• Service Entrance
• Electric Meter
• Plans and Specification
• Design Analysis
• Branch Circuit Load Calculation
• Feeder and Service Load Calculation
SERVICE ENTRANCE
Legend
- Electrical Symbols
Schedule of Loads
- tabulated information of electrical loads, size of wire and conduit per circuit up
to service.
Lighting System Layout
- shows the lighting fixture and switches location and its wiring system.
Power Layout
- shows the location of convenience outlets, special outlets (acu, range, water
pump, water heater, etc.), panel board, meter, service head, and their wiring
system
Design Analysis
Continuous Load (Art 1.1 p.9) – A load where the maximum current is expected to continue for 3 hours or
more
Sizing of Conductors and Protective Devices
Garage – Commercial 4
Halls, corridors, closet,
Stairways
A Branch Circuit that supplies only one utilization equipment (ACU, Range,
Water Heater, Water Pump, etc.)
Range: 8000 W
Water Heater: 5000 W
Total Load
a) General Lighting
145 m2 x 24 VA/ m2 = 3480 VA
The computed load is 3480 VA/230 V =15 A
One branch circuit of 20-ampere would be theoretically adequate,
however for the flexibility and to allow future needs provide two
20 ampere branch circuits for lighting and convenience outlet.
b) Small Appliance Load
One 20-ampere @ 1500 VA = 1500 VA
Provide one 20-ampere small appliance circuit
c) Laundry Circuit
One 20-ampere @ 1500 VA = 1500 VA
Provide one 20-ampere laundry circuit
Sub-Total = 6480 VA
Application of Demand Factors
First 3000 VA @ 100% DF = 3000 VA
Remainder @ 35% DF
(3480 x 0.35) = 1218 VA
Other Loads:
One 8-kW electric range @ 80% = 6400 VA
Provide one 40-ampere electric range circuit