CONTRACTOR:
STROYTRANSGAZ
PROJECT:
North Middle Area Gas Exploitation Project,
Syria
CONTRACT: Document type: Procedure
67/2007
Document ID code: Revision: Other denotations:
NMAGEP-IX-PRO-022 01
File name:
Document name:
Steel Structure Fabrication and Erection
Customer’s document No.:
Page: 1of 7
North Middle Area Gas 16.06.08
Exploitation Project Rev.: 01
NMAGEP-IX-PRO-022 Page.: 2/7
CONTENTS
1. Purpose....................................................................................................................................3
2. Scope........................................................................................................................................3
3. References................................................................................................................................3
4. Definitions................................................................................................................................3
5. Procedures...............................................................................................................................4
5.1 General.........................................................................................................................4
5.2 Personnel......................................................................................................................4
5.3 Safety............................................................................................................................4
5.4 Materials......................................................................................................................5
5.5 Fabrication..................................................................................................................5
5.6 Pre-assembly...............................................................................................................5
5.7 Erection........................................................................................................................5
5.8 Bolting..........................................................................................................................6
5.9 Non Destructive Examination and Inspection ……................................................7
5.10 Painting........................................................................................................................................7
6. Attachments.................................................................................................................................7
North Middle Area Gas 16.06.08
Exploitation Project Rev.: 01
NMAGEP-IX-PRO-022 Page.: 3/7
1. PURPOSE
1.1 The purpose of this procedure is to provide minimum requirements for fabrication and
erection of structural steelwork.
2. SCOPE
3. REFERENCES.
4. DEFINITIONS
5. PROCEDURE
5.1 General
0 Fabrication and erection of all steel structures shall be done in accordance
with AFPC Schedule Z, AISC and approved project drawings.
5.2 Personnel
ㄷ All personnel employed in structural steelwork fabrication or erection shall
have enough experience in their applicable position.
ㅅ All welders employed by the Contractor for shop or field welding on this
work shall be required to show written evidence that they have satisfactoryly
passed a performance qualification test using a qualified welding procedure
within the last ninety days.
5.3 Safety
ㅇ Safety rules and regulations shall be adhered to at all times. Structural
steelwork personnel shall ensure that work area facilities are safe prior to
commencing work activities.
ㅈ For all work at a level higher than 2 meters above ground level proper
scaffolding shall be erected. Access to all scaffolding shall be by ladders.
ㅋ Ladders shall be made from wood or aluminum, Ladders shall not be longer
than 5 meters and shall project above the top landing platform by 1 meter.
ㅌ The personnel, carrying out any work at over 6 m hight, shall insure double
harness are used.
5.4 Materials
ㅍ All materials shall be in accordance with approved project drawings and shall
conform to ASTM approved in AISC Specifications. ASTM A-36 are
normally specified.
5.5 Fabrication
ㄴ Fabrication of structural steel shall confirm to A.W.S-D.1.1 sections 3 and 4,
AFPC Schedule Z and approved project drawings.
5.6 Pre-assembly
ㄹ Prior to erection, large structural items shall be pre-assembled to verify
dimensional accuracy and component quantities.
5.7 Erection
Steel structure installation shall be done in accordance with AISC manual of
steel construction and shall include the setting of all columns, beams, trusses,
grating, handrails, etc. and all the erection of all other steel to true line, grade,
and plumpness.
Prior to hoisting each erection member it is necessary to check the following :
- its complance with the design model ;
- condition of embedded fittings and setting marks ;check each member for
the absence of dirt, damage to the finish coat, priming coat and paint ;
North Middle Area Gas 16.06.08
Exploitation Project Rev.: 01
NMAGEP-IX-PRO-022 Page.: 6/7
- the required connecting parts and auxiliary materials for availability in the
working place ;
-hoisting gears for proper and reliable fastening;
When installing the erection members, it is necessary to provide :
- balance and stability of their position at all the stages of erection ;
- safe operation ;
- their adequate position through the continuous geodetic inspection ;
- strength of the construction joints.
The structures should be mounted to the design position according to the
approved reference points (marks, dowels, stops, edges, etc. ).
The structures with special embedded fittings or other fixing appliances
should be erected with respect to these fittings.
ㅁ Structural steel may be erected in individual pieces or in pre-assembled
sections. The methods of handling, lifting and fixing shall be appropriate so
as to avoid any damage to steelwork.
5.8 Bolting
ㅋ Bolt holes shall be drilled or punched.
ㅌ The friction surfaces of high strength friction grip joints shall not be painted.
H.S.F.G. bolts shall be tightened using air operated or manual torque
wrenches, set to the torque value detailed on approved project drawings.
North Middle Area Gas 16.06.08
Exploitation Project Rev.: 01
NMAGEP-IX-PRO-022 Page.: 7/7
ㅍ Threads on H.S.F.G. bolts shall protrude not less than 3 mm after final
tightening. Bolts at the center of a joint are to be tightened first, progressively
moving outward in a staggered pattern.
ㅁ Material inspections
ㅂ Dimensional inspections
5.10 Painting
6. ATTACHMENTS
6.1 Steel Structure Fabrication Check List STG-MEC-002
6.2. Steel Structure Installation Check List STG-MEC-003