Date: 13.05.2014
Is Sieve Size (mm) I Weight Cumulative Cumulative Cumulative % Spec.Limits Vide Table
Retained Weight o/oof of Passing 400.11 MORTH
(gm) Retained Retained Specification
(gm)
53 0 0 0 100 100
45 329 329 3.3 96.71 95-100
22.4 2595 2924 29.24 70.76 60-80
11.2 2165 5089 50.89 49.11 40-60
4.75 1965 7054 70.54 29.46 25-40
2.36 1284 8338 83.38 16.62 15-30
0.600 585 8923 89.23 10.77 8-22
O.D75 1012 9935 99.35 0.65
Prepared by
Jhansi
Lab ID: GCS-TR-02-40414-008
Date: 13.05.2014
Is Sieve Size (mm) Weight Cumulative Cumulative Cumulative % Spec.Limits Vide Table
Retained Weight %of of Passing 400.11 MORTH
(gm) Retained Retained Specification
(gm)
53 0 0 0 100 100
45 304 304 3.0 96.96 95-100
22.4 2547 2851 28.51 71.49 60-80
,.,~(~,~
0.600 658 8915 89.15 10.85 8-22
0,075 859 9774 97.74 2.26 0-8
•
ncy s.
Prepared by ' ~ ~
'1\
u '
/- -
\..i...:t'echr'-~----
( )
" .
Name of Work: Improvements to Main Roads at Om Shivashakthi Layout to Ward No. 195
Contractor: Technical Manager (East) Karnataka Rural Infrastructure Development Limited (KRIDL),Project
Implementation Unit, Madhavanagar, Bangalore-560001
Is Sieve Size (mm) Weight Cumulative Cumulative Cumulative % Spec.Limits Vide Table
Retained Weight %of of Passing 400.11 MORTH
(gm) Retained Retained Specification
(gm)
53 0 0 0 100 100
Ji ~ ·"' ·nC'YGer
Fer •· GOO\;' ~fl'i7
Prepared by c(,~ Yv"./~
Jhansi
--
•
Lab ID: GCS-TR-02-40414-008
Date: 13.05.2014
Is Sieve Size (mm) Weight Cumulative Cumulative Cumulative % Spec.Limits Vide Table
Retained Weight %of of Passing 400.11 MORTH
(gm) Retained Retained Specification
(gm)
53 0 0 0 100 100
45 365 365 3.7 96.35 95-100
22.4 2418 2783 27.83 72.17 60-80
11.2 2165 4948 49.48 50.52 40-60
4.75 1814 6762 67.62 32.38 25-40
2.36 1239 8001 80.01 19.99 15-30
0.600 648 8649 86.49 13.51 8-22
O.Q75 801 9450 94.50 5.50 ~· 0-8
I \;
; / ~
'~ Dly/~~ ncy
Prepared by
Jhansi
Lab ID: GCS-TR-02-40414-008
Date: 13.05.2014
Is Sieve Size (mm) Weight Cumulative Cumulative Cumulative % Spec.Limits Vide Table
Retained Weight o/o of of Passing 400.11 MORTH
(gm) Retained Retained Specification
(gm)
53 0 0 0 100 100
45 310 310 3.1 96.90 95-100
22.4 2365 2675 26.75 73.25 60-80
11.2 2085 4760 47.60 52.40 40-60
4.75 1898 6658 66.58 33.42 25-40
2.36 1248 7906 79.06 20.94 15-30
0.600 695 8601 86.01 13.99 8-22
O.D75 815 9416 94.16 5.84 ', 0-8
__ _,_J:
•••
...J..lf'Mdlei
~
Jhansi
Lab ID: GCS-TR-02-40414-008
Date: 13.05.2014
Passing Retained Wt.Of The Wt.Of The Wt.Of Wt.Of The Material
Fraction Material Passing The Retained Through
Guaged(gm) Through Fraction Elongation
Gauged Guage(gm)
(gm)
63 so 0.00 - -
32 25 1754 194
Name of Work: Improvements to Main Roads at Om Shivashakthi Layout to Ward No. 195
Contractor: Technical Manager (East) Karnataka Rural Infrastructure Development Limited (KRIDL),
Project Implementation Unit, Madhavanagar, Bangalore-S60001
Name of Work: Improvements to Main Roads at Om Shivashakthi Layout to Ward No. 195
Contractor: Technical Manager (East) Karnataka Rural Infrastructure Development Limited (KRIDL),
Project Implementation Unit, Madhavanagar, Bangalore-560001
Description Trails
1 2
Wt.Of stone pieces (dry) passing ISSieve 12.Smm
but retained in ISSieve lOmm (gm)
(Wa) I 400 I 400
-? Maximum allowable Aggregate Impact value for Wet Mix Macadam is 30% (Table-400.10 of
MORTHspecification)
Prepared by
Jhansi
LABID: GCS-TR-02-40414-008
Date: 29.05.2014
Specific Gravity
7 I W4/(W3-WS) I 2.68 I 2.68 I 2.68
9
I
Water Absorption ((W3-W4)*100)/
I 0.89 I 0.99 I 0.94
W4
Comments:
~ Maximum allowable Aggregate Water absorption value for Bituminous Concrete is 2.0%Ta
Prepared by
Sushma
Lab ID: GCS-TR-02-40414-008
Date: 03.06.2014
3 4
Comments:
~Minimum allowable Aggregate retained coating for Bituminous Concrete is 95% Table No-500.17
Note:
The results indicated above are based on the tests carried out on the samples collected by the lab
Date: 03.06.2014