WELDING VISUAL INSPECTION PROCEDURE
02 | 02.08.2004 COMMENT AS NOTED MZ MS.KH
01 | 20.06.2004 ISSUED FOR COMMENT. HH MSKH
PRD “APPR
Rev. | Issue Date DESCRIPTION sy _| By Ed
DISCIPLINE,= Project No. | Rev.
)Eainring Quality Assurance System BY.045, #2
eae, ate: 02,08,2004
Welding Visual Inspesction Procedure | gps
WELDING VISUAL INSPECTION PROCEDURE
1) PURPOSE
This procedure describes the inspection method for visual inspection of welded joints
2) SCOPE
The following procedure covers the general requirement for welding visual inspection
of steel
structure parts and header boxes relevant to air cooled heat exchangers.
3) RESPONSIBILITY
Alll welded joints shall be inspect and reported by qualified welding inspector under
supervision of quality control manager.
4) REFERENCE STANDARD
) Project specification
ii) ASME VIII & ASME V
iii) API661
5) DESCRIPTION
5.1- All joint preparation shall be control by welding inspector before commencement
of any welding activity.
'5.2- The bevel preparation shall be according to welding details and project drawing
or specification, and also the weld seams to be cleaned and free of oil, dust and other
contamination before performance of welding activity.
5.3- Butt weld shall be aligned and retained in position during welding. Misalignment
will be within the tolerances as per ASME VIIL. Div.1 UW-31
5.4- Component may be assembled by bars; clamps, tack welds or other suitable
methods,
Tack welding of base metal outside area interested by welding shall be avoided
whenever possible.
Material used for tack welding shall be compatible with base metal.Sab
nginerng
Company
peterses)
Project No.
Rev.
Quality Assurance System
PJ.045,
2.
‘Welding Visual Inspesction Procedure
Date: 02.08.2004
Sheet 5 of 5
‘SR_NO. | HEADERNO. | _JOINTNO. | _W. STAMP.
NOTE:
RESULT
REMARK