Slab Calculation: Structural Model: Type Slab Thickness Material
Slab Calculation: Structural Model: Type Slab Thickness Material
Structural Model :
lx
2
fy = 2400 kg/cm2
2
2 Mlx = Mtx 0.001 q lx2 * 51
2
Mly = Mty 0.001 q lx2 * 51
ly
Loading : a. Dead Load - Selfweight of Slab = 240 kg/m2
- Tile , t 3 cm = 72 kg/m2
- Mortar, t 2 cm = 42 kg/m2 2
- Ceiling, ( Asbes Cement + hanger ) = 18 kg/m2 2
- M&E = 0 kg/m2 2+
2
q dl = 372 kg/m2
2
b. Live Load q ll = 250 kg/m2
2
c. Ultimate Load qu = 1.2 q dl + 1.6 q ll = 846.4 kg/m2
2 2
Moment : 2
2 2
Mlx = - Mtx = 1079.16 kg m
Mly = - Mty = 1079.16 kg m
a. Rebar Required :
a.1 ( x - dirrection )
c. Re-bar Selection
D = 12 mm ; Ab = 1.13 cm2
SKETCH :
50
100
50
12 @ 50 mm
d. Crack Control
Chose "1" or "2" : 2 INTERIOR EXPOSURE
1 EXTERIOR EXPOSURE
2 INTERIOR EXPOSURE
s = 50 mm ; b = 1.35 for Slab
bw = 1000 mm
dc = 44 mm
A = 2 * s* dc = 4400 mm2
fs = 0.6 * fy = 144 MPa
z = fs * ( dc * A)1/3 = 8330 N/mm
= 8.33 MN/m < 30 MN/m OK !!
w = 11*b *fs* (dc*A)1/3 = 0.124 mm < 0.4 mm OK !!
100000
Ly/Lx 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5
Mlx = Mtx 51 57 63 68 72 75 78 80 81 82 82 82 83 83 83 83
Mly = Mty 51 53 54 55 55 55 54 54 54 54 53 53 53 52 52 51
SLAB CALCULATION W/ BONDEX :
Structural Model :
x
l
fy = 2 2
5000 kg/cm
2
2 Mlx = Mtx 0.001 q lx2 *
2
Mly = Mty 0.001 q lx2 *
ly
Loading : a. Dead Load - Selfweight of Slab = 240 kg/m2
- Tile , t 0 cm = 0 kg/m2
- Mortar, t 3 cm = 63 kg/m2 2
- Ceiling, ( Asbes Cement + hanger = 18 kg/m2 2
- M&E = 0 kg/m2 2+
2
q dl = 321 kg/m2
2 2
b. Live Load q ll = 100 kg/m
c. Ultimate Load qu = 1.2 q dl + 1.6 q ll = 545.2 kg/m2 2
2
Moment : 2
2
Mlx = - Mtx = 794.902 kg m
Mly = - Mty = 607.217 kg m
a. Rebar Required :
a.1 ( x - dirrection )
m = fy = 17.7179 ; Rn = Mu = 47 kg/cm22 d= 46
0.85 fc' ø b d2 2 b= 1000
2
r req = 1 1 - 1 - 2 m Rn = 0.0103 > r min
m fy
c. Re-bar Selection
D = 8 mm ; Ab = 0.50 cm2
SKETCH :
50
100
50
8 @ 100 mm
d. Crack Control
Chose "1" or "2" : 2 INTERIOR EXPOSURE
1 EXTERIOR EXPOSURE
2 INTERIOR EXPOSURE
s = 150 mm ; b = 1.35 for Slab
bw = 1000 mm
dc = 29 mm
A = 2 * s* dc = 8700 mm2
fs = 0.6 * fy = 300 MPa
z = fs * ( dc * A)1/3 = 18957 N/mm
= 18.96 MN/m < 30 MN/m OK !!
w = 11*b *fs* (dc*A) 1/3
= 0.282 mm < 0.4 mm OK !!
100000
< 2.5 ( two way slab )
2
2
mm ; ø = 0.8
mm
cm2
mm ; ø = 0.8
mm
cm2
1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5
72 75 78 80 81 82 82 82 83 83 83 83
55 55 54 54 54 54 53 53 53 52 52 51
SLAB CALCULATION
Structural Model :
lx
fy = 2 2
4600 kg/cm
2
2 Mlx = Mtx 0.001 q lx2 * 75
2
Mly = Mty 0.001 q lx2 * 55
ly
Loading : a. Dead Load - Selfweight of Slab = 360 kg/m2
- Tile , t- 2 cm = 48 kg/m2
- Mortar, t - 3 cm = 63 kg/m2 2
- Ceiling, ( Asbes Cement + hanger ) = 18 kg/m2 2
- M&E = 0 kg/m2 2+ +
2
q dl = 489 kg/m2
b. Live Load q ll = 800 kg/m2 2
c. Ultimate Load qu = 1.2 q dl + 1.6 q ll = 1866.8 kg/m2 2
2 2
Moment : 2 2
Mlx = - Mtx = 2240.16 kg m
Mly = - Mty = 1642.78 kg m
a. Rebar Required :
a.1 ( x - dirrection )
c. Re-bar Selection
D = 10 mm ; Ab = 0.79 cm2
SKETCH :
150
10 @ 150 mm
d. Crack Control
Chose "1" or "2" : 2 INTERIOR EXPOSURE
1 EXTERIOR EXPOSURE
2 INTERIOR EXPOSURE
s = 150 mm ; b = 1.35 for Slab
bw = 1000 mm
dc = 30 mm
A = 2 * s* dc = 9000 mm2
fs = 0.6 * fy = 276 MPa
z = fs * ( dc * A)1/3 = 17839 N/mm
= 17.839 MN/m < 30 MN/m OK !!
w = 11*b *fs* (dc*A)1/3 = 0.2649 mm < 0.4 mm OK !!
100000
SPREAD FOUNDATION
1. Loading Data
P Loading : a. Permanent Load b. Temporary Load
Mx P = Axial Load
(Mz) ( w/o foundation weight )
Vx = 21.43 ton P = 23.62 ton
(Vz Vx = Shear ( x - direction )
) = 2.1 ton Vx = 2.95 ton
Vz = Shear ( z - direction )
= 3.10 ton Vz = 2.58 ton
Df H Mx = Moment ( x - direction )
= 0.00 ton. m Mx = 0.00 ton.m
Mz = Moment ( z - direction )
= 0.00 ton.m Mz = 0.00 ton.m
Note : Leter inside bracket means Forces which have direction perpendicular
to this plane.
B (L)
2. Assumed Dimension
b
h
Foundation Size Data :
H= 110 cm
Df = 80 cm
B= 440 cm
L= 300 cm
hf = 40 cm
d= 32.5 cm
H Df b= 45 cm
h= 45 cm
d hf
c1
Punching Shear Line :
b1
b1 = b + d = 77.5 cm
b2 = h + d = 77.5 cm
c1 = b/2 + d = 55 cm
L b2 c2 = h/2 + d = 55 cm
z c2
B
3. Check of Soil Reaction "fe"
Design Loads :
a) Vertical Loads (P)
Where,Wf = Wp + Wb + Ws = 22370.4 Kg
Wp = Pedestal weight = 340.2 Kg
Wb = Footing weight = 12672 Kg
Ws = Soil weight on Footing = 9358.2 Kg
Permanent : Temporary :
Mx1 = Vx . H Mx1 = Vx . H
= 2310 kg m = 3245 kg m
Mz1 = Vz . H Mz1 = Vz . H
ex
(ez) = 3404.5 kg m = 2835.8 kg m
c) Eccentricity (e)
P tot
- Perm. : Mx.tot = Mx1 + Mx = 2310 kg m ex = 5.2739 cm
Mz.tot = Mz1 + Mz = 3404.5 kg m ez = 7.7728 cm
- Temp. : Mx.tot = Mx1 + Mx = 3245 kg m ex = 7.0558 cm
Mz.tot = Mz1 + Mz = 2835.8 kg m ez = 6.1661 cm
Xn > B
(L)
d) Compute "fe" : P tot
fe = a2 B.L
Take " a " depend on " e " condition below :
a = 1 + factor x + factor z
Where : ex(ez) < B(L)/6, factor x (z) = 6 ex(ez)/ B (L)
Xn < B ex(ez) > B(L)/6, factor x (z) = 2/ [3{0.5-ex(ez)/ B (L)}]
(L)
for this case :
- Perm. : ex < B/6 Factor x = 0.07
ez < L/6 Factor z = 0.16
Xn = Neutral Axis
- Temp. : ex < B/6 Factor x = 0.10
ez < L/6 Factor z = 0.12
e) Allowable soil stress "Fe" :
- Permanent - Temporary
Fe = 0.40 kg/cm2 Fe = 0.52 kg/cm2
f) Soil stress "fe" :
- Permanent - Temporary
P tot = 0.41 kg/cm2 P tot = 0.42 kg/cm2
fe = a fe =a
B*L B*L
> Fe Change < Fe OK !
a = 1.227 a = 1.220
4. Check of Stability
Permanent : Temporary :
Overturning Moment ( OM ) : Mx tot = 2310 kg m Mx tot = 3245 kg m
Mz tot = 3404.5 kg m Mz tot = 2835.8 kg m
9
Resistant Moment ( RM ) : Ptot.B/2 = 96361 kg m Ptot . B/2 = 101179 kg m
Ptot.L/2 = 65701 kg m Ptot . L/2 = 68986 kg m
Permanent Load : RM / OM = Ptot . B = 41.7 > 2.0
2 . Mx tot
Ptot . L 19.3 > 2.0
2 . Mz tot
Temporary Load : RM / OM = Ptot . B = 31.2 > 1.5
2 . Mx tot
Ptot . L 24.3 > 1.5
2 . Mz tot
5. Footing Design
5.1 Design Soil Reaction "qus"
fe max = 0.425 kg/cm2
qus = 1.6 * ( fe max - Wf ) 0.409 kg/cm2 ; Note : 1.6 is used an average load factor,
B.L because the proportion of dead and
live load are not known.
5.2 Required Re-bar due to Bending Moment
a. Design Moment :
Mux = qus . L . ( B - b )2 /8 = 23912.0 kg m
Muz = qus . B . ( L - h )2 /8 = 14616.1 kg m
b. Steel Ratio, r :
fy = 4000 kg/cm2
fc' = 122.5 kg/cm2
m= fy 38.4 ; Ø = 0.9
0.85 fc'
- About x - dirrection :
As = ro*L*d = 28.4 cm 2
D= 16 mm ; Ab = 2.01 cm2
n = A s / Ab 15
Spacing, s = 191 mm ; whichever is smaller.
Spacing Limit : S max = 2d = 650 mm Spacing s = 190 mm
take : D 16 @ 190
- About z - dirrection :
take : D 16 @ 500
5.3 Check of Shear Stress
Vup = qus * ( B*L - b1*b2) = 5.11 kg/cm2 < ø (1.06 vfc') = 9.972 kg/cm2
2 * ( b1 + b2 ) * d
Ok !!
6. Sketch :
D 16 @ 190 D 16 @ 500
7. Pedestal :
Check requirement :
Ratio = Pedestal Length 70
= 1.56 < 2.5 Short Column
Width of pedestal 45
=
Rebar requirement :
ht hs
;
hp
Mx = Moment ( x - direction )
Mx = 0.50 ton. m ; Mx =
Mz = Moment ( z - direction )
hc
Mz = 0.60 ton.m ; Mz =
1 2
3. Reaction :
Footing weight, Wf = Wp + Wc + Ws + Wt =
Wp = Pedestal weight =
C
wc
lp
Ws = Slab weight on Footing =
A B A
Total Loading : a. Permanent L ; b. Temporary Load
E
lc Pt = Total Axial Load = P + Wf
Pt = 20.284 ton Pt =
Pedestal / Column : Vx = 5.00 ton ; Vx =
length, lp = 40.0 cm Vz = 1.50 ton ; Vz =
width, wp = 40.0 cm Mtx = 6.02 ton. m ; Mtx =
depth, hp = 120.0 cm Mtz = 2.40 ton. m ; Mtz =
0.90 ton.m
5.284 ton
0.461 ton
3.036 ton
1.017 ton
0.770 ton
b. Temporary Load
21.284 ton
6.00 ton
2.50 ton
7.23 ton.m
3.90 ton.m
b. Temporary Load
0.340 m
0.183 m
0.9898 m
0.310 m
0.183 m
25.27 ton
38.58 ton
SECONDARY BEAM DESIGN
1. Loading Data
+ Mu - DIAGRAM
Vu - DIAGRAM
span, B = 4 m
L= 7 m
d b= 30 cm
h= 70 cm
d= 62.8 cm
m = fy = 14.529 ; ø = 0.9
0.85 fc'
As = ro * b* d= 18.35 cm2
D = 20 mm ; Ab = 3.14 cm2
n = A s / Ab = 6 Aprov. = 18.85 cm2
Spacing = 2.12 cm
D = 12 mm ; Ab = 1.13 cm2
As = Vs*100/(fy*d) = 8.4118 cm2
n = 4
spacing,s = 1000 / (n - 1) = 333 mm
SKETCH :
Min. is
Required
Min. is
Required
Min. is
Required
Not Necessary
To be Required
Min. is
Required
To be Required
To be Required
Min. is
Required
Not Necessary
To be Required
Min. is
Required
To be Required
Min. is
Required
To be Required
Min. is
Required
Min. is
Required
Not Necessary
Min. is
Required
Not Necessary
To be Required
Min. is
Required
Min. is
Required
Not Necessary
Min. is
Required
Not Necessary
Min. is
Required
Not Necessary
To be Required
Min. is
Required
Min. is
Required
Not Necessary
COLUMN-TBL
NOTE :
y = S EIk / lk ; y = 0 ( fixed end ) ø= 0.7
S EIb / lb y = 10 ( column end supported on footing ) Pc = p2 EIk
EIk = ( Ec Igk / 2.5 ) ; EIb = ( Ec Igb / 5 ) (kLu)^2
1 + ßd 1 + ßd
fc' = 210 kg/cm2
Ec = 15100* fc'^.5 = 218.82 ton/cm2
x - dir : z - dir :
Igk = 1/12 bh3 = 67500 cm4 Igk = 1/12 hb3 = 67500 cm4
Ec Igk = 1477.0 ton m2 Ec Igk = 1477.0 ton m2
EIk = 393.9 ton m2 EIk = 393.9 ton m2
Igb = 106667 cm4 Igb = 106667 cm4
Ec Igb = 2334.1 ton m2 Ec Igb = 2334.1 ton m2
EIb = 311.2 ton m2 EIb = 311.2 ton m2
lb = 6.0 m lb = 5.0 m
yA = 2.17 yA = 1.81
yB = 10 yB = 10
k= 2 ( from monogram ) k= 1.22 ( from monogram )
Check Eccentricity :
et = dMu / Pu = 0 mm
et min = ( 15 + 0.03 h ) = 24 mm
If et < et min , Mu should be taken from Pu . et min
NOTE :
y = S EIk / lk ; y = 0 ( fixed end ) ø= 0.7
S EIb / lb y = 10 ( column end supported on footing ) Pc = p2 EIk
EIk = ( Ec Igk / 2.5 ) ; EIb = ( Ec Igb / 5 ) (kLu)^2
1 + ßd 1 + ßd
fc' = 210 kg/cm2
Ec = 15100* fc'^.5 = 218.82 ton/cm2
x - dir : z - dir :
Igk = 1/12 bh3 = 67500 cm4 Igk = 1/12 hb3 = 67500 cm4
Ec Igk = 1477.0 ton m2 Ec Igk = 1477.0 ton m2
EIk = 393.9 ton m2 EIk = 393.9 ton m2
yA = 2.17 yA = 1.81
yB = 2.17 yB = 1.81
k= 1.6 ( from monogram ) k= 1.6 ( from monogram )
Check Eccentricity :
et = dMu / Pu = 444 mm
et min = ( 15 + 0.03 h ) = 24 mm
NOTE :
y = S EIk / lk ; y = 0 ( fixed end ) ø= 0.7
S EIb / lb y= 10 ( column end supported on footing ) Pc = p2 EIk
EIk = ( Ec Igk / 2.5 ) ; EIb = ( Ec Igb / 5 ) (kLu)^2
1 + ßd 1 + ßd
fc' = 210 kg/cm2
Ec = 15100* fc'^.5 = 218.82 ton/cm2
x - dir : z - dir :
Igk = 1/12 bh3 = 67500 cm4 Igk = 1/12 hb3 = 67500 cm4
Ec Igk = 1477.0 ton m2 Ec Igk = 1477.0 ton m2
EIk = 393.9 ton m2 EIk = 393.9 ton m2
Igb = 106667 cm4 Igb = 106667 cm4
Ec Igb = 2334.1 ton m2 Ec Igb = 2334.1 ton m2
EIb = 311.2 ton m2 EIb = 311.2 ton m2
lb = 6.0 m lb = 5.0 m
yA = 2.17 yA = 1.81
yB = 10 yB = 10
k= 2 ( from monogram ) k= 1.22 ( from monogram )
Check Eccentricity :
et = dMu / Pu = 0 mm
et min = ( 15 + 0.03 h ) = 24 mm
NOTE :
y = S EIk / lk ; y = 0 ( fixed end ) ø= 0.7
S EIb / lb y= 10 ( column end supported on footing ) Pc = p2 EIk
EIk = ( Ec Igk / 2.5 ) ; EIb = ( Ec Igb / 5 ) (kLu)^2
1 + ßd 1 + ßd
fc' = 210 kg/cm2
Ec = 15100* fc'^.5 = 218.82 ton/cm2
x - dir : z - dir :
Igk = 1/12 bh3 = 67500 cm4 Igk = 1/12 hb3 = 67500 cm4
Ec Igk = 1477.0 ton m2 Ec Igk = 1477.0 ton m2
EIk = 393.9 ton m2 EIk = 393.9 ton m2
Igb = 106667 cm4 Igb = 106667 cm4
Ec Igb = 2334.1 ton m2 Ec Igb = 2334.1 ton m2
EIb = 311.2 ton m2 EIb = 311.2 ton m2
lb = 6.0 m lb = 5.0 m
yA = 2.17 yA = 1.81
yB = 2.17 yB = 1.81
k= 1.6 ( from monogram ) k= 1.6 ( from monogram )
Check Eccentricity :
et = dMu / Pu = 444 mm
et min = ( 15 + 0.03 h ) = 24 mm
NOTE :
y = S EIk / lk ; y = 0 ( fixed end ) ø= 0.7
S EIb / lb y= 10 ( column end supported on footing ) Pc = p2 EIk
EIk = ( Ec Igk / 2.5 ) ; EIb = ( Ec Igb / 5 ) (kLu)^2
1 + ßd 1 + ßd
yA = 16.00 yA = 14.81
yB = 10 yB = 10
k= 2.2 ( from monogram ) k= 2.15 ( from monogram )
Check Eccentricity :
et = dMu / Pu = -30 mm
et min = ( 15 + 0.03 h ) = 33 mm
X
C1 900 0.27 0.00 0.022 0.0176 15.8 9.0 15.8 8 - D 16 Vu 1.300 3.666 7.332 7.332 14.545 D 10 @ 130 D 10 @ 125 Not Necessary
Z
NOTE :
d'/h = 0.17
d = 26
r = rb ; b= 0.8 :ø= 0.65
Ast = r Ag Actual Re-bar,
Ast min = 0.01 Ag Asto is Ast or Ast min whichever is larger
CONCRETE-COLUMN DESIGN
Material :
fc' = 210 kg/cm2
fy = 4000 kg/cm2
X
C2 900 0.17 0.14 0.016 0.0128 11.5 9.0 11.5 6 - D 16 Vu 2.040 3.414 6.828 6.828 13.176 D 10 @ 130 D 10 @ 125 Not Necessary
Z
NOTE :
d'/h = 0.17
d = 26
r = rb ; b= 0.8 : ø = 0.65
Ast = r Ag Actual Re-bar,
Ast min = 0.01 Ag Asto is Ast or Ast min whichever is larger
X
C3 900 0.27 0.22 0.016 0.0128 11.5 9.0 11.5 6 - D 16 Vu 2.040 3.666 7.332 7.332 10.512 D 10 @ 130 D 10 @ 125 Not Necessary
Z
NOTE :
d'/h = 0.17
d = 26
r = rb ; b= 0.8 :ø= 0.65
Ast = r Ag Actual Re-bar,
Ast min = 0.01 Ag Asto is Ast or Ast min whichever is larger
CONCRETE-COLUMN DESIGN
Material :
fc' = 210 kg/cm2
fy = 4000 kg/cm2
X
C4 900 0.17 0.14 0.016 0.0128 11.5 9.0 11.5 6 - D 16 Vu 2.040 3.414 6.828 6.828 13.176 D 10 @ 130 D 10 @ 125 Not Necessary
Z
NOTE :
d'/h = 0.17
d = 26
r = rb ; b= 0.8 :ø= 0.65
Ast = r Ag Actual Re-bar,
Ast min = 0.01 Ag Asto is Ast or Ast min whichever is larger
X
C5 3600 0.25 0.14 0.06 0.048 172.8 36.0 172.8 86 - D 16 Vu 2.040 15.575 31.150 31.150 61.522 D 10 @ 280 D 10 @ 125 Not Necessary
Z
NOTE :
d'/h = 0.08
d = 56
r = rb ; b= 0.8 :ø= 0.65
Ast = r Ag Actual Re-bar,
Ast min = 0.01 Ag Asto is Ast or Ast min whichever is larger
SECTION
TOP BAR 5 D16 2 D16 6 D16 2 D16 5 D20 2 D20 4 D16 2 D16
WEB BAR - - - - - - - -
BOTTOM BAR 3 D16 3 D16 3 D16 5 D16 2 D16 4 D16 2 D16 4 D16
STIRRUP D10 - 150 D10 - 150 D10 - 200 D10 - 200 D10 - 200 D10 - 200 D8 - 100 D8 - 100
CROSS BAR - - - - - - - -
MARKS GB5 B1 B2 B3
DIMENSION 400 x 200 400 x 200 300 x 200 450 x 200
BOTH END MIDDLE BOTH END MIDDLE BOTH END MIDDLE BOTH END MIDDLE
SECTION
TOP BAR 4 D16 2 D16 5 D16 2 D16 6 D16 4 D16 4 D16 4 D16
WEB BAR - - - - - - - -
BOTTOM BAR 2 D16 4 D16 3 D16 3 D16 3 D16 5 D16 2 D16 5 D16
STIRRUP D10 - 150 D10 - 150 D10 - 150 D10 - 175 D10 - 175 D10 - 200 D10 - 175 D10 - 200
CROSS BAR - - - - - - - -
MARKS B4
DIMENSION 300 x 150
BOTH END MIDDLE BOTH END MIDDLE BOTH END MIDDLE BOTH END MIDDLE
SECTION
8 D16
-
-
D10 - 125
-
Lintel Column
150 x 150
4 D10
-
-
D8 - 125
-
CONCRETE MEMBER SCHEDULLE
MARKS C1 C2 C3
DIMENSION 275 x 275 300 x 300 325 x 325
SECTION
SECTION