631


U#09 COH and R&M - HFO Consumption
Tank level (meters) /Qty (KL) Cumulative
Consumptio consumption
Date Opening Balance Closing Balance Remarks
n (KL) for startup
meters KL meters KL activites

01/Aug/20 2.36 740.7568 2.34 734.4792 6.2776 Boiler light up for hot rinsing 6.2776

Boiler light up for steam dumping


7/Aug/20 2.34 734.4792 2.3 721.924 12.5552 18.8328
in to condenser.

Boiler light up for steam dumping


8/Aug/20 2.3 721.924 2.27 712.5076 9.4164 28.2492
in to condenser.

Boiler light up for steam dumping


9/Aug/20 2.27 712.5076 1.93 605.7884 106.7192 134.9684
in to condenser.

Boiler light up for steam dumping


10/Aug/20 1.93 605.7884 1.56 489.6528 116.1356 251.104
in to condenser.
11/Aug/20 1.56 489.6528 1.49 467.6812 21.9716 Boiler light up 273.0756

Change in VI
Stage tank level
2.9 910.252 1.97 618.3436 291.9084 Interconnecting valave between V
Stage & VI Stage HFO tanks 423.738
Change in V
1.49 467.6812 1.94 608.9272 -141.246 opened
Stage tank level

12/Aug/20 1.94 608.9272 1.55 486.514 122.4132 Boiler light up 546.1512

13/Aug/20 1.55 486.514 1.13 354.6844 131.8296 Boiler light up 677.9808

14/Aug/20 1.13 354.6844 1.1 345.268 9.4164 Boiler light up 687.3972

15.08.2020
Change in VI
Stage tank level
2.59 812.9492 1.73 543.0124 269.9368

Interconnecting valave between V


Change in V
Stage tank level
1.1 345.268 1.66 521.0408 -175.7728 Stage & VI Stage HFO tanks 928.5102
opened
oil receipts to
VI stage HFO 146.949
tank

You might also like