SCHEDULE ESTIMATION EQUIPMENT PRODUCTION CAPACITY

REFF: PERMEN PUPR NO 28/PRT/M/2016

WBS DESCRIPTION CODE COEFF UNIT


1 BULLDOZER
1.1 Machine Specification
Engine Power Pw 75.00 HP
Blade/ Bucket Width L 3.18 M1
Blade/ Bucket Hight H 1.30 M1
Blade/ Bucket Capacity q 5.37 M3 Bucket Capacity = L x
Machine Working Efficiency Fa 0.75 Good = 0.83; Fair = 0.
Machine Blade Factor Fb 1.00 By Default (1) Standar
Blade Inclination Factor Fm 0.70 Flat = 1; Sloping -15%
1.2 Machine Time Cycle
Striping Speed Vf 3.00 Km/Hr ** Based on product C
Reverse Speed Vr 4.20 Km/Hr ** Based on product C
Planned Stripng Distance/ Tack l 30.00 M 1

Overlaping Width Lo 0.30 M1


Number of Machine Track n 3.00𝑇�= ∑24_(𝑛−1)^𝑛▒𝑇𝑛
** With Asupmtion 15 m
Delay Time/ Other T3 0.10 Mnt ** User Asuption
Cycle Time Ts 1.13 Mnt ** Striping Speed + Re

1.3 �=(�.𝐹_𝑏.𝐹_𝑚.𝐹_𝑎.60)/𝑇_�
Machine Production Capacity
Production Capacity for Soil Striping 149.77 M2/Hr

�=(�×{𝑛(𝐿−𝐿_0 )+𝐿_0 }.�_�.�_�.�_�.60)/(𝑁.𝑛.𝑇_� )


Production Capacity for Flattening 2,491.09 M2/Hr

2 EXCAVATOR BACKHOE
2.1 Machine Specification
Excavator Bucket Cavacity V 0.80 M3 PC 200 (Komatsu) or S
Bucket Fill Factor Fb 1.00 ** See Table 9, Perm
Excavator Efficiency Factor Fa 0.75 ** See Table 11, Perme
Excavation Conversion Factor Fv 1.00 ** See Table 10, Perm
𝑇�= ∑24_(𝑛−1)^𝑛▒𝑇𝑛
2.2 Machine Time Cycle
Time for Digging and Loading, etc T1 0.32 Mnt Max Duration 0.32 Min
Delay Time, etc T2 0.10 Mnt Max Duration 0.10 Min
Cycle Time Ts 0.42 Mnt
�=(�.𝐹_𝑏.𝐹_𝑎.60)/(𝑇_�.𝐹_𝑣 ).
2.3 Machine Production Capacity
Production Capacity for Soil Excavation 85.71 M2/Hr
3 DUMP TRUCK DT 3.5 T
3.1 Machine Specification
Dump truck Bucket Capacity V 3.50 Ton
Truck Efficiency Fa 0.80 Good = 0.83; Fair = 0.
Truck Speed full Loaded V1 𝑇_1=(�.60)/(𝐷.�_𝐸𝑥𝑐
20.00 Km/hr ** )See Table 8, Perm
Truck Speed No Loaded V2 35.00 Km/hr ** See Table 8, Perm
Material Desnity D 1.60 Ton/M 3
Common Soil
3.2 Machine Cycle Time
Loading Time T1 1.53 Minute ** Assume Loading us
𝑇�= ∑24_(𝑛−1)^𝑛▒𝑇𝑛
Temp Stockpile Distance L 1.50 Km ** Assume The Distanc
Delivery Time (Loaded) T2 4.50 Mnt
�=(�.𝐹_𝑎.60)/(𝐷.𝑇_� ). loaded)
Return Time (Un T3 2.57 Mnt
Delay Time T4 1.00 Mnt
Cycle Time Ts 9.60 Mnt
3.3 Machine Production Capacity
Production Capacity for Dump Truck DT 3.5 Ton 10.93 M3/Hr

4 DUMP TRUCK DT 10 T
4.1 Machine Specification
Dump truck Bucket Capacity V 10.00 Ton
𝑇_1=(�.60)/(𝐷.�_𝐸𝑥𝑐 )
Truck Efficiency Fa 0.80 Good = 0.83; Fair = 0.
Truck Speed full Loaded V1 20.00 Km/hr ** See Table 8, Perm
Truck Speed No Loaded V2 35.00 Km/hr ** See Table 8, Perm
Material Desnity D 1.60 Ton/M 3
Common Soil
4.2 Machine Cycle Time 𝑇�= ∑24_(𝑛−1)^𝑛▒𝑇𝑛
Loading Time T1 4.38 Minute ** Assume Loading us

Temp Stockpile
�=(�.𝐹_𝑎.60)/(𝐷.𝑇_� ). Distance L 1.50 Km ** Assume The Distanc
Delivery Time (Loaded) T2 4.50 Mnt
Return Time (Un loaded) T3 2.57 Mnt
Delay Time T4 1.00 Mnt
Cycle Time Ts 12.45 Mnt
4.3 Machine Production Capacity
Production Capacity for Dump Truck DT 10 Ton Q 24.10 M3/Hr

5 MOTOR GRADER
5.1 Machine Specification
Operatinal Wight Capacity 10,800.00 Kgs
Engine Power Pw 135.00 HP
Blade Length L 3.71 (𝐿_(ℎ,).60)/
Mtr
(�.1000).
Effective Blade Length b 2.60𝑇�= Mtr
𝑇�= ∑_(𝑛−1)^𝑛▒𝑇𝑛
∑24_(𝑛−1)^𝑛▒𝑇𝑛
Overlap Width bo 0.30 Mtr
Average Operational Speed Vt 5.00 Km/hr ** See the Product Spe
Working)+𝑏_0
�=(𝐿_ℎ.{𝑛.(𝑏−𝑏_� Effeciency
}.𝐹_𝑎Factor
60)/(𝑁.𝑛.𝑇_� ). Fa 0.60 ** See Table 12, Perm
5,2 Machine Cycle Time
Flattening/Spreading Length Lh 100.00 Mtr ** Construction Pannin
Track)+𝑏_0
�=(𝐿_ℎ.{𝑛.(𝑏−𝑏_� Numer}.𝐹_𝑎 60.𝑡)/(𝑁.𝑛.𝑇_�.𝐹_𝑘 ) n 2.00 Trx ** Estimate 6 m Road
Estimate Time for one Track T1 1.20 Minute Formula
Delay Time, etc T2 0.25 Minute
�=(𝐿_ℎ.{𝑛.(𝑏−𝑏_� )+𝑏_0 }.𝐹_𝑎 60)/(𝑁.𝑛.𝑇_� ).
Cycle Time Ts 1.45 Minute Formula
5.3 Machine Production Capacity
a Production Capacity Motor Grader for Overlay Spread 6,082.76 M2/Hr Flattening/ Leveling of
Effeciency Fact Fa 0.60

b Production Capacity Motor Grader for Spreading Materials 608.28 M2/Hr Speading Solid Materi
with Thickness t 0.10 Mtr
Fk 1.00
c Production Capacity Motor Grader for Grading/ Stiping Q 6,082.76 M2/Hr Flattening / Striping
Effeciency Fact Fa 0.60

6 �=((𝑏_�.�.1000).𝑡.𝐹_𝑎)/(𝑛.).
Vibrator Roller 𝑏�=𝑏−𝑏�
6.1 Machine Specification
Weight 7.05 Ton
Roller Width b 1.68 Mtr
Machine Efficiency Factor Fa 0.80 ** Good Conditions
Average Operational Speed V 4.00 Km/hr
Compaction Layer Thickness t 0.25 Mtr
Number of Passing Track n 8.00
Overlap Width bo 0.20 Mtr
6.2 Machine Production Capacity
Production Capacity Vibro Roller for Compaction 148.00 M3/Hr Flattening/ Leveling of

�=(�. 〖𝐹 _𝑏.𝐹 〗 _𝑎.60)/𝑇_� .


7 Wheall Loader
7.1 Machine Specification
Bucket Capacity V 1.50 M3
Engine Power Pw 96.00 HP
Machine Efficiency Factor Fa 0.75 ** See Table 04, Permen
Bucket Efficiency Factor Fb 1.00 ** See Table 10, Permen
7.2 Machine Cycle Time
Wheal Loader Cycle Time Standards Ts 0.45 Mnt ** Standard as / Permen
7.3 Machine Production Capacity
Production Capacity Vibro Roller for Compaction 150.00 M3/Hr Flattening/ Leveling of
�=(𝑃_𝑎.𝐹_𝑎 60)/(𝑊_𝑐.1000).
8 Water Tank Truck
8.1 Machine Specification
Water Tank Capacity V 4,000.00 Ltr
Max Pumping Capacity Pa 100.00 Ltr/Mnt
Efficiency Factor Fa 0.80
Production Requirement
Water Required Wc 1.00 ,---/M3
8.2 Machine Production Capacity
Production Capacity Water Truck 4.80 M3/Hr Flattening/ Leveling of

9 Water Pump
9.1 Machine Specification
Machine Capacity Pw 6.00 Hp
Diameter Pipe D 3.00 Inc
Max Production Capacity Q 4.50 M3/Hr
9.2 Machine Production Capacity
Production Capacity Water Pump 4.05 M3/Hr Based on Data Sheet
Efficiency Factor 0.90
REMARK

Bucket Capacity = L x H2 (M3)


Good = 0.83; Fair = 0.75; Bad = 0,67; Worse = 0.58)
By Default (1) Standard for good condition of Blade
Flat = 1; Sloping -15% = 1.2; Sloping +15% = 1

** Based on product Catalogue


** Based on product Catalogue

** With Asupmtion 15 m wide striping corriodor


** User Asuption
** Striping Speed + Reverse Speed + Delay Time

PC 200 (Komatsu) or Simmilar


** See Table 9, Permen PUPR No.28/PRT/M/2016
** See Table 11, Permen PUPR No.28/PRT/M/2016
** See Table 10, Permen PUPR No.28/PRT/M/2016

Max Duration 0.32 Minuts


Max Duration 0.10 Minuts
Good = 0.83; Fair = 0.80; Bad = 0,75; Worse = 0.7)
** See Table 8, Permen PUPR No.28/PRT/M/2016
** See Table 8, Permen PUPR No.28/PRT/M/2017
Common Soil

** Assume Loading using Excavator PC 200

** Assume The Distance of Stockpile "x" Km

Good = 0.83; Fair = 0.80; Bad = 0,75; Worse = 0.7)


** See Table 8, Permen PUPR No.28/PRT/M/2016
** See Table 8, Permen PUPR No.28/PRT/M/2017
Common Soil

** Assume Loading using Excavator PC 200

** Assume The Distance of Stockpile "x" Km

60

0)/
** See the Product Specification Data Sheet
** See Table 12, Permen PUPR No.28/PRT/M/2016

** Construction Panning
** Estimate 6 m Road width

Flattening/ Leveling of Overlayed Material

Speading Solid Material

Flattening / Striping

𝑏�=𝑏−𝑏�

** Good Conditions

Flattening/ Leveling of Overlayed Material

** See Table 04, Permen PUPR No.28/PRT/M/2016


** See Table 10, Permen PUPR No.28/PRT/M/2016

** Standard as / Permen PUPR No.28/PRT/M/2016

Flattening/ Leveling of Overlayed Material


Flattening/ Leveling of Overlayed Material

Based on Data Sheet Product


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan ASPHALT MIXING PLANT ( E 01 )


2 Tenaga Pw 294.00
3 Kapasitas Cp 60.00
4 Alat Baru : a. Umur Ekonomis A 10.00
b. Jam Kerja Dalam 1 Tahun W 1,500.00
c. Harga Alat B 3,135,000,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 10.00


b. Jam Kerja Dalam 1 Tahun W' 1,500.00
c. Harga Alat (*) B' 3,135,000,000.00
6 Kapastas tangki aspal Ca 30,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 313,500,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.19925


(1 + i) ^ A' - 1
3 Biaya Pasti Per Jam
a. Biaya Pengembalian Modal = (B' - C) x D E 374,793.13
W'

b. Asuransi Dll = 0,002 x B' F 4,180.00


W'

Biaya Pasti Per Jam = (E + F) G 378,973.13

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 357,518.70


Bahan Bakar Pemanasan Material = 12 x 0,7Cp x Ms H2 4,085,928.00
Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms H3 243,210.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 147,735.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 313,500.00
W'
4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71

5 Pembantu Operator = ( 3 Orang / Jam) x U2 M 29,142.86

Biaya Operasi per Jam = ( H + I + K + L + M ) P 5,191,320.27

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 5,570,293.40


DIBULATKAN 5,570,200.00
E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


Analisa Alat 2016 9 dari 92
2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 8,107.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan ASPHALT FINISHER ( E 02 )


2 Tenaga Pw 47.00
3 Kapasitas Cp 6.00
4 Alat Baru : a. Umur Ekonomis A 6.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 1,150,000,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 6.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 1,150,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 115,000,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.26424


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 136,742.60
W'

b. Asuransi Dll = 0,002 x B' F 1,150.00


W'

Biaya Pasti Per Jam = (E + F) G 137,892.60

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 39,832.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 23,617.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 86,250.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29


Analisa Alat 2016 10 dari 92
Biaya Operasi per Jam = ( H + I + K + L + M ) P 173,700.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 311,592.60

DIBULATKAN 311,500.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan ASPHALT SPRAYER ( E 03 )


2 Tenaga Pw 15.00
3 Kapasitas Cp 800.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 116,160,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 116,160,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 11,616,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 15,593.55
Analisa Alat 2016 11 dari 92
W'

b. Asuransi Dll = 0,002 x B' F 116.16


W'

Biaya Pasti Per Jam = (E + F) G 15,709.71

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 12,712.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 7,537.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 8,712.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 52,962.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 68,671.71


DIBULATKAN 68,600.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

Analisa Alat 2016 12 dari 92


1 Jenis Peralatan BULLDOZER 100-150 HP ( E 04 )
2 Tenaga Pw 140.00
3 Kapasitas Cp -
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 880,000,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 880,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 88,000,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 118,132.96
W'

b. Asuransi Dll = 0,002 x B' F 880.00


W'

Biaya Pasti Per Jam = (E + F) G 119,012.96

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 118,650.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 70,350.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 66,000.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 279,000.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 398,012.96


DIBULATKAN 398,000.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 13 dari 92


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan COMPRESSOR 4000-6500 L\M ( E 05 )


2 Tenaga Pw 80.00
3 Kapasitas Cp -
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 275,000,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 275,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 27,500,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 36,916.55
W'

b. Asuransi Dll = 0,002 x B' F 275.00


W'

Biaya Pasti Per Jam = (E + F) G 37,191.55

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 67,800.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 40,200.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 20,625.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


Analisa Alat 2016 14 dari 92
5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 152,625.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 189,816.55


DIBULATKAN 189,800.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan CONCRETE MIXER 0,3 - 0,6 M3 ( E 06 )


2 Tenaga Pw 15.00
3 Kapasitas Cp 500.00
4 Alat Baru : a. Umur Ekonomis A 4.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 13,000,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 13,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 1,300,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.35027


(1 + i) ^ A' - 1

Analisa Alat 2016 15 dari 92


3 Biaya Pasti Per Jam
a. Biaya Pengembalian Modal = (B' - C) x D E 2,049.05
W'

b. Asuransi Dll = 0,002 x B' F 13.00


W'

Biaya Pasti Per Jam = (E + F) G 2,062.05

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 12,712.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 7,537.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 975.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 45,225.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 47,287.05


DIBULATKAN 47,200.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

Analisa Alat 2016 16 dari 92


A URAIAN PERALATAN

1 Jenis Peralatan CRANE 10 - 15 TON ( E 07 )


2 Tenaga Pw 150.00
3 Kapasitas Cp 15.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 151,250,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 151,250,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 15,125,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 20,304.10
W'

b. Asuransi Dll = 0,002 x B' F 151.25


W'

Biaya Pasti Per Jam = (E + F) G 20,455.35

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 127,125.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 75,375.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 11,343.75
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 237,843.75

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 258,299.10


DIBULATKAN 258,200.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 17 dari 92


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan DUMP TRUCK 3 - 4 M3 ( E 08 )


2 Tenaga Pw 100.00
3 Kapasitas Cp 6.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 186,000,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 186,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 18,600,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 24,969.01
W'

b. Asuransi Dll = 0,002 x B' F 186.00


W'

Biaya Pasti Per Jam = (E + F) G 25,155.01

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 84,750.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 50,250.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 13,950.00
W'
Analisa Alat 2016 18 dari 92
4 Operator = ( 1 Orang / Jam) x U1 L 9,714.29

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,285.71

Biaya Operasi per Jam = ( H + I + K + L + M ) P 167,950.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 193,105.01


DIBULATKAN 193,100.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 9,714.29
3 Upah Pembantu Operator / Pembantu Sopir U2 9,285.71
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan DUMP TRUCK ( E 09 )


2 Tenaga Pw 125.00
3 Kapasitas Cp 8.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 232,500,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 232,500,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 23,250,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


Analisa Alat 2016 19 dari 92
(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 31,211.26
W'

b. Asuransi Dll = 0,002 x B' F 232.50


W'

Biaya Pasti Per Jam = (E + F) G 31,443.76

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 105,937.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 62,812.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 17,437.50
W'

4 Operator = ( 1 Orang / Jam) x U1 L 9,714.29

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,285.71

Biaya Operasi per Jam = ( H + I + K + L + M ) P 205,187.50

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 236,631.26


DIBULATKAN 236,600.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 9,714.29
3 Upah Pembantu Operator / Pembantu Sopir U2 9,285.71
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.
Analisa Alat 2016 20 dari 92
A URAIAN PERALATAN

1 Jenis Peralatan EXCAVATOR 80 - 140 HP ( E 10 )


2 Tenaga Pw 80.00
3 Kapasitas Cp 0.50
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 961,950,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 961,950,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 96,195,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 129,134.09
W'

b. Asuransi Dll = 0,002 x B' F 961.95


W'

Biaya Pasti Per Jam = (E + F) G 130,096.04

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 67,800.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 40,200.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 72,146.25
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 204,146.25

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 334,242.29


DIBULATKAN 334,200.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
Analisa Alat 2016 21 dari 92
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan FLAT BED TRUCK 3 - 4 M3 ( E 11 )


2 Tenaga Pw 100.00
3 Kapasitas Cp 4.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 190,235,000.00

5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00


b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 190,235,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 19,023,500.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 25,537.53
W'

b. Asuransi Dll = 0,002 x B' F 190.24


W'

Biaya Pasti Per Jam = (E + F) G 25,727.76

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 84,750.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 50,250.00

3 Perawatan Dan Perbaikan


Analisa Alat 2016 22 dari 92
= ( 12,5 % - 17,5 % ) x B' K 14,267.63
W'

4 Operator = ( 1 Orang / Jam) x U1 L 9,714.29

5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,285.71

Biaya Operasi per Jam = ( H + I + K + L + M ) P 168,267.63

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 193,995.39


DIBULATKAN 193,900.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 9,714.29
3 Upah Pembantu Operator / Pembantu Sopir U2 9,285.71
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan GENERATOR SET ( E 12 )


2 Tenaga Pw 175.00
3 Kapasitas Cp 125.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 217,800,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 217,800,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 21,780,000.00

Analisa Alat 2016 23 dari 92


2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832
(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 29,237.91
W'

b. Asuransi Dll = 0,002 x B' F 217.80


W'

Biaya Pasti Per Jam = (E + F) G 29,455.71

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 148,312.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 87,937.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 16,335.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 10,714.29


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 273,013.57

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 302,469.28


DIBULATKAN 302,400.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Mekanik U1 10,714.29
3 Upah Pembantu Mekanik U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 24 dari 92


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan MOTOR GRADER >100 HP ( E 13 )


2 Tenaga Pw 125.00
3 Kapasitas Cp -
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 1,501,500,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 1,501,500,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 150,150,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 201,564.36
W'

b. Asuransi Dll = 0,002 x B' F 1,501.50


W'

Biaya Pasti Per Jam = (E + F) G 203,065.86

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 105,937.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 62,812.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 112,612.50
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 305,362.50

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 508,428.36


DIBULATKAN 508,400.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
Analisa Alat 2016 25 dari 92
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan TRACK LOADER 75 - 100 HP ( E 14 )


2 Tenaga Pw 90.00
3 Kapasitas Cp 1.60
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 698,500,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 698,500,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 69,850,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 93,768.04
W'

b. Asuransi Dll = 0,002 x B' F 698.50


W'

Biaya Pasti Per Jam = (E + F) G 94,466.54

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 76,275.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 45,225.00

Analisa Alat 2016 26 dari 92


3 Perawatan Dan Perbaikan
= ( 12,5 % - 17,5 % ) x B' K 52,387.50
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 197,887.50

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 292,354.04


DIBULATKAN 292,300.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan WHEEL LOADER 1,0 - 1,6 M3 ( E 15 )


2 Tenaga Pw 105.00
3 Kapasitas Cp 1.50
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 825,000,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 825,000,000.00

B BIAYA PASTI PER JAM KERJA

Analisa Alat 2016 27 dari 92


1 Nilai Sisa Alat = 10% x B C 82,500,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 110,749.65
W'

b. Asuransi Dll = 0,002 x B' F 825.00


W'

Biaya Pasti Per Jam = (E + F) G 111,574.65

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 88,987.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 52,762.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 61,875.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 227,625.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 339,199.65


DIBULATKAN 339,100.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 28 dari 92


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan THREE WHEEL ROLLER 6 - 8 T ( E 16 )


2 Tenaga Pw 55.00
3 Kapasitas Cp 8.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 412,500,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 412,500,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 41,250,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 55,374.82
W'

b. Asuransi Dll = 0,002 x B' F 412.50


W'

Biaya Pasti Per Jam = (E + F) G 55,787.32

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 46,612.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 27,637.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 30,937.50
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 129,187.50

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 184,974.82


DIBULATKAN 184,900.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
Analisa Alat 2016 29 dari 92
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan TANDEM ROLLER 6 - 8 T ( E 17 )


2 Tenaga Pw 50.00
3 Kapasitas Cp 8.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 473,000,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 473,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 47,300,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 63,496.47
W'

b. Asuransi Dll = 0,002 x B' F 473.00


W'

Biaya Pasti Per Jam = (E + F) G 63,969.47

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 42,375.00

Analisa Alat 2016 30 dari 92


2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 25,125.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 35,475.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 126,975.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 190,944.47


DIBULATKAN 190,900.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan TYRE ROLLER ( E 18 )


2 Tenaga Pw 60.00
3 Kapasitas Cp 10.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 1,800.00
c. Harga Alat B 652,204,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 1,800.00
c. Harga Alat (*) B' 652,204,000.00

Analisa Alat 2016 31 dari 92


B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 65,220,400.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 97,281.30
W'

b. Asuransi Dll = 0,002 x B' F 724.67


W'

Biaya Pasti Per Jam = (E + F) G 98,005.97

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 50,850.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 30,150.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 54,350.33
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 159,350.33

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 257,356.30


DIBULATKAN 257,300.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 32 dari 92


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan VIBRATORY ROLLER 5 - 8 T ( E 19 )


2 Tenaga Pw 75.00
3 Kapasitas Cp 7.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 385,000,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 385,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 38,500,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 51,683.17
W'

b. Asuransi Dll = 0,002 x B' F 385.00


W'

Biaya Pasti Per Jam = (E + F) G 52,068.17

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 63,562.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 37,687.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 28,875.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 154,125.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 206,193.17


DIBULATKAN 206,100.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
Analisa Alat 2016 33 dari 92
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan CONCRETE VIBRATOR ( E 20 )


2 Tenaga Pw 10.00
3 Kapasitas Cp 0.00
4 Alat Baru : a. Umur Ekonomis A 4.00
b. Jam Kerja Dalam 1 Tahun W 1,000.00
c. Harga Alat B 13,750,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00
b. Jam Kerja Dalam 1 Tahun W' 1,000.00
c. Harga Alat (*) B' 13,750,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 1,375,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.35027


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 4,334.53
W'

b. Asuransi Dll = 0,002 x B' F 27.50


W'

Biaya Pasti Per Jam = (E + F) G 4,362.03

C. BIAYA OPERASI PER JAM KERJA

Analisa Alat 2016 34 dari 92


1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 8,475.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 5,025.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 2,062.50
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 39,562.50

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 43,924.53


DIBULATKAN 43,900.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan STONE CRUSHER ( E 21 )


2 Tenaga Pw 220.00
3 Kapasitas Cp 50.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 1,980,000,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
Analisa Alat 2016 35 dari 92
c. Harga Alat (*) B' 1,980,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 198,000,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 265,799.16
W'

b. Asuransi Dll = 0,002 x B' F 1,980.00


W'

Biaya Pasti Per Jam = (E + F) G 267,779.16

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 186,450.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 110,550.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 148,500.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 469,500.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 737,279.16


DIBULATKAN 737,200.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 36 dari 92


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan Water Pump 70 - 100 mm ( E 22 )


2 Tenaga Pw 6.00
3 Kapasitas Cp 0.00
4 Alat Baru : a. Umur Ekonomis A 2.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 16,500,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 2.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 16,500,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 1,650,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.61512


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 4,567.24
W'

b. Asuransi Dll = 0,002 x B' F 16.50


W'

Biaya Pasti Per Jam = (E + F) G 4,583.74

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 5,085.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 3,015.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 1,237.50
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 33,337.50

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 37,921.24


DIBULATKAN 37,900.00

E LAIN-LAIN

Analisa Alat 2016 37 dari 92


1 Tingkat Suku Bunga is 15.00
2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan Water Tanker 3000 - 4500 L ( E 23 )


2 Tenaga Pw 100.00
3 Kapasitas Cp 4,000.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 158,000,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 158,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 15,800,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 21,210.24
W'

b. Asuransi Dll = 0,002 x B' F 158.00


W'

Biaya Pasti Per Jam = (E + F) G 21,368.24

Analisa Alat 2016 38 dari 92


C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 84,750.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 50,250.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 11,850.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 170,850.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 192,218.24


DIBULATKAN 192,200.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan PEDESTRIAN ROLLER ( E 24 )


2 Tenaga Pw 11.00
3 Kapasitas Cp 0.980
4 Alat Baru : a. Umur Ekonomis A 4.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 66,000,000.00
Analisa Alat 2016 39 dari 92
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 66,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 6,600,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.35027


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 10,402.88
W'

b. Asuransi Dll = 0,002 x B' F 66.00


W'

Biaya Pasti Per Jam = (E + F) G 10,468.88

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 9,322.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 5,527.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 4,950.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 43,800.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 54,268.88


DIBULATKAN 54,200.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 40 dari 92


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan STAMPER ( E 25 )


2 Tenaga Pw 5.00
3 Kapasitas Cp 0.170
4 Alat Baru : a. Umur Ekonomis A 4.00
b. Jam Kerja Dalam 1 Tahun W 1,000.00
c. Harga Alat B 16,300,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00
b. Jam Kerja Dalam 1 Tahun W' 1,000.00
c. Harga Alat (*) B' 16,300,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 1,630,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.35027


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 5,138.39
W'

b. Asuransi Dll = 0,002 x B' F 32.60


W'

Biaya Pasti Per Jam = (E + F) G 5,170.99

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 4,237.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 2,512.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 2,445.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 33,195.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 38,365.99


DIBULATKAN 38,300.00

Analisa Alat 2016 41 dari 92


E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan JACK HAMMER ( E 26 )


2 Tenaga Pw 3.00
3 Kapasitas Cp 0.00
4 Alat Baru : a. Umur Ekonomis A 4.00
b. Jam Kerja Dalam 1 Tahun W 1,000.00
c. Harga Alat B 11,500,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00
b. Jam Kerja Dalam 1 Tahun W' 1,000.00
c. Harga Alat (*) B' 11,500,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 1,150,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.35027


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 3,625.25
W'

b. Asuransi Dll = 0,002 x B' F 23.00


W'

Analisa Alat 2016 42 dari 92


Biaya Pasti Per Jam = (E + F) G 3,648.25

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 2,542.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 1,507.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 1,725.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 29,775.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 33,423.25


DIBULATKAN 33,400.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan FULVI MIXER ( E 27 )


2 Tenaga Pw 75.00
3 Kapasitas Cp 0.00
4 Alat Baru : a. Umur Ekonomis A 5.00
Analisa Alat 2016 43 dari 92
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 900,000,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 900,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 90,000,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 120,817.80
W'

b. Asuransi Dll = 0,002 x B' F 900.00


W'

Biaya Pasti Per Jam = (E + F) G 121,717.80

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 63,562.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 37,687.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 67,500.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 192,750.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 314,467.80


DIBULATKAN 314,400.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 44 dari 92


NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan BLENDING EQUIPMENT ( E 52 )


2 Tenaga Pw 50.00
3 Kapasitas Cp 30.00
4 Alat Baru : a. Umur Ekonomis A 10.00
b. Jam Kerja Dalam 1 Tahun W 1,500.00
c. Harga Alat B 500,000,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 10.00
b. Jam Kerja Dalam 1 Tahun W' 1,500.00
c. Harga Alat (*) B' 500,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 50,000,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.19925


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 59,775.62
W'

b. Asuransi Dll = 0,002 x B' F 666.67


W'

Biaya Pasti Per Jam = (E + F) G 60,442.29

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 42,375.00

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 25,125.00

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 50,000.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 141,500.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 201,942.29


Analisa Alat 2016 45 dari 92
DIBULATKAN 201,900.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

NO U R A I A N KODE KOEF.

A URAIAN PERALATAN

1 Jenis Peralatan ASPALT DITRIBUTOR ( E 41 )


2 Tenaga Pw 115.00
3 Kapasitas Cp 4,000.00
4 Alat Baru : a. Umur Ekonomis A 5.00
b. Jam Kerja Dalam 1 Tahun W 2,000.00
c. Harga Alat B 395,000,000.00
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00
b. Jam Kerja Dalam 1 Tahun W' 2,000.00
c. Harga Alat (*) B' 395,000,000.00

B BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat = 10% x B C 39,500,000.00

2 Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.29832


(1 + i) ^ A' - 1

3 Biaya Pasti Per Jam


a. Biaya Pengembalian Modal = (B' - C) x D E 53,025.59
W'

b. Asuransi Dll = 0,002 x B' F 395.00


Analisa Alat 2016 46 dari 92
W'

Biaya Pasti Per Jam = (E + F) G 53,420.59

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms H1 97,462.50

2 Pelumas = ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp I 57,787.50

3 Perawatan Dan Perbaikan


= ( 12,5 % - 17,5 % ) x B' K 29,625.00
W'

4 Operator = ( 1 Orang / Jam) x U1 L 14,285.71


5 Pembantu Operator = ( 1 Orang / Jam) x U2 M 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M ) P 208,875.00

D TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) T 262,295.59


DIBULATKAN 262,200.00

E LAIN-LAIN

1 Tingkat Suku Bunga is 15.00


2 Upah Operator / Sopir U1 14,285.71
3 Upah Pembantu Operator / Pembantu Sopir U2 9,714.29
4 Bahan Bakar Bensin Mb 5,650.00
5 Bahan Bakar Solar Ms 5,650.00
6 Minyak Pelumas Mp 33,500.00
7 PPN diperhitungkan pada Lembar Rekapitulasi
Biaya Pekerjaan

Analisa Alat 2016 47 dari 92


SATUAN KET.

MIXING PLANT ( E 01 )
HP
Ton/Jam
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru
liter

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah Khusus AMP
Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Analisa Alat 2016 48 dari 92
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

LT FINISHER ( E 02 )
HP
Ton
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Analisa Alat 2016 49 dari 92
Rupiah

Rupiah

Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

LT SPRAYER ( E 03 )
HP
LITER
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah
Analisa Alat 2016 50 dari 92
Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

Analisa Alat 2016 51 dari 92


ER 100-150 HP ( E 04 )
HP
-
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 52 dari 92


SATUAN KET.

OR 4000-6500 L\M ( E 05 )
HP
-
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Analisa Alat 2016 53 dari 92
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

MIXER 0,3 - 0,6 M3 ( E 06 )


HP
LITER
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Analisa Alat 2016 54 dari 92


Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

Analisa Alat 2016 55 dari 92


10 - 15 TON ( E 07 )
HP
TON
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 56 dari 92


SATUAN KET.

RUCK 3 - 4 M3 ( E 08 )
HP
TON
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016 57 dari 92


Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

MP TRUCK ( E 09 )
HP
TON
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah
Analisa Alat 2016 58 dari 92
Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.
Analisa Alat 2016 59 dari 92
OR 80 - 140 HP ( E 10 )
HP
M3
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Analisa Alat 2016 60 dari 92
SATUAN KET.

TRUCK 3 - 4 M3 ( E 11 )
HP
M3
Tahun
Jam
Rupiah

Tahun Alat Baru


Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016 61 dari 92


Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

RATOR SET ( E 12 )
HP
Kva
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Analisa Alat 2016 62 dari 92


Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 63 dari 92


SATUAN KET.

GRADER >100 HP ( E 13 )
HP
-
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Analisa Alat 2016 64 dari 92
SATUAN KET.

ADER 75 - 100 HP ( E 14 )
HP
M3
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016 65 dari 92


Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

ADER 1,0 - 1,6 M3 ( E 15 )


HP
M3
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Analisa Alat 2016 66 dari 92


Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 67 dari 92


SATUAN KET.

EEL ROLLER 6 - 8 T ( E 16 )
HP
M3
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Analisa Alat 2016 68 dari 92
Liter
Liter

SATUAN KET.

ROLLER 6 - 8 T ( E 17 )
HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016 69 dari 92


Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

E ROLLER ( E 18 )
HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Analisa Alat 2016 70 dari 92


Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 71 dari 92


SATUAN KET.

Y ROLLER 5 - 8 T ( E 19 )
HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Analisa Alat 2016 72 dari 92
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

ETE VIBRATOR ( E 20 )
HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016 73 dari 92


Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

E CRUSHER ( E 21 )
HP
TON/jam
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Analisa Alat 2016 74 dari 92
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 75 dari 92


SATUAN KET.

mp 70 - 100 mm ( E 22 )
HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

Analisa Alat 2016 76 dari 92


%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

ker 3000 - 4500 L ( E 23 )


HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016 77 dari 92


Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

RIAN ROLLER ( E 24 )
HP
TON
Tahun
Jam
Rupiah
Analisa Alat 2016 78 dari 92
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 79 dari 92


SATUAN KET.

TAMPER ( E 25 )
HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

Analisa Alat 2016 80 dari 92


%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

K HAMMER ( E 26 )
HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016 81 dari 92


Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

LVI MIXER ( E 27 )
HP
TON
Tahun
Analisa Alat 2016 82 dari 92
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 83 dari 92


SATUAN KET.

NG EQUIPMENT ( E 52 )
HP
TON
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Analisa Alat 2016 84 dari 92
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

T DITRIBUTOR ( E 41 )
HP
Liter
Tahun
Jam
Rupiah
Tahun Alat Baru
Jam Alat Baru
Rupiah Alat Baru

Rupiah

Rupiah

Rupiah

Rupiah
Analisa Alat 2016 85 dari 92
Rupiah

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

%/Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Analisa Alat 2016 86 dari 92


1. Wind Farm Civil Works

No. DESCRIPTION CODE UNIT

I EQUIPMENT RENTAL COST


Asphalt Mixing Plant E 01 / Hour
Asphalt Finisher E 02 / Hour
Asphalt Sprayer E 03 / Hour
Bulldozer 1000-1500 HP E 04 / Hour
Compressor 4000-6500 L\M E 05 / Hour
Concrete Mixer 0,3 - 0,6 m3 E 06 / Hour
Crane 10 - 15 ton E 07 / Hour
Dump Truck 3 - 4 m3 E 08 / Hour
Dump Truck E 09 / Hour
Excavator 80 - 140 m3 E 10 / Hour
Flat Bed Truck 3 - 4 m3 E 11 / Hour
Generator Set E 12 / Hour
Motor Grader >100 HP E 13 / Hour
Track Loader 75-100 HP E 14 / Hour
Wheel Loader 1,0 - 1,6 m3 E 15 / Hour
Three Wheel Roller 6-8 Ton E 16 / Hour
Tandem Roller 6-9 ton E 17 / Hour
Tyre Roller 8 - 10 T E 18 / Hour
Vibratory Roller 5 - 8 T E 19 / Hour
Concrete Vibrator E 20 / Hour
Stone Crusher E 21 / Hour
Water Pump 70 - 100 mm E 22 / Hour
Water Tanker 3000 - 4500 L E 23 / Hour
Pedestrian Roller E 24 / Hour
Stamper E 25 / Hour
Jack Hammer E 26 / Hour
Fulvi Mixer E 27 / Hour
Aspalt Distributor E 41 / Hour
Concrete Paver E 28 / Hour
Concrete Trowel E 29 / Hour
Concrete Cutter E 30 / Hour
Welding Las E 31 / Hour
Batching Plant E 32 / Hour
Blending Equipment E 52 / Hour
Supporting Tools / Hour
Supporting Tools (Hose + Tas Lab) / Hour

II EQUIPMENT COMPONENT COST


Interest Rate ( %/Tahun ) / Year
Operator / Driver / Hour
Operator / Driver Helper / Hour
Fuel Gasoline / Liter
Fuel Diesel Solar / Liter
Fuel Diesel Solar Industrial / Liter
Oil Machine / Liter

III MAN POWER COST


Pekerja L 01 / Hour
Tukang L 02 / Hour
Mandor L 03 / Hour
Operator terlatih L 04 / Hour
Pembantu Operator L 05 / Hour
Sopir matrial L 06 / Hour
Pembantu Sopir L 07 / Hour
Mekanik terlatih L 08 / Hour
Pembantu Mekanik L 09 / Hour
Kepala Tukang / Hour
Tukang Las Konstruksi / Hour

IV COMMON CIVIL WORK MATERIAL


Pasir MR. 01 Cubic m
Batu Kali MR. 02 Cubic m
Sirtu MR. 16 Cubic m

Pasir Agregat M 01 Cubic m


Batu Agregat M 02 Cubic m
Agregat Kasar M 03 Cubic m
Agregat Halus M 04 Cubic m
Semen/Filler M 05 Kgs
Material Tanah Timbunan M 08 Cubic m
Material Tanah Pilihan M 09 Cubic m
Aspal Curah M 10 Kgs
Kerosene / Minyak Aspal M 11 Ltr
Semen (50 kg) M 12 Zak
Besi Beton M 13 Kgs
Kawat Beton M 14 Kgs
Sirtu M 16 Cubic m
Paku M 18 Kgs
Kayu Perancah M 19 Cubic m
Solar M 21 Ltr
Solar industri M 21 A Ltr
Minyak Pelumas M 22 Ltr
Agregat A M 26 Cubic m
Agregat B M 27 Cubic m
Aspal Drum M 31 Kgs
Baja IWF M 39 Kgs
Pasir Urug M 44 Cubic m
Besi Beton M 20 Kgs
Dolken Ø 8 - 10 cm M 45 m'
Plastik M 51 Sq m
Agregat Pecah Mesin 0-5 mm M91 Cubic m
Agregat Pecah Mesin 5-10 & 10-20 mm M92 Cubic m
Agregat Pecah Mesin 20-30 mm M93 Cubic m
Pasir pasang / beton Cubic m
Batu Blonos Cubic m
Batu Belah 10 - 15 cm M 06 Cubic m
Batu pecah tangan 5 - 7 cm Cubic m
Koral (Batu Pecah mesin 5 - 40 mm ) Cubic m
Koral (Batu Pecah tangan 5 - 40 mm ) Cubic m
Kawat Bronjong 4 mm (Galvanis) Kgs
Kantung Plastik 60x40x20 Pcs
Minyak Bekisting Ltr
Air Ltr
Kayu Bakar Cubic m
Ready Mix K.125 Cubic m
Ready Mix K.175 Cubic m
Ready Mix K.225 Cubic m
Ready Mix K.250 Cubic m
Ready Mix K.275 Cubic m
Ready Mix K.300 Cubic m
Ready Mix K.350 Cubic m
Meni Besi Kgs
Plamir tembok Kgs
Cat Dasar Kgs
Cat Tembok Kgs
Kuas 3" Pcs
Kuas 4" Pcs
Ampelas Ltr
Kapek Pcs
Keramik polos 30x30 cm Sq m
Batu bata Pcs
Semen warna Kgs
Elastomir Pcs
Shear Conector ls

IV SPECIAL CIVIL WORK MATERIAL


COEF UNIT PRICE TOTAL PRICE REMARK

1.00 5,570,200.00 5,570,200.00 Coefficient Need to


1.00 311,500.00 311,500.00 adjusted due to:
1.00 68,600.00 68,600.00
1.00 398,000.00 398,000.00
1.00 189,800.00 189,800.00
1.00 47,200.00 47,200.00
1.00 258,200.00 258,200.00
1.00 193,100.00 193,100.00
1.00 236,600.00 236,600.00
1.00 334,200.00 334,200.00
1.00 193,900.00 193,900.00
1.00 302,400.00 302,400.00
1.00 508,400.00 508,400.00
1.00 292,300.00 292,300.00
1.00 339,100.00 339,100.00
1.00 184,900.00 184,900.00
1.00 190,900.00 190,900.00
1.00 257,300.00 257,300.00
1.00 206,100.00 206,100.00
1.00 43,900.00 43,900.00
1.00 737,200.00 737,200.00
1.00 37,900.00 37,900.00
1.00 192,200.00 192,200.00
1.00 54,200.00 54,200.00
1.00 38,300.00 38,300.00
1.00 33,400.00 33,400.00
1.00 314,400.00 314,400.00
1.00 262,200.00 262,200.00
1.00 72,100.00 72,100.00
1.00 12,100.00 12,100.00
1.00 30,250.00 30,250.00
1.00 5,720.00 5,720.00
1.00 193,100.00 193,100.00
1.00 201,900.00 201,900.00
1.00 2,000.00 2,000.00
1.00 56,870.00 56,870.00

1.00 15.00 15.00


1.00 14,285.71 14,285.71
1.00 9,714.29 9,714.29
1.00 7,800.00 7,800.00
1.00 5,650.00 5,650.00
1.00 8,107.00 8,107.00
1.00 33,500.00 33,500.00

1.00 7,857.14 7,857.14


1.00 9,714.29 9,714.29
1.00 11,428.57 11,428.57
1.00 14,285.71 14,285.71
1.00 9,714.29 9,714.29
1.00 9,714.29 9,714.29
1.00 9,285.71 9,285.71
1.00 10,714.29 10,714.29
1.00 9,714.29 9,714.29
1.00 10,714.29 10,714.29
1.00 10,714.29 10,714.29

1.00 48,300.00 48,300.00


1.00 48,300.00 48,300.00
1.00 48,300.00 48,300.00

1.00 89,658.00 89,658.00


1.00 100,290.00 100,290.00
1.00 162,757.59 162,757.59
1.00 166,637.93 166,637.93
1.00 1,340.00 1,340.00
1.00 88,900.00 88,900.00
1.00 115,100.00 115,100.00
1.00 7,387.00 7,387.00
1.00 8,824.00 8,824.00
1.00 67,000.00 67,000.00
1.00 9,800.00 9,800.00
1.00 17,200.00 17,200.00
1.00 130,800.00 130,800.00
1.00 13,600.00 13,600.00
1.00 1,936,900.00 1,936,900.00
1.00 5,650.00 5,650.00
1.00 8,107.00 8,107.00
1.00 33,500.00 33,500.00
1.00 206,096.51 206,096.51
1.00 200,250.91 200,250.91
1.00 9,463.00 9,463.00
1.00 12,500.00 12,500.00
1.00 88,900.00 88,900.00
1.00 9,800.00 9,800.00
1.00 5,800.00 5,800.00
1.00 8,300.00 8,300.00
1.00 166,637.93 166,637.93
1.00 162,757.59 162,757.59
1.00 162,757.59 162,757.59
1.00 174,100.00 174,100.00
1.00 172,000.00 172,000.00
1.00 196,700.00 196,700.00
1.00 225,100.00 225,100.00
1.00 367,300.00 367,300.00
1.00 367,300.00 367,300.00
1.00 11,500.00 11,500.00
1.00 1,200.00 1,200.00
1.00 3,100.00 3,100.00
1.00 50.00 50.00
1.00 347,300.00 347,300.00
1.00 967,300.00 967,300.00
1.00 997,200.00 997,200.00
1.00 1,023,400.00 1,023,400.00
1.00 1,044,300.00 1,044,300.00
1.00 1,075,000.00 1,075,000.00
1.00 1,085,000.00 1,085,000.00
1.00 1,123,600.00 1,123,600.00
1.00 23,000.00 23,000.00
1.00 11,500.00 11,500.00
1.00 26,100.00 26,100.00
1.00 26,100.00 26,100.00
1.00 9,400.00 9,400.00
1.00 15,700.00 15,700.00
1.00 3,100.00 3,100.00
1.00 5,200.00 5,200.00
1.00 53,600.00 53,600.00
1.00 900.00 900.00
1.00 13,600.00 13,600.00
1.00 581,000.00 581,000.00
1.00 15,700.00 15,700.00