You are on page 1of 3
‘Owner: KPIC | Costumer: Namvaran Stack-4201 SSE" | Location: Kermanshah- Iran sabe neering ‘Company ie te SS ‘Document No; SEC-PI04SST-IFP-0010 ‘SEC-Project Nos PIO WELDING VISUAL INSPECTION PROCEDURE 02 | 02.08.2004 COMMENT AS NOTED MZ MS.KH 01 | 20.06.2004 ISSUED FOR COMMENT. HH MSKH PRD “APPR Rev. | Issue Date DESCRIPTION sy _| By Ed DISCIPLINE, = Project No. | Rev. )Eainring Quality Assurance System BY.045, #2 eae, ate: 02,08,2004 Welding Visual Inspesction Procedure | gps WELDING VISUAL INSPECTION PROCEDURE 1) PURPOSE This procedure describes the inspection method for visual inspection of welded joints 2) SCOPE The following procedure covers the general requirement for welding visual inspection of steel structure parts and header boxes relevant to air cooled heat exchangers. 3) RESPONSIBILITY Alll welded joints shall be inspect and reported by qualified welding inspector under supervision of quality control manager. 4) REFERENCE STANDARD ) Project specification ii) ASME VIII & ASME V iii) API661 5) DESCRIPTION 5.1- All joint preparation shall be control by welding inspector before commencement of any welding activity. '5.2- The bevel preparation shall be according to welding details and project drawing or specification, and also the weld seams to be cleaned and free of oil, dust and other contamination before performance of welding activity. 5.3- Butt weld shall be aligned and retained in position during welding. Misalignment will be within the tolerances as per ASME VIIL. Div.1 UW-31 5.4- Component may be assembled by bars; clamps, tack welds or other suitable methods, Tack welding of base metal outside area interested by welding shall be avoided whenever possible. Material used for tack welding shall be compatible with base metal. Sab nginerng Company peterses) Project No. Rev. Quality Assurance System PJ.045, 2. ‘Welding Visual Inspesction Procedure Date: 02.08.2004 Sheet 5 of 5 ‘SR_NO. | HEADERNO. | _JOINTNO. | _W. STAMP. NOTE: RESULT REMARK

You might also like