You are on page 1of 3

ESTIMATION OF MATERIAL AND ITS COSTS

BEAMS
COMPRESSION TENSILE FLEXURE
3 3 3
3 3 3
3 3 3
3 3 3
3 3 3
3 3 3
18 18 18
TOTAL BEAMS = 18 +18+18 =54
NO. OF BEAMS PER 7 & 28 DAYS = 54+ 54 =108

CYLINDERS
%age OF COMPRESSION TENSILE FLEXURAL
REPLACEMENT
0 5 5 5
5 5 5 5
10 5 5 5
15 5 5 5
20 5 5 5
25 5 5 5
TOTAL 30 30 30
TOTAL BEAMS = 30+30+30= 90
NO. OF CYLINDERS PER 7 & 28 DAYS = 90+90= 180

CALCULATIONS
CYLINDER DIAMETER =6”
CYLINDER HEIGHT = 12”
AREA = 37.68in2 VOLUME = 452.16 in3
BEAM DIMENSIONS ( 100*100*500) mm3
VOLUME = 305.1175 mm3

TOTAL VOLUME = 108(305.1175) + 180(452.16)= 114,341 cubic inch

VOLUME IN CUBIC FEET = 66.169 cubic feet

CONCRETE MIX DESIGN

RATIO 1:2:4

CEMENT = 66.169/7 = 9.45 cubic feet

SAND = 2(66.169)/7= 18.90 cubic feet

AGGREGATE= 4(66.169)/7=37.81 cubic feet

QUANTITY

NO. OF BAGS OF CEMENT = 9.45/1.23=7.68 BAGS approx. 8 BAGS

NO. OF CARTS OF SAND = 1 CART

NO. OF BOXES OF AGGREGATE = 37.81/0.77025=49.08 BOXES approx. 50 BOXES.

TOTAL RICE HUSK ASH = 75 *4 = 300 Kg (ash = 25% of husk by wt.)

COSTS

8 BAGS OF CEMENT = 8*600 = 4800 Rs

1 CART OF SAND = 500 Rs

50 BOXES OF AGGREGATE = 50*40 = 3000Rs

COST OF ASH =
TOTAL = 7300 Rs