Professional Documents
Culture Documents
JOB COST
Sl. Job Description PO No. & Date Agency Cost
No. (Rs.)
1. GTs & UATs PM 4000199510 M/s.Friends 112158.00
Dt:05.03.2018 Engineering works
2. 21 KV flexible disconnection -do- -do- 40805.00
3. GTs oil Filtration -do- -do- 62480.00
4. GT-6Y Oil Flow Meter-5 -do- -do- 5277.00
replaced
5. GT-6B Buchholtz Relay -do- -do- 5225.00
Replaced
6. UAT – 6A oil seals repl -do- -do- 21014.00
7. 21 KV Bus duct painting -do- -do- 27747.00
Total :- 2,74,706.00