Professional Documents
Culture Documents
COLOR TV
SERVICE MANUAL
CHASSIS : MC059D
MODEL : 14FU7RB
MODEL : 14FU7RB-T2
CAUTION
BEFORE SERVICING THE CHASSIS,
READ THE SAFETY PRECAUTIONS IN THIS MANUAL.
Feb., 2010
P/NO : MFL40183504 Printed in China
CONTENTS ............................................................................................... 2
SAFETY PRECAUTIONS...........................................................................3
SPECIFICATIONS ......................................................................................4
ADJUSTMENT ...........................................................................................6
TROUBLE SHOOTING.............................................................................11
Copyright©2010 LG Electronics.Inc. All right reserved. -2- LGE Internal Use Only
Only for training and service purposes.
An isolation Transformer should always be used during the always perform an AC leakage current check on the exposed
servicing of a receiver whose chassis is not isolated from the AC metallic parts of the cabinet, such as antennas, terminals, etc., to
power line. Use a transformer of adequate power rating as this be sure the set is safe to operate without damage of electrical
protects the technician from accidents resulting in personal injury shock.
from electrical shocks.
Leakage Current Cold Check(Antenna Cold Check)
It will also protect the receiver and it's components from being With the instrument AC plug removed from AC source, connect an
damaged by accidental shorts of the circuitry that may be electrical jumper across the two AC plug prongs. Place the AC
inadvertently introduced during the service operation. switch in the on position, connect one lead of ohm-meter to the AC
plug prongs tied together and touch other ohm-meter lead in turn to
If any fuse (or Fusible Resistor) in this TV receiver is blown, each exposed metallic parts such as antenna terminals, phone
replace it with the specified. jacks, etc.
If the exposed metallic part has a return path to the chassis, the
When replacing a high wattage resistor (Oxide Metal Film Resistor, measured resistance should be between 1MΩ and 5.2MΩ.
over 1W), keep the resistor 10mm away from PCB. When the exposed metal has no return path to the chassis the
reading must be infinite.
Keep wires away from high voltage or high temperature parts. An other abnormality exists that must be corrected before the
receiver is returned to the customer.
Due to high vacuum and large surface area of picture tube,
extreme care should be used in handling the Picture Tube. Do Leakage Current Hot Check (See below Figure)
not lift the Picture tube by it's Neck. Plug the AC cord directly into the AC outlet.
Do not use a line Isolation Transformer during this check.
X-RAY Radiation Connect 1.5K/10watt resistor in parallel with a 0.15uF capacitor
between a known good earth ground (Water Pipe, Conduit, etc.)
Warning: and the exposed metallic parts.
Measure the AC voltage across the resistor using AC voltmeter
The source of X-RAY RADIATION in this TV receiver is the High with 1000 ohms/volt or more sensitivity.
Voltage Section and the Picture Tube. Reverse plug the AC cord into the AC outlet and repeat AC voltage
For continued X-RAY RADIATION protection, the replacement measurements for each exposed metallic part. Any voltage
tube must be the same type tube as specified in the measured must not exceed 0.75 volt RMS which is corresponds to
Replacement Parts List. 0.5mA.
In case any measurement is out of the limits specified, there is
possibility of shock hazard and the set must be checked and
repaired before it is returned to the customer.
To determine the presence of high voltage, use an accurate high
impedance HV meter. Leakage Current Hot Check circuit
1.5 Kohm/10W
Copyright©2010 LG Electronics.Inc. All right reserved. -3- LGE Internal Use Only
Only for training and service purposes.
General specification
Copyright©2010 LG Electronics.Inc. All right reserved. -4- LGE Internal Use Only
Only for training and service purposes.
Input TV/AV
Copyright©2010 LG Electronics.Inc. All right reserved. -5- LGE Internal Use Only
Only for training and service purposes.
G R B R
3-3. Adjustment
1) Select the VP 0(RF AGC) adjustment mode by pressing <Fig. 2>
IN-START key on the SVC remote control.
2) Press VOL +/- (F, G) key until the muti-meter shows 5-2. Convergency Adjustment
reading as below:
3) CAUTION: (1) Necessary Instrument
Since the signal strength can be easily changed by the 1) Degaussing Coil
condition of signal cable, you need to check the signal 2) Convergency fixing instrument (special tools)
strength frequently in order to prevent error.
(2) Adjustment Preparation
Tuner P/N Maker AGC Vol. Signal Tuner Spec. Remark 1) Heat run over 30 minutes before adjustment.
6700MF0014A LG Innote 2.3±0.05V 65dBu TAEW-G013D PAL 2) Demagnetize the CPT and Cabinet by using degaussing
coil.
6700PF0006B SANYO 2.3±0.05V 65dBu 115-B-A86EL PAL
3) Receive Cross Hatch Pattern for Convergence (09CH).
6700MF0018B LG Innote 2.3±0.05V 65dBu TAEA-G001D PAL 4) Let the contrast in normal luminance level.
Copyright©2010 LG Electronics.Inc. All right reserved. -6- LGE Internal Use Only
Only for training and service purposes.
DYC ADJ.
Copyright©2010 LG Electronics.Inc. All right reserved. -7- LGE Internal Use Only
Only for training and service purposes.
Copyright©2010 LG Electronics.Inc. All right reserved. -8- LGE Internal Use Only
Only for training and service purposes.
Copyright©2010 LG Electronics.Inc. All right reserved. -9- LGE Internal Use Only
Only for training and service purposes.
1. TV FUNCTIONAL
2. TU / IF SECTION
3. VIDEO PROCESSING
7. HORIZONTAL SECTION
MAIN
400
943
OPTION
913
170 150 153
174
112
520
300 105
120
320
330
310