You are on page 1of 2

Agenda of Video Conference to be held on 19th March 2019

Sl. Agenda Items Action By


1 Failure of HHP and ALCO Diesel HHP loco equipment failure investigation are being done
Locomotives during 2018-19 (till Feb and the reports are being updated accordingly, the extra
2019) vis-à-vis failure in the same period check points have been introduced to check the failures
of 2017-18. and to reduce them. Super checking of the locomotives has
been started.

2 Implementation status of reliability action Reliability action plan has been updated
plan issued by RDSO and DLW and implemented
3 Availability, procurement and supply of Placed in Annexure 1
HHP Bulk indent items.
4 Availability, procurement and supply of Placed in Annexure - 2
tooling items for HHP locomotive to
Zonal Railways.
5 Availability, procurement and supply of NIL
ALCO bulk indent items.
6 Action plan to improve Diesel loco  Dead loco movement monitoring in 24 x
outage 7 hours
 Chase the wrong loco information
showing in FOIS
 Calculation daily outage from FOIS
manually
 Locomotive schedule PDC is strictly
maintained
 Reduce out of course activity
 Loco placement timely for schedule
work
 To ensure proper availability of
materials as Turbo, Clutch, Brake Valve
Controller, Lube Oil Cooler, Radiator
Core, WDP4 T/Motor, LCC cards and
Knoor Cards.
7 Action plan for locomotives under heavy Clutch Assy, Turbo Assy received from
repair to make these locos in working DLW and 2nd Phase 4 Nos. Turbo are on the
condition way from DLW. Brake Valve Controller
procurement is under process.

8 Availability of critical instruments and Pneumatic Barring Machine & Pneumatic


machine in Diesel Shed and its status Torquing Machine Main Bearing and
P/Assy are required to reduce the effort in
torquing and to ensure adequate torquing.
9 Any other pertaining issues related to Turbo, Clutch and Lube Oil Cooler failed
reliability and maintenance of Diesel pre-maturely without completing its life
locomotives cycle and these failures are frequent. In Air
Brake system, Brake Valve Controllers are
in acute crisis because of which they are not
being replaced in their due schedule time
because of which the locos are getting
troubled on line.