1.5 m 3m
FLIGHT DETAIL
RISE = 0.173 m
TREAD = 0.25 m
Self weight of slab = 0.438 t/m
Flooring = #REF! t/m
Load from hand rail and finishing (L.S.) = 0.050 t/m
2.5 m
1.000 m
DESIGN OF STAIR
1500 mm
4500 mm
It is proposed that one end of Flight No. - 1 at its base at floor level by pro
supported on landing beam. Flight No. - 2 is supported on landing beam a
Flooring
Live load
Live load per metre run on slab
Total Dead load imposed on waist slab
Thickness of ceiling plastering =
15 MM
40 MM
= =
Load from hand rail and finishing (L.S.) =
0.468 X 3.750
3
= 0.584 T/M
Masmohana Rwss
= 0.312 T/M
DESIGN OF FLIGHT
0.714 T/M
1.047 T/M
0.714 T/M
1.047 T/M
A B
4500
RB X 4.500 =
1.047 X
3.000 X 1.500 +
3
2
Reaction at
= 2.272 T
"B" (RB)
Reaction at
= 0.714 X
"A" (RA)
Maximum bending moment will occur at the section where shere shear force in minimum or zero
shear force (S.F.) be zero at a distance "D" from "B"
RB = 1.047 X D
2.170 M
Masmohana Rwss
2.170 X 2.170
2
= 2.465 T-M
2.465 T-M
= 149 MM
Ast
= 0.5 X fck
1 - 1-
4.60 X MU
2
XbXd
fy fck X b X d
Kbfck OK
A = 0.5 X 20
1- 1-
X 1000 X 149
PROVIDE 12 MM TOR
8 MM TOR
Ast =
210.00 Sq.mm
PROVIDE 8 MM TOR
Span/d= 30.20
pt at midspan = 0.506 %
fs= 246
250 mm
173 mm
3000 mm
FLIGHT DETAIL
1.0 m
OR EACH FLIGHT :
light No. - 1 at its base at floor level by providing pedestal and beam below the first step and other end
ght No. - 2 is supported on landing beam and landing beam at roof level respectively.
(1.500+3.000) = 4.5 m
m)OF WAIST SLAB = 0.175 m
= 0.150 t/Sqm
(0.150*1.000) = 0.150 t/m
= 0.438 t/m + 0
= 0.249
1.047 T/M
1
5 0.714
0.096 +
0 T/M
almost similar,
0
1.500 + 4 3.000 - 2.272 = 1.939 T
7
the section where shere shear force in minimum or zero. Let the
1.047 X D
X 2.170 - 1.047 X
= 2.465 T-M