Four Lane configuration & strengthening of Punjab/HP Border to Mo from km
11.000 to km 42.000 (Design Length 28.700 km) of NH-20 (New NH-154) of
Pathankot-Mandi section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM)(PKG-IA)
Typical cross section
Design Chainage (KM) S. No Length (m) TCS From To 1 11+000 11+025 25 TCS II 2 11+025 11+545 520 TCS XI 3 11+545 11+600 55 TCS IV 4 11+600 11+650 50 TCS IV B 5 11+650 11+700 50 TCS IV B 6 11+700 11+750 5o TCS IV B 7 11+750 11+800 50 TCS IV A 8 11+800 11+850 50 TCS IV B 9 11+850 11+900 50 TCS IV 10 11+900 11+950 50 TCS IV 11 11+950 12+000 50 TCS IV 12 12+000 12+050 50 TCS IV 13 12+050 12+100 50 TCS IV 14 12+100 12+250 150 TCS IV B 15 12+250 12+300 50 TCS IV A 16 12+300 12+400 100 Junction 17 12+400 12+600 200 Junction 18 12+600 12+675 75 Junction 19 12+675 12+850 175 TCS IV 20 12+850 12+900 50 TCS IV B 21 12+900 12+950 50 TCS IV A 22 12+950 13+063 113 TCS IV B 23 13+063 13+087 24 TCS XII 24 13+087 13+250 163 TCS IV B 25 13+250 13+350 100 TCS IV A 26 13+350 13+450 100 TCS IV B 27 13+450 13+500 50 TCS IV 28 13+500 13+550 5o TCS IV B 29 13+550 13+600 50 TCS IV 30 13+600 13+650 50 TCS IV B 31 13+650 13+750 100 TCS IV 32 13+750 14+050 300 TCS IV A 33 14+050 14+080 30 TCS XII 34 14+080 14+200 120 TCS IV A 35 14+200 14+400 200 TCS IV B 36 14+400 14+500 100 TCS IV A 37 14+500 14+550 50 TCS IV A 38 14+550 14+600 50 Toll Plaza 39 14+600 14+650 5o Toll Plaza 40 14+650 14+700 50 Toll Plaza 41 14+700 14+750 50 Toll Plaza 42 14+750 14+800 50 Toll Plaza 43 14+800 14+850 50 Tott Plaza 44 14+850 14+900 50 Toll Plaza 45 14+900 14+950 50 Toll Plaza 46 14+950 15+000 50 Toll Plaza 47 15+900 15+050 50 Toll Plaza 48 15+050 15+100 50 Toll Plaza 49 15+100 15+150 50 Toll Plaza 50 15+150 15+200 50 Toll Plaza 51 15+200 15+250 50 Toll Plaza 52 15+250 15+300 50 Toll Plaza 53 15+300 15+380 80 Toll Plaza 54 15+380 15+400 20 TCS IV A 55 15+400 15+550 150 TCS IV 56 15+550 15+688 138 TCS IV B 57 15+688 15+712 24 TCS XI 58 15+712 15+800 88 TCS IV B 59 15+800 15+950 150 TCS IV A 60 15+950 16+000 50 TCS IV B 61 16+000 16+050 50 TCS IV 62 16+050 16+250 200 TCS IV B 63 16+250 16+450 200 TCS IV A 64 16+450 16+500 50 TCS IV B 65 16+500 16+513 13 TCS IV B 66 16+513 16+537 24 TCS XII 67 16+537 16+750 213 TCS IV A 68 16+750 16+800 50 TCS IV B 69 16+800 16+843 43 TCS IV A 70 16+843 16+867 24 TCS XII 71 16+867 16 900 33 TCS IV B 72 16+900 17+300 . 400 TCS IV A 73 17+300 17+500 200 TCS IV B 74 17+500 17+700 200 TCS IV A 75 17+700 17+750 50 TCS IV A 76 17+750 18+050 300 TCS IV A 77 18+050 18+100 50 TCS IV B 78 18+100 18+200 100 TCS IV A 79 18+200 18+265 65 TCS IV B 80 18+265 18+275 10 TCS X II 81 18+275 18+300 25 TCS IV B 82 18+300 18+350 50 TCS IV 83 18+350 18+400 50 TCS IV B 84 18+400 18+450 50 TCS IV A 85 18+450 18+500 50 TCS IV B 86 18+500 18+700 200 TCS IV 87 18+700 18+750 50 TCS IV 88 18+750 18+800 50 TCS IV B 89 18+800 19+010 210 Approach of Flyover 90 19+010 19+910 900 TCS VI 91 19+910 20+200 290 Approach of Flyover 92 20+200 21+200 1000 TCS IV 93 21+200 21+300 100 TCS IV B 94 21+300 21+350 50 TCS IV 95 21+350 21+373 23 TCS IV B 96 21+373 21+397 24 TCS XII 97 21+397 21+400 3 TCS IV A 98 21+400 21+500 100 TCS IV A 99 21+500 21+550 50 TCS IV A 100 21+550 21+600 50 TCS IV A 101 21+600 21+700 100 Junction 102 21+700 21+800 100 Junction 103 21+800 21+850 50 Junction 104 21+850 21+900 50 Junction 105 21+900 21+950 50 Junction 106 21+950 22+000 50 Junction 107 22+000 22+050 50 Junction 108 22+050 22+100 50 Junction 109 22+100 22+150 50 TCS X B 110 22+150 22+250 100 TCS X 111 22+250 22+300 50 TCS VIII B 112 22+300 22+350 50 TCS VIII B 113 22+350 22+400 50 TCS IX 114 22+400 22+450 50 TCS IX 115 22+450 22+500 50 TCS VIII 116 22+500 22+550 50 TCS X B 117 22+550 22+600 50 TCS X 118 22+600 22+650 50 TCS X 119 22+650 22+750 100 TCS X 120 22+750 22+800 50 TCS IX 121 22+800 22+850 50 TCS VIII E 122 22+850 22+910 60 TCS X II 123 22+910 22+950 40 TCS VIII E 124 22+950 23+000 50 TCS X 125 23+000 23+050 50 TCS III A 126 23+050 23+115 65 TCS X 127 23+115 23+200 85 TCS IX 128 23+200 23+250 50 TCS VIII E 129 23+250 23+300 50 TCS IX 130 23+300 23+350 50 TCS VIII E 131 23+350 23+458 108 TCS VIII E 132 23+458 23+472 14 TCS XII 133 23+472 23+500 28 TCS VIII E 134 23+500 23+550 50 TCS III 135 23+550 23+700 150 TCS X 136 23+700 23+710 10 TCS X B 137 23+710 23+724 14 VOP 138 23+724 23+750 26 TCS X B 139 23+750 23+800 50 TCS X B 140 23+800 23+850 50 TCS X B 141 23+850 23+950 100 TCS X A 142 23+950 24+000 50 TCS X A 143 24+000 24+050 50 TCS X A 144 24+050 24+100 50 TCS X A 145 24+100 24+150 50 TCS X B 146 24+150 24+200 50 TCS X B 147 24+200 24+250 50 TCS X B 148 24+250 24+300 50 TCS X B 149 24+300 24+350 50 TCS VIII 150 24+350 24+400 50 TCS VIII 151 24+400 24+750 350 TCS IX 152 24+750 24+800 50 TCS VIII B 153 24+800 24+850 50 TCS VIII A 154 24+850 24+900 50 TCS X B 155 24+900 25+000 100 TCS X 156 25+000 25+100 100 TCS X B 157 25+100 25+275 175 TCS X 158 25+275 25+550 275 Junction 159 25+550 25+590 40 Junction 160 25+590 25+610 20 Junction 161 25+610 25+650 40 Junction 162 25+650 25+675 25 Junction 163 25+675 25+800 125 TCS X 164 25+800 25+850 50 TCS III 165 25+850 26+024 174 TCS VIII E 166 26+024 26+086 62 TCS XII 167 26+086 26+100 14 TCS I B 168 26+100 26+200 100 TCS II E 169 26+200 26+250 50 TCS II E 170 26+250 26+350 100 TCS II E 171 26+350 26+450 1u0 TCS X 172 26+450 26+500 50 TCS II E 173 26+500 26+600 100 TCS X 174 26+600 26+650 50 TCS III B 175 26+650 26+700 50 TCS I 176 26+700 26+900 200 TCS I B 177 26+900 26+950 50 TCS I A 178 26+950 27+050 100 TCS X 179 27+050 27+100 50 TCS X 180 27+100 27+150 5o TCS III 181 27+150 27+200 50 TCS I 182 27+200 27+250 50 TCS III A 183 27+250 27+500 250 TCS X 184 27+500 27+550 50 TCS II E 185 27+550 27+600 50 TCS I 186 27+600 27+650 50 TCS II E 187 27+650 27+700 50 TCS II F 188 27+700 27+750 50 TCS X 189 27+750 27+800 50 TCS II E 190 27+800 27+860 60 TCS II A 191 27+860 27+880 20 TCS XI 192 27+880 27+900 20 TCS II A 193 27+900 27+950 50 TCS II F 194 27+950 28+050 100 TCS X 195 28+050 28+100 50 TCS III B 196 28+100 28+125 25 TCS II G 197 28+125 28+145 20 TCS XII 198 28+145 28+150 s TCS II G 199 28+150 28+200 50 TCS II F 200 28+200 28+600 400 TCS X 201 28+600 28+650 50 TCS III 202 28+650 28+678 28 TCS II G 203 28+678 28+692 14 TCS XII 204 28+692 28+750 58 TCS II G 205 28+750 28+800 50 TCS IX 206 28+800 28+850 50 TCS III 207 28+850 28+900 50 TCS III B 208 28+900 29+050 150 TCS X 209 29+050 29+150 ) 00 TCS I 210 29+150 29+200 50 TCS II A 211 29+200 29+250 50 TCS II A 212 29+250 29+300 50 TCS I 213 29+300 29+350 50 TCS II A 214 29+350 29+435 85 TCS II A 215 29+435 29+465 30 TCS XII 216 29+465 29+500 35 TCS II A 217 29+500 29+550 50 TCS I B 218 29+550 29+750 200 TCS II E 219 29+750 29+850 100 TCS I 220 29+850 29+900 50 TCS I B 221 29+900 30+150 250 TCS I 222 30+150 30+250 100 TCS I B 223 30+250 30+618 368 TCS I 224 30+618 30+650 32 TCS IV 225 30+650 30+700 50 TCS IV 226 30+700 30+800 100 TCS IV 227 30+800 30+918 118 TCS IV 228 30+918 31+050 132 TCS I 229 31+050 31+100 50 TCS I B 230 31+100 31+150 50 TCS X 231 31+150 31+200 50 TCS II E 232 31+200 31+250 50 TCS I B 233 31+250 31+300 50 TCS I B 234 31+300 31+700 400 TCS I 235 31+700 31+750 50 TCS II E 236 31+750 31+800 50 TCS II E 237 31+800 32+000 200 TCS X 238 32+000 32+050 50 TCS II C 239 32+050 32+100 50 TCS II B 240 32+100 32+150 so TCS II G 241 32+150 32+200 so TCS II B 242 32+200 32+250 so TCS IX A 243 32+250 32+278 28 TCS VII D 244 32+278 32+303 25 TCS XII 245 32+303 32+350 47 TCS III 246 32+350 32+450 100 TCS X 247 32+450 32+494 44 TCS VII D 248 32+494 32+556 62 ”MCS XII 249 32+556 32+600 44 TCS VII D 250 32+600 32+650 50 TCS IX 251 32+650 32+700 50 TCS VIII A 252 32+700 32+750 50 TCS X B 253 32+750 32+850 10g TCS X B 254 32+850 32+900 50 TCS VII B 255 32+900 32+950 50 TCS VII A 256 32+950 32+973 23 TCS VII D 257 32+973 32+997 24 TCS XII 258 32+997 33+000 3 TCS VII D 259 33+000 33+050 50 TCS I 260 33+050 33+150 100 TCS VII A 261 33+150 33+268 118 TCS I B 262 33+268 33+300 32 TCS IV 263 33+300 33+350 50 TCS IV 264 33+350 33+550 200 TCS IV 265 33+550 33+600 50 TCS IV 266 33+600 33+618 18 TCS IV 267 33+618 33+800 182 TCS X 268 33+800 33+900 100 TCS VIII A 269 33+900 33+950 50 TCS VII A 270 33+950 34+000 50 TCS I B 271 34+000 34+050 50 TCS I 272 34+050 34+200 150 TCS I B 273 34+200 34+250 50 TCS I A 274 34+250 34+300 50 TCS I A 275 34+300 34+600 300 TCS X 276 34+600 35+000 400 TCS I 277 35+000 35+100 100 TCS I B 278 35+100 35+150 50 TCS I 279 35+150 35+200 50 TCS I B 280 35+200 35+300 100 TCS II F 281 35+300 35+350 50 TCS II E 282 35+350 35+400 50 TCS I B 283 35+400 35+500 100 TCS II E 284 35+500 35+600 100 TCS III 285 35+600 35+650 50 TCS IX A 286 35+650 35+700 50 TCS II C 287 35+700 35+850 150 TCS X 288 35+850 35+900 50 TCS X 289 35+900 36+000 100 TCS X 290 36+000 36+050 50 TCS II E 291 36+050 36+150 100 TCS II E 292 36+150 36+250 100 TCS II F 293 36+250 36+300 50 TCS II F 294 36+300 36+350 50 TCS II F 295 36+350 36+450 100 TCS II F 296 36+450 36+500 50 TCS X 297 36+500 36+550 5o TCS III B 298 36+550 36+600 50 TCS I 299 36+600 36+700 100 TCS III 300 36+700 36+728 27.5 TCS II A 301 36+728 36+753 25 TCS XII 302 36+753 36+800 47.5 TCS I B 303 36+800 36+850 50 TCS I B 304 36+850 37+000 150 TCS I A 305 37+000 37+100 100 TCS I B 306 37+100 37+200 100 TCS I A 307 37+200 37+400 200 TCS III 308 37+400 37+450 50 TCS III A 309 37+450 37+500 50 TCS III 310 37+500 37+550 50 TCS X 311 37+550 37+600 50 TCS II E 312 37+600 37+650 50 TCS X 313 37+650 37+750 100 TCS I 314 37+750 37+900 150 TCS X 315 37+900 38+000 100 TCS II E 316 38+000 38+050 50 TCS X 317 38+050 38+100 50 TCS II E 318 38+100 38+200 100 TCS I B 319 38+200 38+300 100 TCS II E 320 38+300 38+400 109 TCS X B 321 38+400 38+450 50 TCS X B 322 38+450 38+500 50 TCS II D 323 38+500 38+550 50 TCS II D 324 38+550 38+600 50 TCS II E 325 38+600 38+650 50 TCS IX A 326 38+650 38+750 100 TCS IX 327 38+750 38+850 100 TCS IX A 328 38+850 38+900 50 TCS IX A 329 38+900 39+050 150 TCS IX 330 39+050 39+100 50 TCS IX A 331 39+100 39+150 50 TCS IX A 332 39+150 39+250 100 TCS VII A 333 39+250 39+300 50 TCS IX A 334 39+300 39+400 100 TCS VII A 335 19+400 39+600 200 TCS I 336 39+600 39+650 50 TCS I B 337 39+650 39+700 50 TCS VII A Four Lane configuration & strengthening of Punjab/HP Border to Mo from km 11.000 to km 42.000 (Design Length 28.700 km) of NH-20 (New NH-154) of Pathankot-Mandi section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM)(PKG-IA)
Design Chainage (KM) S. No Length (m) TCS From To 1 11+000 11+025 25 TCS II 2 11+545 11+600 55 TCS IV 3 11+850 11+900 50 TCS IV 4 11+900 11+950 50 TCS IV 5 11+950 12+000 50 TCS IV 6 12+000 12+050 50 TCS IV 7 12+050 12+100 50 TCS IV 8 12+675 12+850 175 TCS IV 9 13+450 13+500 50 TCS IV 10 13+550 13+600 50 TCS IV 11 13+650 13+750 100 TCS IV 12 15+400 15+550 150 TCS IV 13 16+000 16+050 50 TCS IV 14 18+300 18+350 50 TCS IV 15 18+500 18+700 200 TCS IV 16 18+700 18+750 50 TCS IV 17 20+200 21+200 1000 TCS IV 18 21+300 21+350 50 TCS IV 19 22+250 22+300 50 TCS VIII B 20 22+300 22+350 50 TCS VIII B 21 22+350 22+400 50 TCS IX 22 22+400 22+450 50 TCS IX 23 22+450 22+500 50 TCS VIII 24 22+750 22+800 50 TCS IX 25 22+800 22+850 50 TCS VIII E 26 22+910 22+950 40 TCS VIII E 27 23+115 23+200 85 TCS IX 28 23+200 23+250 50 TCS VIII E 29 23+250 23+300 50 TCS IX 30 23+300 23+350 50 TCS VIII E 31 23+350 23+458 108 TCS VIII E 32 23+472 23+500 28 TCS VIII E 33 24+300 24+350 50 TCS VIII 34 24+350 24+400 50 TCS VIII 35 24+400 24+750 350 TCS IX 36 24+750 24+800 50 TCS VIII B 37 25+850 26+024 174 TCS VIII E 38 26+100 26+200 100 TCS II E 39 26+200 26+250 50 TCS II E Four Lane configuration & strengthening of Punjab/HP Border to Mo from km 11.000 to km 42.000 (Design Length 28.700 km) of NH-20 (New NH-154) of Pathankot-Mandi section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM)(PKG-IA)
Design Chainage (KM) S. No Length (m) TCS From To 40 26+250 26+350 100 TCS II E 41 26+450 26+500 50 TCS II E 42 27+500 27+550 50 TCS II E 43 27+600 27+650 50 TCS II E 44 27+650 27+700 50 TCS II F 45 27+750 27+800 50 TCS II E 46 27+800 27+860 60 TCS II A 47 27+880 27+900 20 TCS II A 48 27+900 27+950 50 TCS II F 49 28+100 28+125 25 TCS II G 50 28+145 28+150 s TCS II G 51 28+150 28+200 50 TCS II F 52 28+650 28+678 28 TCS II G 53 28+692 28+750 58 TCS II G 54 28+750 28+800 50 TCS IX 55 29+150 29+200 50 TCS II A 56 29+200 29+250 50 TCS II A 57 29+300 29+350 50 TCS II A 58 29+350 29+435 85 TCS II A 59 29+465 29+500 35 TCS II A 60 29+550 29+750 200 TCS II E 61 30+618 30+650 32 TCS IV 62 30+650 30+700 50 TCS IV 63 30+700 30+800 100 TCS IV 64 30+800 30+918 118 TCS IV 65 31+150 31+200 50 TCS II E 66 31+700 31+750 50 TCS II E 67 31+750 31+800 50 TCS II E 68 32+000 32+050 50 TCS II C 69 32+050 32+100 50 TCS II B 70 32+100 32+150 so TCS II G 71 32+150 32+200 so TCS II B 72 32+200 32+250 so TCS IX A 73 32+250 32+278 28 TCS VII D 74 32+450 32+494 44 TCS VII D 75 32+556 32+600 44 TCS VII D 76 32+600 32+650 50 TCS IX 77 32+850 32+900 50 TCS VII B 78 32+950 32+973 23 TCS VII D Four Lane configuration & strengthening of Punjab/HP Border to Mo from km 11.000 to km 42.000 (Design Length 28.700 km) of NH-20 (New NH-154) of Pathankot-Mandi section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM)(PKG-IA)
Design Chainage (KM) S. No Length (m) TCS From To 79 32+997 33+000 3 TCS VII D 80 33+268 33+300 32 TCS IV 81 33+300 33+350 50 TCS IV 82 33+350 33+550 200 TCS IV 83 33+550 33+600 50 TCS IV 84 33+600 33+618 18 TCS IV 85 35+200 35+300 100 TCS II F 86 35+300 35+350 50 TCS II E 87 35+400 35+500 100 TCS II E 88 35+600 35+650 50 TCS IX A 89 35+650 35+700 50 TCS II C 90 36+000 36+050 50 TCS II E 91 36+050 36+150 100 TCS II E 92 36+150 36+250 100 TCS II F 93 36+250 36+300 50 TCS II F 94 36+300 36+350 50 TCS II F 95 36+350 36+450 100 TCS II F 96 36+700 36+728 27.5 TCS II A 97 37+550 37+600 50 TCS II E 98 37+900 38+000 100 TCS II E 99 38+050 38+100 50 TCS II E 100 38+200 38+300 100 TCS II E 101 38+450 38+500 50 TCS II D 102 38+500 38+550 50 TCS II D 103 38+550 38+600 50 TCS II E 104 38+600 38+650 50 TCS IX A 105 38+650 38+750 100 TCS IX 106 38+750 38+850 100 TCS IX A 107 38+850 38+900 50 TCS IX A 108 38+900 39+050 150 TCS IX 109 39+050 39+100 50 TCS IX A 110 39+100 39+150 50 TCS IX A 111 39+250 39+300 50 TCS IX A Four Lane configuration & strengthening of Punjab/HP Border to Mo from km 11.000 to km 42.000 (Design Length 28.700 km) of NH-20 (New NH-154) of Pathankot-Mandi section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM)(PKG-IA)
Typical cross section (Street lighting)
Design Chainage (KM) S. No Length (m) TCS From To
1 11+545 11+600 55 TCS IV
2 11+600 11+650 50 TCS IV B 3 11+650 11+700 50 TCS IV B 4 11+700 11+750 5o TCS IV B 5 11+750 11+800 50 TCS IV A 6 11+800 11+850 50 TCS IV B 7 11+850 11+900 50 TCS IV 8 11+900 11+950 50 TCS IV 9 11+950 12+000 50 TCS IV 10 12+000 12+050 50 TCS IV 11 12+050 12+100 50 TCS IV 12 12+100 12+250 150 TCS IV B 13 12+250 12+300 50 TCS IV A 14 12+675 12+850 175 TCS IV 15 12+850 12+900 50 TCS IV B 16 12+900 12+950 50 TCS IV A 17 12+950 13+063 113 TCS IV B 18 13+087 13+250 163 TCS IV B 19 13+250 13+350 100 TCS IV A 20 13+350 13+450 100 TCS IV B 21 13+450 13+500 50 TCS IV 22 13+500 13+550 5o TCS IV B 23 13+550 13+600 50 TCS IV 24 13+600 13+650 50 TCS IV B 25 13+650 13+750 100 TCS IV 26 13+750 14+050 300 TCS IV A 27 14+080 14+200 120 TCS IV A 28 14+200 14+400 200 TCS IV B 29 14+400 14+500 100 TCS IV A 30 14+500 14+550 50 TCS IV A 31 15+380 15+400 20 TCS IV A 32 15+400 15+550 150 TCS IV 33 15+550 15+688 138 TCS IV B 34 15+712 15+800 88 TCS IV B 35 15+800 15+950 150 TCS IV A 36 15+950 16+000 50 TCS IV B 37 16+000 16+050 50 TCS IV 38 16+050 16+250 200 TCS IV B 39 16+250 16+450 200 TCS IV A Four Lane configuration & strengthening of Punjab/HP Border to Mo from km 11.000 to km 42.000 (Design Length 28.700 km) of NH-20 (New NH-154) of Pathankot-Mandi section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM)(PKG-IA)
Typical cross section (Street lighting)
Design Chainage (KM) S. No Length (m) TCS From To
40 16+450 16+500 50 TCS IV B
41 16+500 16+513 13 TCS IV B 42 16+537 16+750 213 TCS IV A 43 16+750 16+800 50 TCS IV B 44 16+800 16+843 43 TCS IV A 45 16+867 16 900 33 TCS IV B 46 16+900 17+300 . 400 TCS IV A 47 17+300 17+500 200 TCS IV B 48 17+500 17+700 200 TCS IV A 49 17+700 17+750 50 TCS IV A 50 17+750 18+050 300 TCS IV A 51 18+050 18+100 50 TCS IV B 52 18+100 18+200 100 TCS IV A 53 18+200 18+265 65 TCS IV B 54 18+275 18+300 25 TCS IV B 55 18+300 18+350 50 TCS IV 56 18+350 18+400 50 TCS IV B 57 18+400 18+450 50 TCS IV A 58 18+450 18+500 50 TCS IV B 59 18+500 18+700 200 TCS IV 60 18+700 18+750 50 TCS IV 61 18+750 18+800 50 TCS IV B 62 20+200 21+200 1000 TCS IV 63 21+200 21+300 100 TCS IV B 64 21+300 21+350 50 TCS IV 65 21+350 21+373 23 TCS IV B 66 21+397 21+400 3 TCS IV A 67 21+400 21+500 100 TCS IV A 68 21+500 21+550 50 TCS IV A 69 21+550 21+600 50 TCS IV A 70 30+618 30+650 32 TCS IV 71 30+650 30+700 50 TCS IV 72 30+700 30+800 100 TCS IV 73 30+800 30+918 118 TCS IV 74 33+268 33+300 32 TCS IV 75 33+300 33+350 50 TCS IV 76 33+350 33+550 200 TCS IV 77 33+550 33+600 50 TCS IV 78 33+600 33+618 18 TCS IV