MAINTENANCE PRESCRIPTION

ANALYSIS INTEGRATED WITH ACCURACY AND MEANING

PLANT: COCA-COLA FEMSA - PHILIPPINES - MEYCAUAYAN REFERENCE 12/18 DR 00000165


EQUIPMENT INSTALLATION LOCATION

AUXILLARY -> CAUSTIC SYSTEM -> CAUSTIC TANK -> PUMP -> LEFT
TECHNIQUE: DR: OPERATION: OPERATION DRIVEN LOAD

Technical Data
VIBRATION 0165 Manufacturer Manufacturer
SURVEY

Equipment
OIL LUB./HIDR. Model Model
MCA Housing Serial Num
ULTRA SOUND Power
THERMOGRAPHY Rotation (RPM)
CURRENT EQUIPMENT IMAGE / DEFECT FOUND
EQUIPMENT MAINTENANCE HISTORY:
NO INFORMATION
NOTES & HISTORY

SPECIALIST - SEMEQ ( ) MECANIC ( )LUBRICATOR ( ) ELETRICIAN ( ) OPERATOR


TEMPERATURE (°F) ( ) SUPERVISOR ( ) COORDINATOR ( ) OTHER
MTBF

THE VIBRATION SIGNAL INDICATES PUMP PASS FREQUENCY. CHECK THE FLOW AND PRESSURE
CONDITIONS OF THE PUMP.

HIGHEST COST OF MAINTENANCE: DOWN TIME: OUTROS ITENS AFETADOS: ACTION:


SPARE PARTS PRODUCTION QUALITY ENVIRONMENT
FAILURE RISK
SERVICES LINE SAFETY ENERGY CONSUMPTION CORRECTIVE
LABOR EQUIPAMENT WASTE PRODUCTION REDUCTION PROACTIVE
PRECISION ACTION(S) DEADLINE
Inspect the impeller and shaft of the pump for any IMMEDIATE
Make sure that the impeller rotates freely and the
PRIMARY worn out part. Furthermore, inspect if rotation is free IMPERATIVE TO EXECUTE:
clearance between the shafting with the impeller bore
ACTION and no wear on the pump casing. Also, inspect the DAYS
is within standard as well as the clearance between the
impeller for any broken vanes. impeller and pump housing is also within standard. IMPERATIVE TO EXECUTE:
WEEKS
PRECISION ACTION(S) DEADLINE
IMMEDIATE
SECONDARY IMPERATIVE TO EXECUTE:
ACTION DAYS
IMPERATIVE TO EXECUTE:
WEEKS
PREPARED BY: Romeo Victor Anabo COLLABORATED