Date: 21.04.2014
Name of Work Asphalting the main and cross roads at Naidu layout in ward no-184 Uttarahalli
Contractor: Technical manager (east) Karnataka Rural Infrastructure Development Limited (KRIDL),Project
Implementation Unit, Madhavanagar, Bangalore-S60001.
Is Sieve Size (mm) Weight Cumulative Cumulative Cumulative % Spec.Limits Vide Table
Retained Weight o/oof of Passing 400.11 MORTH
(gm) Retained Retained Specification
(gm)
S3 0 0 0 100 100
4S 3S2 3S2 3.S 96.48 9S-100
0.07S
S40
1032
8679
9711
86.79
97.11
13.21
2.89
(
8-22
0-8
- •
rvices
63 50 0 - - -
50 40 2196 162 2196 149
40 32 1823 153 1823 138
32 25 1685 234 - -
25 20 1542 214 1542 152
20 16 1439 216 1439 210
16 13 1325 241 1325 236
13 10 1185 168 1185 155
10 6 934 153 934 142
Total 12129 1541 10444 1182
(
Combined Flakinessand Elongation lndexes{Total)-30% Max. {Table400.10 of rvf~..,.,/s.Goofy
•
r:uftan S
cy '7!rv1ces
Prepared by
Sushma Technical Manager
Technical Manager
. LablD: GCS-TR-02-40416-004
Date: 21.04.2014
Name of Work Asphalting the main and cross roads at Naidu layout in ward no-184 Uttarahalli
Contractor: Technical manager (east) Karnataka Rural Infrastructure Development Limited (KRIDL),
Project Implementation Unit, Madhavanagar, Bangalore-560001.
Description Test No
1 2
30.00
allowable Aggregate Impact value for Wet Mix Macadam is 30% (Table-400.10 of MORTH
•
Prepared by
Sushma
•
Lab ID: GCS-TR-02-40416-004
Date: 28.04.2014
Name of Work: Asphalting the main and cross roads at Naidulayout in ward no-184 Uttarahalli
Requirement as per
SI. No Description Test Result
15:73:1992
•
Note:
Date: 28.04.2014
Name of Work Asphalting the main and cross roads at Naidu layout in ward no-184 Uttarahalli
Contractor: Technical manager (east) Karnataka Rural Infrastructure Development Limited (KRIDL),Project
Implementation Unit, Madhavanagar, Bangalore-560001.
63 50 Wl 0 23.90 wl 0 -- xl 0
50 40 W2 0 27.00 w2 0 81.00 x2 0
40 25 W3 0 19.50 w3 0 58.00 x3 0
32 25 W4 0 16.95 w4 0 -- x4 0
25 20 W5 0 13.50 w5 0 40.50 x5 0
20 16 W6 0 10.80 w6 0 32.40 x6 0
16 13 W7 0 8.55 w7 0 25.50 x7 0
Comments:
, Date: 28.04.2014
•
Comments:
-7 Maximum allowable Aggregate Impact value for Bituminous Concrete is 27% Vide Table 500-14 of
MORTH Specification.
Date: 28.04.2014
Prepared By:
Mis. GeolyConsrr:_cy Se
Sush ma Page 1/1 Technical Manager