You are on page 1of 6

Pour Card

Correction for Moisture content for PQC


(AS PER IRC-44)
Name of Work : RESURFACING OF Runway and allied works services at A/F Station,Jamnagar

Contract Agreement No : CE (AF)G /JAM /39 OF 2018-2019

Name of Contractor : M/s.KCC Buildcon Pvt. Ltd.

Client : Military Engineer Services

Date :- 9/10/2020

Total
Water Quantity of
Oven moisture Corrected Qdry= Qwet= Qty of Actual WT of
Weight of absorption material as per ∑ Qwet CA Total WT of
Size of material
Sample (g)
dried wt. content
(WA)
moisture
design Qssd
Qssd/ Qdry *
& Qwet FA WET Agg
corrected materials after 0.03m3
(g) (TMC) (MC-WA) % (1+WA/100) (1+MC/100) water (Kg) correction (kg)
% per m3(Kg)
%

31.5mm(21%) 1000 1000 0.00 0.78 -0.78 423 419.73 419.73 -3.27 424.23 12.73
20 mm(21%) 1000 1000 0.00 0.92 -0.92 427 423.11 423.11 1269.36 -3.89 424.23 12.73
2020.12
10 mm(21%) 1000 1000 0.00 1.05 -1.05 431 426.52 426.52 -4.48 424.23 12.73
c stone dust(37%) 1000 1000 0.00 1.23 -1.23 760 750.77 750.77 750.77 -9.23 747.44 22.42
Cement ULTRA TECH OPC 43 GRADE 400 400 400.13 400.13 0.00 400.13 12.00
Admixture MARUTI TRIAL 2 2 2.801 2.801 0.00 2.801 0.08
Recron 1 1 1 1 0.00 1 0.03
Water 152 152 128 128 -20.9 172.9 5.19
Check for moisture correction 2596.0 2596.9 77.91
Remark -:

Lab I/C Contractor's . Rep. J.E(Civ) ENGR-IN-CHARGE


419.70 3.3
423.07 3.93
426.47 4.53
750.65 9.35
400.00 0
2.00 0
1.00 0
152.00 0
2596.00 0
0 0
21.1
Pour Card
Correction for Moisture content for PQC
(AS PER IRC-44)
Name of Work : RESURFACING OF Runway and allied works services at A/F Station,Jamnagar

Contract Agreement No : CE (AF)G /JAM /39 OF 2018-2019

Name of Contractor : M/s.KCC Buildcon Pvt. Ltd.

Client : Military Engineer Services

Date :- 8/19/2020

Total Actual WT of
Water Quantity of
Oven moisture Corrected Qdry= Qwet= Qty of materials
Weight of absorption material as per ∑ Qwet CA Total WT of
Size of material dried wt. content moisture Qssd/ Qdry * corrected after
Sample (g) (WA) design Qssd & Qwet FA WET Agg
(g) (TMC) (MC-WA) % (1+WA/100) (1+MC/100) water (Kg) correction
% per m3(Kg)
% (kg)
31.5mm(21%) 2593 2560 1.29 1.26 0.03 434.87 429.46 434.99 0.12 444.77
20 mm(21%) 1640 1606 2.12 1.25 0.87 434.87 429.50 438.59 1315.51 3.72 444.77
10 mm(21%) 964 937 2.88 1.24 1.64 434.87 429.54 441.92 2117.95 7.05 444.77
RIVER SAND(37%) 1000 950 5.26 0.51 4.75 766.21 762.32 802.44 802.44 36.23 783.64
Cement Ultra tech OPC 43 Grade 400.13 400.13 400.13 400.13 0.00 400.13
Admixture Maruti SP 400PQC 2.801 2.801 2.801 2.801 0.00 2.801
Recron 1 1 1 1 0.00 1
Water 128.04 128.04 128.04 128.04 47.1 80.9
Check for moisture correction 2602.8 2602.8
Remark -:

Lab I/C Contractor's . Rep. J.E(Civ) ENGR-IN-CHARGE


Pour Card
Correction for Moisture content for PQC
(AS PER IRC-44)
Name of Work : RESURFACING OF Runway and allied works services at A/F Station,Jamnagar

Contract Agreement No : CE (AF)G /JAM /39 OF 2018-2019

Name of Contractor : M/s.KCC Buildcon Pvt. Ltd.

Client : Military Engineer Services

Date :- 8/19/2020

Total Actual WT of
Water Quantity of
Oven moisture Corrected Qdry= Qwet= Qty of materials
Weight of absorption material as per ∑ Qwet CA Total WT of
Size of material dried wt. content moisture Qssd/ Qdry * corrected after
Sample (g) (WA) design Qssd & Qwet FA WET Agg
(g) (TMC) (MC-WA) % (1+WA/100) (1+MC/100) water (Kg) correction
% per m3(Kg)
% (kg)
31.5mm(21%) 2593 2560 1.29 1.26 0.03 434.87 429.46 434.99 0.12 450.64
20 mm(21%) 1640 1606 2.12 1.25 0.87 434.87 429.50 438.59 1315.51 3.72 450.64
10 mm(21%) 964 937 2.88 1.24 1.64 434.87 429.54 441.92 2145.93 7.05 450.64
RIVER SAND(37%) 1000 918 8.93 0.51 8.42 766.21 762.32 830.42 830.42 64.21 793.99
Cement Ultra tech OPC 43 Grade 400.13 400.13 400.13 400.13 0.00 400.13
Admixture Maruti SP 400PQC 2.801 2.801 2.801 2.801 0.00 2.801
Recron 1 1 1 1 0.00 1
Water 128.04 128.04 128.04 128.04 75.1 52.9
Check for moisture correction 2602.8 2602.8
Remark -:

Lab I/C Contractor's . Rep. J.E(Civ) ENGR-IN-CHARGE


Pour Card
Correction for Moisture content for PQC
Name of Work : RESURFACING OF Runway and allied works services at A/F Station,Jamnagar

Contract Agreement No : CE (AF)G /JAM /39 OF 2018-2019

Name of Contractor : M/s.KCC Buildcon Pvt. Ltd.

Client : Military Engineer Services

Date :- 6/24/2020

Total Actual WT of
Water Quantity of
Oven moisture Corrected Qdry= Qwet= Qty of materials
Weight of absorption material as per ∑ Qwet CA Total WT of
Size of material dried wt. content moisture Qssd/ Qdry * corrected after
Sample (g) (WA) design Qssd & Qwet FA WET Agg
(g) (TMC) (MC-WA) % (1+WA/100) (1+MC/100) water (Kg) correction
% per m3(Kg)
% (kg)
31.5mm(21%) 1000 990 1.01 1.26 -0.25 434.87 429.46 433.80 -1.07 445.40
20 mm(21%) 1000 980 2.04 1.25 0.79 434.87 429.50 438.27 1317.65 3.40 445.40
10 mm(21%) 1000 964 3.73 1.24 2.49 434.87 429.54 445.58 2120.94 10.71 445.40
c stone dust(37%) 1000 949 5.37 0.51 4.86 766.21 762.32 803.29 803.29 37.08 784.75
Cement Ultra tech OPC 43 Grade 400.13 400.13 400.13 400.13 0.00 400.13
Admixture Maruti SP 400PQC 2.801 2.801 2.801 2.801 0.00 2.801
Recron 1 1 1 1 0.00 1
Water 128.04 128.04 128.04 128.04 50.1 77.9
Check for moisture correction 2602.8 2602.8
Remark -:

Lab I/C Contractor's . Rep. J.E(Civ) ENGR-IN-CHARGE


Pour Card
Correction for Moisture content for PQC
(AS PER IRC-44)
Name of Work : RESURFACING OF Runway and allied works services at A/F Station,Jamnagar

Contract Agreement No : CE (AF)G /JAM /39 OF 2018-2019

Name of Contractor : M/s.KCC Buildcon Pvt. Ltd.

Client : Military Engineer Services

Date :- 8/18/2020

Total Actual WT of
Water Quantity of
Oven moisture Corrected Qdry= Qwet= Qty of materials
Weight of absorption material as per ∑ Qwet CA Total WT of
Size of material dried wt. content moisture Qssd/ Qdry * corrected after
Sample (g) (WA) design Qssd & Qwet FA WET Agg
(g) (TMC) (MC-WA) % (1+WA/100) (1+MC/100) water (Kg) correction
% per m3(Kg)
% (kg)
31.5mm(21%) 1000 1000 0.00 1.26 -1.26 434.87 429.46 429.46 -5.41 439.04
20 mm(21%) 1000 1000 0.00 1.25 -1.25 434.87 429.50 429.50 1304.08 -5.37 439.04
10 mm(21%) 1000 965 3.63 1.24 2.39 434.87 429.54 445.12 2090.67 10.25 439.04
c stone dust(37%) 1000 955 4.71 2.00 2.71 766.21 751.19 786.58 786.58 20.37 773.55
Cement Ultra tech OPC 43 Grade 400.13 400.13 400.13 400.13 0.00 400.13
Admixture Maruti SP 400PQC 2.801 2.801 2.801 2.801 0.00 2.801
Recron 1 1 1 1 0.00 1
Water 128.04 128.04 128.04 128.04 19.8 108.2
Check for moisture correction 2602.8 2602.8
Remark -:

Lab I/C Contractor's . Rep. J.E(Civ) ENGR-IN-CHARGE

You might also like