1) Methodology
The Project, which is providing the U SATA Hard Drive SSD Interface for Laptops, has many
constraints or Risks in its R&D. I have identified each and every aspect of risk and interruption,
which I feel will be main cause for the delay or halt of the project. A brief description about the
risks has been provided with a qualitative and quantitative analysis. Failure response matrix has
been demonstrated to solve the threats and to focus on the aim constraints of the project.
1
b. The Raid of the lens on the disk would not calibrate- It is very important for the lens
to calibrate with the disk as, the lens is developed by an external source. If the lens does
not calibrate, the entire Hard Drive development will slow down.
c. SSD Interface should fit the required design – After the development of an U SATA
Hard Drive, SSD interface should match the required standards and compatibility, or the
process have to be started again, which will delay the final outcome.
d. Issues Between the supplier and the R&D would rise- If the supplier will not supply
the exact required chips or micro products, R&D will be falling back by time and issues
and comments will arise on the supplier, which can lead to the supplier pulling back from
the project.
e. Modification after the initial design- As Dell will be sponsoring this project, there can
be some modifications required by Dell, due to the competitors allegations or
competitions in the U SATA industry.
3) Quality Analysis
a. (1a) Marginal errors during the initial R&D- As this is an initial problem, this will
not effect the entire project development as, and this can be rectified with immediate
effect.
b. (2b) The Raid of the lens on the disk would not calibrate- The RPN for this risk
very high as, the entire project depends on the calibration part and this will also lead
to time wastage as it is time consuming, if the problem repeats.
c. (3c) SSD Interface should fit the required design – The RPN for this risk can be
tolerant as the risk is expected if, the initial design has a few minor design issues or
errors.
d. (4d) Issues Between the supplier and the R&D would rise- The RPN level for this
risk is highly as, these issues do arise during a project and as this project is totally
based on R&D, it would certainly be a major problem, if occurred.
e. (5e) Modification after the initial design- The RPN for this issue is also high as, the
modifications and new implementations are normally expected in technological
developments.
2
4) Work Break Down Structure by Phase
Time: 9 months
Note: The ref no: 1a, 2b, 3c, 4d, 5e, represent the Risk and the stage of its occurrence. This has
been used in the flow chart below.
3
1a Paper Attention to 5 1 6 30 Rectify the issue and fix the
Work Details problem
Note :
a) The above RPN has been scaled on the scale of 1 to 10.
b) Ref 5e is a positive aspect of risk, as any modifications or upgrades are beneficial for
the project.
4
1a Initial Design Rectify the issue and fix the Alternative Immediate Design In charge
problem design
2b Raid of Lens Have a backup calibration Stock Variety of Analyze and Technical Team
equipment Lenses in Calibrate
Advance
3c SSD Rectify the issue and fix the Plan for the Immediate Technical Team
Installation problem Change
Note:
All the above Contingency Plan Mentioned above are precautionary measures. The plans may
differ according to the Risks observed during the Project Development.