SCOPE OF WORK
&
GENERAL INFORMATION
1 Scope of Work
CCA as per
Name of canal Off take point
WAPCOS
The rainy se ason comme nce s from about middle of July and lasts up to about
the end of Se ptembe r. Beyond Se ptembe r sporadic showe rs cannot be ruled
out. The maximum tempe rature in summe r may go up to about 50°C and the
minimum tempe rature in winter may go down to about 0 °C. May and June are
ge ne rally the warmest months
and De ce mbe r and January the coldest. Fre quent sand storms occur
in the summe r se ason.
The contractor shall be re sponsible for maintain law & orde r in his camp and
on his work and to that extent shall e mploy such office rs, watchman or othe r
pe rsons as re quire d. Unauthorized or unde sirable pe rsons shall be excluded
from the camp and from the worksite . If in the opinion (which shall not be que
stione d) of the Engineer -in-charge , any e mployee or any age nt of the
contractor misbehave s or causes obstructions in the prope r exe cution of the
work or othe rwise makes himself unde sirable, the contractor shall, on re ceipt
of instructions from the Enginee r to do so, re move him from the pre mises
within
twe nty four hours. He shall not be allowe d to ente r the working are a.