Project Features and Target
Project Corridor South – North Corridor East – West
Features 23.3 Km (Lebak Bulus – Kampung 87 Km (Balaraja – Cikarang)
Bandan)
Operation Target End 2016 End 2018 2024 - 2027 2024 - 2027 2024 - 2027
MRT JAKARTA & OTHER RAILS
Tanjung
Priok
FUTURE NETWORK
Kampung
Bandan
• Line 1 (15.2 km)
Beos 5
• Line 2 (8.1 km)
TO Tangerang
Duri
• Line 4 East‐West (87 Km)
2 4
Total 110.3 Km
FS trace East‐West MRT has been started since 2009
Tanah
3
Abang
Dukuh TO Bekasi
Other Potential Line:
Atas
Lebak
Bulus
MRT JAKARTA DEVELOPMENT OBJECTIVES
OBJECTIVES: EXPECTED IMPACT / OUTCOME:
Mitigate severe traffic congestion Capacity increase: 300,000+passengers daily
(current number of Trans Jakarta daily
Stimulate and accelerate Jakarta’s passengers from BlokM to Kota is 70,000)
economic growth by introducing an Travel time reduction: Travel time from Lebak
efficient transportation system Bulus to Dukuh Atas will be reduced to 28
Improve urban environment by minutes
reducing negative environmental Employment creation: 48,000 new jobs created
over five‐year project life
impact of public transportation
Environmental impact: CO2 emissions estimated
Symbolize Indonesia’s economic to be reduced by 30,000 tons in 2020
development by establishing the Further intangible impact: Reducedtraffic
nation’s first modern urban railway accidents, increased social/economic
system development
Source :
SPECIAL ASSISTANCE FOR PROJECT FORMATION(SAPROF) for Jakarta Mass Rapid Transit (MRT) System
(November 2005)
ARCHITECTURAL
Design of Station Entrance (Underground Station)
FLOOD PROTECTION COUNTERMEASURES (Permanent)
MOUND UP ENTRANCE FLOOD PROTECTION DOOR
ARCHITECTURAL
Design of Station Entrance (Underground Station)
Station Supervisor’s
Office
ARCHITECTURAL
Image of Underground Station
Dukuh Atas