You are on page 1of 51

Republic of the Philippines

CITY ENGINEERING OFFICE


Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: OCTOBER 1-15, 2015

DATE DAILY ACTIVITY


10-01-2015 - Topographic survey arboretum along National Highway Brgy. Tiniwisan
10-02-2015 - Lay-out of proposed road concreting at Brgy. Sto. Niño, Butuan City
10-05-2015 - Traverse and profile survey for the proposed road concreting at South
Market at Villa Kananga, Butuan City
10-06-2015 - Traverse and profile survey for the proposed road concreting at Brgy.
Banza, Butuan City
10-07-2015 - Continuation of Traverse and profile for the proposed road concreting
at Brgy. Banza, Butuan City
10-08-2015 - Encoding survey data
10-09-2015 - Conducting project site inspection at Brgy. Pagatpatan, Butuan City
10-12-2015 - Re-survey of the proposed road concreting with drainage canal at
Brgy. Dagohoy, Butuan City
10-13-2015 - Traverse and profile survey for the proposed drainage canal at Brgy.
Jose P. Rizal, Butuan City
10-14-2015 - Traverse and profile survey for the proposed road concreting at Brgy.
Imadejas, Butuan City
10-15-2015 - Family day

Submitted by:

Signature of Employee

Checked by:

ANTONIO L. CALO, JR.


Officer In-charge Planning & Programming Division

NOTED:

LORDEN G. VISMANOS
City Engineer
Republic of the Philippines
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: OCTOBER 16-31, 2015

DATE DAILY ACTIVITY


10-16-205 - Family day
10-17-2015 - Lay-outing of corners at Barangay Tiniwisan Butuan City
10-05-2015 - Travese and Profile for the proposed road concr
Market at Villa Kananga, Butuan City
10-06-2015 - Traverse and profile survey for the proposed road concreting at Brgy.
Banza, Butuan City
10-07-2015 - Continuation of Traverse and profile for the proposed road concreting
at Brgy. Banza, Butuan City
10-08-2015 - Encoding survey data
10-09-2015 - Conducting project site inspection at Brgy. Pagatpatan, Butuan City
10-12-2015 - Re-survey of the proposed road concreting with drainage canal at
Brgy. Dagohoy, Butuan City
10-13-2015 - Traverse and profile survey for the proposed drainage canal at Brgy.
Jose P. Rizal, Butuan City
10-14-2015 - Traverse and profile survey for the proposed road concreting at Brgy.
Imadejas, Butuan City
10-15-2015 - Family day

Submitted by:

Signature of Employee

Checked by:

ANTONIO L. CALO, JR.


Officer In-charge Planning & Programming Division

NOTED:

LORDEN G. VISMANOS
City Engineer
Republic of the Philippines
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: NOVEMBER 1-15, 2015

DATE DAILY ACTIVITY


10-01-2015 - Topographic survey arboretum along National Highway Brgy. Tiniwisan
10-02-2015 - Lay-out of proposed road concreting at Brgy. Sto. Niño, Butuan City
10-05-2015 - Traverse and profile survey for the proposed road concreting at South
Market at Villa Kananga, Butuan City
10-06-2015 - Traverse and profile survey for the proposed road concreting at Brgy.
Banza, Butuan City
10-07-2015 - Continuation of Traverse and profile for the proposed road concreting
at Brgy. Banza, Butuan City
10-08-2015 - Encoding survey data
10-09-2015 - Conducting project site inspection at Brgy. Pagatpatan, Butuan City
10-12-2015 - Re-survey of the proposed road concreting with drainage canal at
Brgy. Dagohoy, Butuan City
10-13-2015 - Traverse and profile survey for the proposed drainage canal at Brgy.
Jose P. Rizal, Butuan City
10-14-2015 - Traverse and profile survey for the proposed road concreting at Brgy.
Imadejas, Butuan City
10-15-2015 - Family day

Submitted by:

Signature of Employee

Checked by:

ANTONIO L. CALO, JR.


Officer In-charge Planning & Programming Division

NOTED:

LORDEN G. VISMANOS
City Engineer
Republic of the Philippines
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: JANUARY 1-30, 2016

DATE DAILY ACTIVITY


01-04-2016 - Traverse and profile survey for the proposed road concreting at
- Barangay Mandamo,Butuan City
01-05-2016 - Encoding survey data
01-06-2016 Topographic survey for the proposed one (1) lane bridge at
- Barangay Bitan-agan,Butuan City
01-07-2016 Con't. topographic survey for the proposed one (1) lane bridge at
- Barangay Bitan-agan,Butuan City
01-08-2016 Encoding survey data
01-11-2016 - Traverse and profile survey for the proposed road concreting at
- Barangay Libertad,Butuan City
01-12-2016 - Con't.traverse and profile survey for the proposed road concreting at
Barangay Libertad,Butuan City
01-13-2016 - Con't. topographic survey for the proposed one (1) lane bridge at
Barangay Bitan-agan,Butuan City
01-14-2016 - Topographic survey for the proposed Box culvert at Barangay Los
Angeles,Butuan City
01-15-2016 - Encoding survey data
01-18-2016 - Encoding survey data
01-19-2016 - Lay-out of proposed footbridge at Brgy. M.J.Santos, Butuan City
01-20-2016 - Lay-out of proposed Box culvert at Brgy. Florida, Butuan City
01-21-2016 - Encoding survey data
01-22-2016 - Encoding survey data
01-25-2016 - Traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus
01-26-2016 - Con't.traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus
01-27-2016 - Traverse and profile survey for the proposed drainage canal at Brgy.
Bading, Butuan City
01-28-2016 - Topographic survey for the proposed footbridge at Barangay
M.J.Santos,Butuan City
01-29-2016 - Con't.traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus

Submitted by:

Signature of Employee

Checked by:

ANTONIO L. CALO, JR.


Officer In-charge Planning & Programming Division

NOTED:

LORDEN G. VISMANOS
City Engineer
Republic of the Philippines
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: JANUARY 1-30, 2016

DATE DAILY ACTIVITY


01-04-2016 - Traverse and profile survey for the proposed road concreting at
- Barangay Mandamo,Butuan City
01-05-2016 - Encoding survey data
01-06-2016 Topographic survey for the proposed one (1) lane bridge at
- Barangay Bitan-agan,Butuan City
01-07-2016 Con't. topographic survey for the proposed one (1) lane bridge at
- Barangay Bitan-agan,Butuan City
01-08-2016 Encoding survey data
01-11-2016 - Traverse and profile survey for the proposed road concreting at
- Barangay Libertad,Butuan City
01-12-2016 - Con't.traverse and profile survey for the proposed road concreting at
Barangay Libertad,Butuan City
01-13-2016 - Con't. topographic survey for the proposed one (1) lane bridge at
Barangay Bitan-agan,Butuan City
01-14-2016 - Topographic survey for the proposed Box culvert at Barangay Los
Angeles,Butuan City
01-15-2016 - Encoding survey data
01-18-2016 - Encoding survey data
01-19-2016 - Lay-out of proposed footbridge at Brgy. M.J.Santos, Butuan City
01-20-2016 - Lay-out of proposed Box culvert at Brgy. Florida, Butuan City
01-21-2016 - Encoding survey data
01-22-2016 - Encoding survey data
01-25-2016 - Traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus
01-26-2016 - Con't.traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus
01-27-2016 - Traverse and profile survey for the proposed drainage canal at Brgy.
Bading, Butuan City
01-28-2016 - Topographic survey for the proposed footbridge at Barangay
M.J.Santos,Butuan City
01-29-2016 - Con't.traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus

Submitted by:
Checked by:
Signature of Employee
ENGR. ROGER B. PEPANIA
Engineer II
Geodetic Survey & Subd.Services

Reviewed by: NOTED:

ANTONIO L. CALO, JR. LORDEN G. VISMANOS


Division Chief City Engineer
Officer In-charge Planning & Programming Division
Republic of the Philippines
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: JANUARY 1-30, 2016

DATE DAILY ACTIVITY


01-04-2016 - Traverse and profile survey for the proposed road concreting at
- Barangay Mandamo,Butuan City
01-05-2016 - Encoding survey data
01-06-2016 Topographic survey for the proposed one (1) lane bridge at
- Barangay Bitan-agan,Butuan City
01-07-2016 Con't. topographic survey for the proposed one (1) lane bridge at
- Barangay Bitan-agan,Butuan City
01-08-2016 Encoding survey data
01-11-2016 - Traverse and profile survey for the proposed road concreting at
- Barangay Libertad,Butuan City
01-12-2016 - Con't.traverse and profile survey for the proposed road concreting at
Barangay Libertad,Butuan City
01-13-2016 - Con't. topographic survey for the proposed one (1) lane bridge at
Barangay Bitan-agan,Butuan City
01-14-2016 - Topographic survey for the proposed Box culvert at Barangay Los
Angeles,Butuan City
01-15-2016 - Encoding survey data
01-18-2016 - Encoding survey data
01-19-2016 - Lay-out of proposed footbridge at Brgy. M.J.Santos, Butuan City
01-20-2016 - Lay-out of proposed Box culvert at Brgy. Florida, Butuan City
01-21-2016 - Encoding survey data
01-22-2016 - Encoding survey data
01-25-2016 - Traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus
01-26-2016 - Con't.traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus
01-27-2016 - Traverse and profile survey for the proposed drainage canal at Brgy.
Bading, Butuan City
01-28-2016 - Topographic survey for the proposed footbridge at Barangay
M.J.Santos,Butuan City
01-29-2016 - Con't.traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus

Submitted by:
Checked by:
Signature of Employee
ENGR. ROGER B. PEPANIA
Engineer II
Geodetic Survey & Subd.Services

Reviewed by:

ANTONIO L. CALO, JR.


Division Chief
Officer In-charge Planning & Programming Division

NOTED:
LORDEN G. VISMANOS
City Engineer
Republic of the Philippines
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: March 1-15, 2016

DATE DAILY ACTIVITY


03-01-2016 - Con't. traverse and profile survey for the proposed concreting @
- CSU School campos
03-02-2016 - Astake survey for the proposed drainage canal @ R.Calo street
Brgy. San Ignacio, Butuan City
03-03-2016 - Relocation survey of Barangay site @ Barangay Salvacion ,BTC.
03-04-2016 RE-Survey for the proposed concreting @ Barangay Buhangin,BTC.
03-07-2016 - Topographic survey @ Polysports Barangay Tiniwisan,Butuan City
03-08-2016 Conduct survey profile for the proposed drainage canal @ Barangay
- Raja Soliman,Butuan City
03-09-2016 - Con't Topographic survey @ Polysports Barangay Tiniwisan,Butuan City
03-10-2016 - Astake survey for the proposed road concreting @ Barangay
Diego Silang, Butuan City
03-11-2016 Conduct survey profile for the proposed spring development @
- sitio monteverde,Barangay Mla.de Bugabus , Butuan City
03-14-2016 Conduct survey profile for the proposed spring development @
- Barangay Anticala, Butuan City
03-15-2016 Astake survey for the proposed road concreting @ Barangay
Los Angeles, Butuan City

Submitted by:

Signature of Employee
Checked by:
ENGR. ROGER B. PEPANIA
Engineer II
Geodetic Survey & Subd.Services

Reviewed by:

ANTONIO L. CALO, JR.


Division Chief
Officer In-charge Planning & Programming Division

NOTED:

LORDEN G. VISMANOS
Republic of the Philippines
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: FEBRUARY 16-29, 2016

DATE DAILY ACTIVITY


02-16-2016 - AS-STAKE survey for the proposed road concreting
- w/ drainage canal @ Barangay Dagohoy
02-17-2016 - AS-STAKE survey for the proposed footbridge @Barangay M.J.Santos
02-18-2016 Con't. traverse and profile survey for the proposed drainage canal
- from Brgy. Bayanihan to Brgy.Libertad, Butuan City
02-19-2016 Con't. traverse and profile survey for the proposed drainage canal
- from Brgy. Bayanihan to Brgy.Libertad, Butuan City
02-22-2016 Lay out line canal from motorpool DPWH Doongan road
02-23-2016 - Con't. traverse and profile survey for the proposed drainage canal
- from Brgy. Bayanihan to Brgy.Libertad, Butuan City
02-24-2016 - Con't. traverse and profile survey for the proposed drainage canal
from Brgy. Bayanihan to Brgy.Libertad, Butuan City
02-25-2016 Con't. traverse and profile survey for the proposed drainage canal
- from Brgy. Bayanihan to Brgy.Libertad, Butuan City
02-26-2016 Con't. traverse and profile survey for the proposed drainage canal
- from Brgy. Bayanihan to Brgy.Libertad, Butuan City
02-29-2016 Con't.traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus

Submitted by:

Signature of Employee
Checked by:
ENGR. ROGER B. PEPANIA
Engineer II
Geodetic Survey & Subd.Services

Reviewed by:

ANTONIO L. CALO, JR.


Division Chief
Officer In-charge Planning & Programming Division

NOTED:

LORDEN G. VISMANOS

Republic of the Philippines


CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: FEBRUARY 16-29, 2016

DATE DAILY ACTIVITY


02-16-2017 - Encoding survey Data
02-17-2017 - Conduct survey profile for the prop. Spring Dev't.@ Brgy.Mandamo,BTC
02-20-2017 - Conduct survey profile for the prop. Road concreting @Brgy.Agao,BTC.

-
02-19-2016
-
02-22-2016
02-23-2016 -
-
02-24-2016 - Con't. traverse and profile survey for the proposed drainage canal
from Brgy. Bayanihan to Brgy.Libertad, Butuan City
02-25-2016 Con't. traverse and profile survey for the proposed drainage canal
-
02-26-2016 Co from Brgy. Bayanihan to Brgy.Libertad, Butuan City
-
02-29-2016 Con't.traverse and profile survey for the proposed road concreting at
CARAGA STATE UNIVERSITY school campus
Submitted by:

Signature of Employee
Checked by:

ENGR. ROGER B. PEPANIA


Engineer II
Geodetic Survey & Subd.Services

Reviewed by:

ANTONIO L. CALO, JR.


Division Chief
r In-charge Planning & Programming Division

NOTED:

LORDEN G. VISMANOS
Republic of the Philippines
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: FEBRUARY 16-28, 2017

DATE DAILY ACTIVITY


02-16-2017 - Encoding survey data
02-17-2017 - Conduct survey for the prop.spring Dev't.@Brgy.Mandamo,BTC.
02-20-2017 - Traverse and profile survey for the proposed road concreting at Brgy.
Agao, Butuan City
02-21-2017 - Traverse and profile survey for the proposed road concreting at Brgy.
Mla. De Bugabos, Butuan City
02-22-2017 - Traverse and profile survey for the proposed road concreting at Brgy.
Tandang Sora, Butuan City
02-23-2017 - Structural Survey @ Ochoa Ave.Brgy.Tandang Sora BTC.
02-24-2017 - Structural Survey @ T. Calo T. Calo street,Brgy.Tandang Sora BTC.
02-27-2017 - Encoding survey data
02-28-2017 Relocation survey @ Ampayon Elementary school
-

Submitted by:

Signature of Employee

Checked by:

ELSA A. CRUZ
Officer In-charge Planning & Programming Division

NOTED:

ROGELIO L. BATOCAEL
OIC City Engineer

Republic of the Philippines


CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: FEBRUARY 16-30, 2017

DATE DAILY ACTIVITY


04-17-2017 - Conducted reconnaizance for the prop. Road construction @PHHILRICE
04-20-2017 - Relocation survey @Los Angeles Market Site
04-21-2017 - Relocation of proposed perimeter fence @ BRGY.Dagohoy BTC.
04-24-2017 Conducted survey profile of the proposed road construction @
- PHILRICE Los Angeles Butuan City
04-25-2017 Encoding survey data
04-26-2017 - Relocation and Lay out of lots of Brgy. Subdivision @ Brgy.Salvacion btc
04-27-2017 Relocation and Lay out of lots of Brgy. Subdivision @ Brgy.Salvacion btc
-
-
-

-
Submitted by:

Signature of Employee

Checked by:

ELSA A. CRUZ
Officer In-charge Planning & Programming Division

NOTED:

ROGELIO L. BATOCAEL
OIC City Engineer
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: May 1-15, 2017

DATE DAILY ACTIVITY


05-01-2017 - HOLIDAY
05-02-2017 - Conducted survey profile of the proposed road construction @
- Barangay Bobon,Butuan City
05-03-2017 Conducted survey profile of the proposed road construction @
- Barangay Bobon,Butuan City
05-04-2017 Conducted survey profile of the proposed road construction @
- Barangay Bobon,Butuan City
05-05-2017 Conducted topographic survey of propposed wharf @ Barangay
- Bilay, Butuan City.
05-08-2017 - Conducted survey profile of the proposed road construction @
- Barangay Buhangin,Butuan City
05-09-2017 Conducted lay out of corners of the Barangay Subdivision @
- Barangay Salvacion,Butuan City
05-10-2017 Conducted stractural survey @ Grand Palace,BTC
05-11-2017 - Researched @ DENR w/Engr. Bodiongan
05-12-2017 Conducted stractural survey for the road widening at Capitol Bonbon
- road Butuan City
05-15-2017 ABSENT

Submitted by:

Signature of Employee

Checked by:

ELSA A. CRUZ
Officer In-charge Planning & Programming Division

NOTED:

ROGELIO L. BATOCAEL
OIC City Engineer

CITY ENGINEERING OFFICE


Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: May 16-31, 2017

DATE DAILY ACTIVITY


05-22-2017 - Encoding survey data
05-23-2017 - Conducted structural survey @ Grand Palace Hotel,Brgy.Imadejas BC.
05-24-2017 - Con't. Conducted structural survey @ Grand Palace Hotel,Barangay
Imadejas,Butuan City.
05-25-2017 - Encoding survey data
05-26-2017 Encoding survey data
05-29-2017 - Conducted survey @ Brgy. Imadejas for concreting,Imadejas BC.
05-30-2017 Encoding survey data
05-31-2017 - Conducted survey profile @M.J.
-
-

-
Submitted by:

Signature of Employee

Checked by:

ELSA A. CRUZ
Officer In-charge Planning & Programming Division

NOTED:

ROGELIO L. BATOCAEL
OIC City Engineer
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : MARGARITO R. BONGABONG, JR.


POSITION : ENGINEERING ASSISTANT/INSTRUMENT MAN
PERIOD COVERED: July 1-31, 2017

DATE DAILY ACTIVITY


07-06-2017 - Traverse and Profile of the prop. Spring dev't.@Los Angeles,BTC.
07-07-2017 - Traverse and profile of the prop. Road concreting from Sitio Sta.Cruz
to Sitio Mabuhay,Mla. De Bugabus,Butuan City.
07-10-2017 - Con't. traverse and profile of the prop. Road concreting from Sitio Sta.
Cruz to Sitio Mabuhay,Mla. De Bugabus,Butuan City.
07-11-2017 - Con't. traverse and profile of the prop. Road concreting from Sitio Sta.
Cruz to Sitio Mabuhay,Mla. De Bugabus,Butuan City.
07-12-2017 - Traverse and Profile of the prop. Spring dev't.@Los Angeles,BTC.
07-13-2017 - Traverse and Profile of the prop. Spring dev't.@Brgy.Dulag,BTC.
07-14-2017 - Traverse and Profile of the prop. Spring dev't.@Brgy.Dulag,BTC.
07-17-2017 - Traverse and Profile of the prop. Spring dev't.@Los Angeles,BTC.
07-19-2017 Encoding survey data
07-20-2017 - Con't. traverse and profile of the prop. Road concreting from Sitio Sta.
Cruz to Sitio Mabuhay,Mla. De Bugabus,Butuan City.
07-21-2017 - Con't. traverse and profile of the prop. Road concreting from Sitio Sta.
Cruz to Sitio Mabuhay,Mla. De Bugabus,Butuan City.
07-24-2017 - Encoding survey data
07-25-2017 Structural survey for the proposed black tiedas at langihan Van
terminal,Butuan City.
07-26-2017 Encoding survey data
07-27-2017 Relocation survey of prop.Brgy.site subd.@Brgy.Salvacion,Btc.
07-28-2017 Con't. traverse and profile of the prop. Road concreting from Sitio Sta.
Cruz to Sitio Mabuhay,Mla. De Bugabus,Butuan City.
07-31-2017 Con't. traverse and profile of the prop. Road concreting from Sitio Sta.
Cruz to Sitio Mabuhay,Mla. De Bugabus,Butuan City.

Submitted by:

Signature of Employee

Checked by:

ELSA A. CRUZ
Officer In-charge Planning & Programming Division

NOTED:

ROGELIO L. BATOCAEL
OIC City Engineer

CITY ENGINEERING OFFICE


Butuan City

ACCOMPLISHMENT REPORT

NAME : JOE FEL B. SANCO


POSITION : GEODETIC ENGINEER
PERIOD COVERED: SEPTEMBER 1-15, 2017

DATE ACTIVITY
9-13-2017 - Road survey for concreting @ Purok 1, Brgy. Bonbon, BTC.
08-03-2017 - Trav. and profile of the prop. Road concreting @ Brgy Buhangin,BTC.
Submitted by:

Signature of Employee

Checked by:

ELSA A. CRUZ
Officer In-charge Planning & Programming Division

NOTED:

ROGELIO L. BATOCAEL
OIC City Engineer
PORT

TOTAL NO REMARKS
1 Accomplished
1 Accomplished

1 Accomplished

1 Partial Survey

1 Accomplished
1 Accomplished
1 Accomplished

1 Accomplished

1 Accomplished

1 Accomplished

Signature of Employee
PORT

TOTAL NO REMARKS
1 Accomplished
1 Accomplished

1 Accomplished

1 Partial Survey

1 Accomplished
1 Accomplished
1 Accomplished

1 Accomplished

1 Accomplished

1 Accomplished

Signature of Employee
PORT

TOTAL NO REMARKS
1 Accomplished
1 Accomplished

1 Accomplished

1 Partial Survey

1 Accomplished
1 Accomplished
1 Accomplished

1 Accomplished

1 Accomplished

1 Accomplished

Signature of Employee
PORT

TOTAL NO REMARKS

1 Accomplished

1 Partial Survey

1 Accomplished

1 Partial Survey

1 Accomplished

1 Partial Survey

1 Accomplished

Signature of Employee
PORT

TOTAL NO REMARKS

1 Accomplished
1 Accomplished

1 Partial Survey

1 Accomplished
1 Accomplished

1 Partial Survey

1 Accomplished

1 Accomplished

1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished

1 Partial Survey

1 Partial Survey

1 Accomplished

1 Accomplished

1 Accomplished

Signature of Employee

LORDEN G. VISMANOS
City Engineer
PORT

TOTAL NO REMARKS

1 Accomplished
1 Accomplished

1 Partial Survey

1 Accomplished
1 Accomplished

1 Partial Survey

1 Accomplished

1 Accomplished

1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished

1 Partial Survey

1 Partial Survey

1 Accomplished

1 Accomplished

1 Accomplished

Signature of Employee
LORDEN G. VISMANOS
City Engineer
PORT

TOTAL NO REMARKS

1 Accomplished

1 Accomplished
1 Partial Survey
1 Accomplished
1 Partial Survey

1 Accomplished
1 Accomplished

1 Accomplished

1 Accomplished

1 Accomplished

1 Accomplished

Signature of Employee
LORDEN G. VISMANOS
City Engineer
PORT

TOTAL NO REMARKS

1 Accomplished
1 Accomplished
1 Partial Survey

1 Partial Survey
1 Accomplished
Accomplished

Partial Survey
1
Partial Survey

Partial Survey

Accomplished

Accomplished

Signature of Employee
LORDEN G. VISMANOS
City Engineer

PORT

TOTAL NO REMARKS

1 Accomplished
1 Accomplished
1 Partial Survey

1 Partial Survey
1 Accomplished
Accomplished

Partial Survey
1
Partial Survey

Partial Survey

Accomplished

Accomplished
Signature of Employee

LORDEN G. VISMANOS
City Engineer
PORT

TOTAL NO REMARKS
1 Accomplished
1 Accomplished

1 Accomplished

1 Accomplished

1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished
1 Accomplished

Signature of Employee
PORT

TOTAL NO REMARKS
1 Accomplished
1 Accomplished
1 Accomplished

1 Accomplished
1 Accomplished
1 Partial
1 Accomplished
Signature of Employee
PORT

TOTAL NO REMARKS
1 Accomplished

1 Partial

1 Partial

1 Partial

1 Accomplished

1 Accomplished

1 Accomplished

1 Accomplished

1 Partial

Signature of Employee
PORT

TOTAL NO REMARKS
1 Accomplished

1 Partial

1 Partial

1 Partial

1 Accomplished

1 Accomplished

1 Accomplished

1 Accomplished

1 Partial
Signature of Employee
PORT

TOTAL NO REMARKS
1 Partial

1 Partial

1 Partial

1 Partial
1 Partial
1 Partial
1 Accomplished
1 Accomplished
1 Accomplished
Accomplished
1 Partial

Partial
1 Accomplished

Accomplished
Accomplished
Partial

Partial

Accomplished

Signature of Employee
PORT

TOTAL NO REMARKS
1 Accomplished
1 accomplished
Signature of Employee
CITY ENGINEERING OFFICE
Butuan City

ACCOMPLISHMENT REPORT

NAME : JOE FEL B. SANCO


POSITION : GEODETIC ENGINEER
PERIOD COVERED : MARCH 16-31, 2019

DATE DAILY ACTIVITY REMARKS


3/18/2019 - parcellary survey @ BCSAT, Taguibo on going
- survey/inspection city piggery on going
3/19/2019 - survey/inspection of road right of way @ Brgy. Doongan accomplished
- plot survey data accomplished
3/20/2019 - plot data of Tandang Sora Brgy Hall. accomplished
- attend committee hearing accomplished
3/21/2019 - cont. parcellary survey at BCSAT, Taguibo accomplished
- parcellary survey at City Piggery accomplished
3/22/2019 - parcellary survey at Brgy. Ambago accomplished
process survey data from ambago parcellary survey accomplished
3/25/2019 - research data for City Legal on going
- process survey data accomplished
3/26/2019 - prepare sketch plan for Bilay National High School accomplished
- attend consultative meeting accomplished
3/28/2019 - survey for drainage canal @ Brgy. Ambago on going
3/29/2019 - conduct survey at Obrero Elementary School w/in 1 km radius on going
- prepare sketch plan accomplished

Submitted by:

Signature of Employee

Checked by:

ENGR. ANTONIO L.CALO JR


Officer In-charge Planning & Programming Division

NOTED:

ROGELIO L. BATOCAEL
OIC City Engineer
DAILY ACTIVITIES
Date WORK
19-Sep-17 road survey at Aruville Subd. Libertad
Road survey at Purok 4, Brgy. Bonbon
plot survey data from aruville subd. Libertad
plot survey data from brgy. Bonbon (survey not finish)
25-Sep-17 Assist NHA regarding the subdivision scheme of Brgy. Pagatpatan
survey and inspection of road right of way at P-3, Imadejas
Make report regarding on the site inspection at P-3, Imadejas
26-Sep-17 survey at Brgy. Pagatpatan, Butuan City (Lot Bdry check)
27-Sep-17 Process survey data from Brgy. Pagatpatan

survey/inspecton of Road right of way at Purok 6, Villa Kananga, Butuan City


28-Sep-17 Continue road survey at P-4, Bonbon, Butuan City
Multicab operational
road survey at Grand Palace Hotel Area
29-Sep-17 Road Survey at Caramville heights, San Vicente
Oct. 2, 2017 Process survey data from Brgy. Bonbon
Road Survey at Purok 3 Holy Redeemer
conduct survey/ inspection of road right of way of St. Peter Chapel
Oct. 3, 2017 joint survey with Camella homes Surveyor at Ampayon
Survey/ inspection at R. Calo St. for Road Right of way
Oct. 4, 2017 road survey at Brgy. Dulag
section at Silad, mahogany near school for drainage purposes.
Oct. 5, 2017 Process survey at Silad Mahogany
Process survey at Brgy. Dulag road concreting
Oct. 6, 2017 survey/ inspection of foot bridge at Ampayon
Oct. 9, 2017 Survey for proposed drainage system along elloso st. at Brgy. Imadejas
Oct. 10, 2017 Survey for proposed drainage system along elloso st. at Brgy. Imadejas
Survey for proposed drainage system along molave st. at JP. Rizal
Oct. 11, 2017 process data from JP. Rizal
survey/inspecton of Road right of way at Purok 5, Ambago, Butuan City
Oct. 12, 2017 survey/inspecton of Road right of way at Baan Km3, Butuan City
survey for drainage system at casa rivera, Libertad, Bxu
Oct. 13, 2017 research data for brgy. JP Rizal
survey for drainage system at Josiphine homes, Libertad, Bxu
Oct. 18, 2017 survey/ inspection of Brgy property at JP. Rizal
Survey of drainage at Salas Village road, Libertad
Oct. 19, 2017 research data for brgy.pagatpatan subd. Through city housing
Oct. 20, 2017 survey/inspection for proposed foot bridge at Brgy. Basag
process survey data of brgy. Bonbon
Oct. 23, 2017 survey for drainage system from employees village to RAM subd.
Plot survey data for P-3 Holy Redeemer
Oct. 24, 2017 Lucky village road concreting
Oct. 25, 2017 continue road survey at Lucky Village
Plot survey data for P-3 Holy Redeemer
Oct. 27, 2017 continue road survey at Lucky Village

Nov. 3, 2017 plot holy redeemer road concreting


plot p-4 to DSWD brgy. Bonbon
plot employees village to ram subd.
Nov. 6, 2017 plot survey data from Lucky Village, Ambago
Nov. 7, 2017 cont. plot survey data from Lucky Village, Ambago
PLOT CASA RIVERA LIBERTAD
plot employees village to ram subd.
Nov.8, 2017 cont. plot employees village to ram subd.
Nov. 9, 2017 survey for drainage at Brgy Dagohoy along Nangka Road
Nov. 10, 2017 Survey for drainage at Brgy JP Rizal along 1st guingona st.
Nov. 13, 2017 Plot Survey data from Brgy. Dagohoy Along Nangka road
Nov. 14, 2017 Survey for drainage at Brgy JP Rizal along 1st guingona st.
Nov.15, 207 survey for drainage at Brgy. JP Rizal along J. Abad Santos st.
survey/inspection at Imadejas owned by Diosdado Orillanida
REMARKS MANPOWER
W/ CA DURANO/JAMES/VARGAS
W/ CA DURANO/JAMES

Lydia Labajo/Dulfe Labajo DURANO/JAMES/VARGAS

w/city housing survey team james/vargas

Retchell Sumampong- lot owner james


for process james/vargas/nilo

process by loloy james/vargas/nilo


for process james/vargas/nilo

w/ca - finish survey james/vargas


james/vargas/nilo/Engr.B
w/ Engr Edward Torralba james/vargas/nilo/Engr.B
no claimant on site james/vargas/nilo
Vargas/Kuray
Vargas/Kuray

w/ engr Cruz james/vargas


survey not finish james/vargas/nilo/Engr.B

no CA james/nilo
with CA james/nilo/vargas

with CA

with CA
with CA engr. B/Jed/nilo
on going
with CA vargas/jed
accomplished
accomplished
on going 21600
on going
accomplished
on going - C/O ERWIN
on going
accomplished
accomplished
on going
on going sanky halfday
accomplished
on going
accomplished

You might also like