Rig Morning Report

Doc. No: FRM-OP-001-01 Rev: 02-01


77 From To Task details stg. Depth Operation Activity

WAIT ON DAY LIGHT TO INSTALL " LPL " & GPS


78 0:00
POSITIONING EQUIPMENT . HOUSEKEEPING Move Other Move Ops.
3:00
AND CLEAN . R/D " ROV " EQUIP . MAMIETTAN
BOAT ON LOCATION @ 00:30 HRs

LOWER HULL TO 14 ½” DRAFT . WORK ON BOW


79 3:00 4:00 LEG TO FREE UP . ATTEMPT TO RAISE BOW Move Other Move Ops.
LEG . NO SUCCESS . LEG WAS STUCK

CONNECT JETTING LINE . JETTING AND WORK


80 4:00 6:00 ON STUCK BOW LEG . LEG FREE . RAISE LEG TO Move Other Move Ops.
48’ DRAFT

81 6:00
FUGRO INSTALL 1 EA “ LPL “ AT LEVEL 63’ AND Move Other Move Ops.
9:00
CALIBRATION SAME

82 9:00
LOWER AND PIN DOWN WITH BOW LEG . RAISE Move Other Move Ops.
10:00
BARGE TO 8' DRAFT

Page 1 of 6
Operations

Rig Morning Report

Doc. No: FRM-OP-001-01 Rev: 02-01

R/D & BACK LOAD FUGRO " ROV " AND " LPL "
POSITION EQUIP TO CAPOO GEE BOAT . FUGRO
83 10:00 13:30 CEW DEPARTURE TO PATRO SALAM LOCATION Move Other Move Ops.
FOR INSTALL AND CALIBRATIO 5 EA " LPL "
POSITIONING TOOLS

WAIT ON FUGRO " ROV " & " GPS " TO INSTALL
AND CALIBRATION 5 EA" LPL " IN PETROSALAM
84 13:30 0:00 LOCATION AND BACK TO RIG . RIG MOVER Move Other Move Ops.
WARRANTY INSPECTION DAMIETTA BOAT . MG
15 ON LOCATIO @ 18:00 HRs

85

86
87
88
89
90
91
92
93

94 TOTAL Hrs.

WAIT ON FUGRO " ROV " & " GPS " TO INSTALL
95 0:00 6:00 AND CALIBRATION 5 EA " LPL " IN PETROSALAM Others Others
LOCATION AND BACK TO RIG

Page 2 of 6
Operations

Rig Morning Report

Doc. No: FRM-OP-001-01 Rev: 02-01


96 0:00
97 0:00
98 0:00
99
100

Page 3 of 6
Operations

Rig Morning Report

Rev: 02-01
Contract Comp. Man Rate
Duration Reason
Rate (if Different)

3.0

1.0

2.0

3.0

1.0

Page 4 of 6
Operations

Rig Morning Report

Rev: 02-01

3.5

10.5

24

6.0

Page 5 of 6
Operations

Rig Morning Report

Rev: 02-01

Page 6 of 6