You are on page 1of 12

NPD LTD

Materials Testing Site Laboratory


Project:Musanze second city
CONTRACT No:RW-LODA/MUSANZE.5341-CW-RFB
ENGINEER: JV PACE HYCOGEC

Sample
Location: Pk 21+700 Applicable Standard: AASHTO Sample No.: Cut materials

Test method: T 180 Sampling Date: 23/01/2018


SAMPLED BY: NPD & Consultant
NPD Testing Date: 24-Jan-190

DETERMINATION OF MDD/OMC
1 2 3 4 5
WEIGHT OF SAMPLE ( g ) 6000 6000 6000 6000 6000
WATER ADDED ( % ) 6 8 1O 12 14
AMOUNT OF WATER ( mls) 360 480 600 720 840
WT. OF WET SOIL + MOULD (g) 9922 10163 10613 10101 10763
WT. MOULD (g) 6015 6015 6210 6210 6210
WT. OF WET SOIL (g) =A 3907 4148 4403 3891 4553
VOLUME OF MOULD =B 2120.0 2120.0 2120.0 2120.0 2120.0
BULK DENSITY =A/B=X 1.843 1.957 2.077 1.835 2.148

CONTAINER NO C1 m3 Tw2 X C
WT. OF WET SOIL + TIN ( g ) 93.0 106.6 104.4 60.2 112.4
WT. OF DRY SOIL + TIN ( g ) 89.4 99.4 95.8 54.2 100.8
WT. OF CONTAINER (g) 24.0 24.6 24.6 13.2 21.2
WT. OF WATER (g) =C 3.6 7.2 8.6 6.0 11.6
NET WT. OF DRY SOIL (g) =D 65.4 74.8 71.2 41.0 79.6
MOISTURE CONTENT % =C/D*100=Y 5.5 9.6 12.1 14.6 14.6
DRY DENSITY =X/(Y+100)*100 1.747 1.785 1.853 1.601 1.874

Modified Proctor Test (Graphic)


1.980
1.930

1.880
Dry Density [g/cm3]

1.830

1.780
w%=4.4

1.730
dmax=
1.680

1.630

1.580
5.0 7.0 9.0 11.0 13.0 15.0 17
Moisture Content [%]
1.580
5.0 7.0 9.0 11.0 13.0 15.0 17
Moisture Content [%]

MDD = 2.282 g/cm3 O.M.C = 4.4 %


APPROVED BY ACE Mate
TESTED BY NPD Technician APPROVED BY NPD Material Engineer CHECKED BY ACE Technician Engineer

NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE

DATE DATE DATE DATE


Cut materials

23/01/2018

24-Jan-1900

5
6000
16
960
10770
6210
4560
2120.0
2.151

23
128.8
112.4
13.8
16.4
98.6
16.6
1.844
w%=4.4

15.0 17.0
15.0 17.0

PROVED BY ACE Material


Engineer

NAME & SIGNATURE


NPD LTD
Materials Testing Site Laboratory
Project:Musanze second city
CONTRACT No:RW-LODA/MUSANZE.5341-CW-RFB
ENGINEER: JV PACE HYCOGEC

Sample
Location: Pk 21+700 Applicable Standard: AASHTO Sample No.:

Test method: T 180 Sampling Date:


SAMPLED BY: NPD & Consultant
NPD Testing Date:

DETERMINATION OF MDD/OMC
1 2 3 4
WEIGHT OF SAMPLE ( g ) 6000 6000 6000 6000
WATER ADDED ( % ) 4 8 1O 12
AMOUNT OF WATER ( mls) 240 360 480 600
WT. OF WET SOIL + MOULD (g) 9717 9823 9928 10147
WT. MOULD (g) 5896 5896 5896 5896
WT. OF WET SOIL (g) =A 3821 3927 4032 4251
VOLUME OF MOULD =B 2120.0 2120.0 2120.0 2120.0
BULK DENSITY =A/B=X 1.802 1.852 1.902 2.005

CONTAINER NO B5 C2 1 B3L
WT. OF WET SOIL + TIN ( g ) 101.4 95.4 88.4 93.6
WT. OF DRY SOIL + TIN ( g ) 98.8 90.0 82.8 85.8
WT. OF CONTAINER (g) 24.4 24.0 24.2 13.6
WT. OF WATER (g) =C 2.6 5.4 5.6 7.8
NET WT. OF DRY SOIL (g) =D 74.4 66.0 58.6 72.2
MOISTURE CONTENT % =C/D*100=Y 3.5 8.2 9.6 10.8
DRY DENSITY =X/(Y+100)*100 1.741 1.712 1.736 1.810

Modified Proctor Test (Graphic)


1.980
1.930
1.880
Dry Density [g/cm3]

1.830 dmax=
1.780
w%=4.4

1.730
1.680
1.630
1.580
5.0 7.0 9.0 11.0 13.0 15.0 1
Moisture Content [%]
1.580
5.0 7.0 9.0 11.0 13.0 15.0 1
Moisture Content [%]

MDD = = g/cm3 O.M.C = =


APPROVED BY ACE M
TESTED BY NPD Technician APPROVED BY NPD Material Engineer CHECKED BY ACE Technician Engineer

NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATU

DATE DATE DATE DATE


Cut materials

23/01/2018

24-Jan-1900

5 5 5
6000 6000 6000
14 16 18
840 960 1080
10440 9970 10619
5896 5896 5896
4544 4074 4723
2120.0 2120.0 2120.0
2.143 1.922 2.228

B1C B6L B4L


83.8 99.8 81.8
74.6 90.6 74
13.2 13.2 13.4
9.2 9.2 7.8
61.4 77.4 60.6
15.0 11.9 12.9
1.864 1.718 1.974
w%=4.4

15.0 17.0
15.0 17.0

%
APPROVED BY ACE Material
Engineer

NAME & SIGNATURE


NPD LTD
Materials Testing Site Laboratory
Project:Musanze second city
CONTRACT No:RW-LODA/MUSANZE.5341-CW-RFB
ENGINEER: JV PACE HYCOGEC

Sample
Location: Pk 21+700 Applicable Standard: AASHTO Sample No.: Cut materials

Test method: T 180 Sampling Date: 23/01/2018


SAMPLED BY: NPD & Consultant
NPD Testing Date: 24-Jan-190

DETERMINATION OF MDD/OMC
1 2 3 4 5
WEIGHT OF SAMPLE ( g ) 6000 6000 6000 6000 6000
WATER ADDED ( % ) 6 8 1O 12 14
AMOUNT OF WATER ( mls) 360 480 600 720 840
WT. OF WET SOIL + MOULD (g) 9922 10163 9862 10201 10763
WT. MOULD (g) 6015 6015 6210 6210 6210
WT. OF WET SOIL (g) =A 3907 4148 3652 3991 4553
VOLUME OF MOULD =B 2120.0 2120.0 2120.0 2120.0 2120.0
BULK DENSITY =A/B=X 1.843 1.957 1.723 1.883 2.148

CONTAINER NO C1 m3 Tw2 X C
WT. OF WET SOIL + TIN ( g ) 93.0 106.6 103.4 59.2 112.4
WT. OF DRY SOIL + TIN ( g ) 89.4 99.4 95.8 54.2 100.8
WT. OF CONTAINER (g) 24.0 24.6 24.6 13.2 21.2
WT. OF WATER (g) =C 3.6 7.2 7.6 5.0 11.6
NET WT. OF DRY SOIL (g) =D 65.4 74.8 71.2 41.0 79.6
MOISTURE CONTENT % =C/D*100=Y 5.5 9.6 10.7 12.2 14.6
DRY DENSITY =X/(Y+100)*100 1.747 1.785 1.556 1.678 1.874

Modified Proctor Test (Graphic)


1.900
1.850

1.800
Dry Density [g/cm3]

1.750

1.700
w%=14.8

1.650
dmax= 1.880
1.600

1.550

1.500
10.0 11.0 12.0 13.0 14.0 15.0 16.0 17
Moisture Content [%]
1.500
10.0 11.0 12.0 13.0 14.0 15.0 16.0 17
Moisture Content [%]

MDD = 1.880 g/cm3 O.M.C = 14.8 %

APPROVED BY ACE Mate


TESTED BY NPD Technician
APPROVED BY NPD Material Engineer CHECKED BY ACE Technician Engineer

NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE

DATE DATE DATE DATE


Cut materials

23/01/2018

24-Jan-1900

5
6000
16
960
10670
6210
4460
2120.0
2.104

23
128.8
112.4
13.8
16.4
98.6
16.6
1.804
w%=14.8

16.0 17.0
16.0 17.0

PROVED BY ACE Material


Engineer

NAME & SIGNATURE

You might also like