Project: Building of District Technical Office

Beam Consultant Pvt. Ltd. Page No: 1 of 1


Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
A Foundation pad rebar
Footing F1 16 2 38 76 9.91 - - - 362.34 - -
Footing F2 16 2 33 66 8.66 - - - 274.98 - -
Footing F3 16 4 35 140 9.16 - - - 616.96 - -
Footing F4 16 2 28 56 9.66 - - - 260.25 - -
Footing F5 16 2 26 52 8.91 - - - 222.90 - -
Footing F6 16 6 25 150 8.66 - - - 624.95 - -
Footing F7 16 6 23 138 7.91 - - - 525.16 - -
Footing F8 16 2 13 26 6.91 - - - 86.43 - -
Footing F9 16 4 12 48 39.00 - - - 900.61 - -

A FOUNDATION REBAR 0.00 0.00 0.00 3874.59 0.00 0.00 3874.59

B Column
1 Col C1 5 nos - - - - - - -
Bar 1 upto First Floor 25 5 4 20 25.00 - - - - - 587.35
Bar 1 upto Third Floor 20 5 4 20 27.00 - - - - 405.99 -
Bar 1 terminated 20 5 4 20 12.50 - - - - 187.96 -
Bar 2 upto Ground Floor 25 5 4 20 14.50 - - - - - 340.66
Bar 2 upto Second Floor 20 5 4 20 27.00 - - - - 405.99 -
Bar 2 terminated 16 5 4 20 22.00 - - - 211.68 - -
Bar 3 upto First Floor 20 5 2 10 25.00 - - - - 187.96 -
Bar 3 upto Third Floor 20 5 2 10 25.00 - - - - 187.96 -
Bar 3 terminated 16 5 2 10 11.50 - - - 55.33 - -
Bar 4 upto Ground Floor 20 5 2 10 14.50 - - - - 109.02 -
Bar 4 upto Second Floor 20 5 2 10 25.00 - - - - 187.96 -
Bar 4 terminated 16 5 2 10 22.00 - - - 105.84 - -
stirrup 1 8 5 123 615 4.99 369.57 - - - - -
stirrup 2 8 5 123 615 3.83 283.66 - - - - -
stirrup 3 8 5 123 615 3.83 283.66 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 2 of 2
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

2 Col C2 5 nos - - - - - - -
Bar 1 upto Ground Floor 25 5 4 20 19.00 - - - - - 446.38
Bar 1 upto Second Floor 20 5 4 20 26.00 - - - - 390.95 -
Bar 1 terminated 16 5 4 20 19.50 - - - 187.63 - -
Bar 2 upto First Floor 20 5 4 20 25.00 - - - - 375.91 -
Bar 2 upto Third Floor 16 5 4 20 25.00 - - - 240.55 - -
Bar 2 terminated 16 5 4 20 11.50 - - - 110.65 - -
Bar 3 upto Ground Floor 20 5 4 20 14.50 - - - - 218.03 -
Bar 3 upto Second Floor 20 5 4 20 25.00 - - - - 375.91 -
Bar 3 terminated 16 5 4 20 22.00 - - - 211.68 - -
stirrup 1 8 5 123 615 4.99 369.57 - - - - -
stirrup 2 8 5 123 615 3.83 283.66 - - - - -
stirrup 3 8 5 123 615 3.83 283.66 - - - - -

3 Col C3 2 nos - - - - - - -
Bar 1 upto First Floor 20 2 4 8 25.00 - - - - 150.37 -
Bar 1 upto Third Floor 16 2 4 8 24.00 - - - 92.37 - -
Bar 1 terminated 16 2 4 8 11.50 - - - 44.26 - -
Bar 2 upto Ground Floor 20 2 8 16 14.50 - - - - 174.42 -
Bar 2 upto Second Floor 16 2 8 16 24.00 - - - 184.74 - -
Bar 2 terminated 12 2 8 16 22.00 - - 95.30 - - -
stirrup 1 8 2 123 246 4.99 147.83 - - - - -
stirrup 2 8 2 123 246 3.83 113.46 - - - - -
stirrup 3 8 2 123 246 3.83 113.46 - - - - -

4 Col C3 3 nos - - - - - - -
Bar 1 upto First Floor 20 3 4 12 25.00 - - - - 225.55 -
Bar 1 terminated 16 3 4 12 22.00 - - - 127.01 - -
Bar 2 upto Ground Floor 20 3 8 24 14.50 - - - - 261.64 -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 3 of 3
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bar 2 upto Second Floor 16 3 8 24 24.00 - - - 277.11 - -
Bar 2 terminated 12 3 8 24 11.50 - - 74.72 - - -
stirrup 1 8 3 97 291 4.99 174.87 - - - - -
stirrup 2 8 3 97 291 3.83 134.22 - - - - -
stirrup 3 8 3 97 291 3.83 134.22 - - - - -

B TOTAL COLUMN REBAR 2691.85 0.00 170.02 1848.86 3845.61 1374.39 9930.72

C STAIRCASE
C1 StairCase at Ground Floor
1 Flight 1
main bar 12 1 9 9 22.41 - - 54.60 - - -
12 1 9 9 9.41 - - 22.93 - - -
12 1 9 9 10.66 - - 25.97 - - -
distribution bar 8 1 24 24 4.50 13.01 - - - - -
distribution bar 8 1 14 14 4.50 7.59 - - - - -
distribution bar 8 1 6 6 4.50 3.25 - - - - -
nosing bar 10 1 9 9 4.50 - 7.62 - - - -
step bars 8 9 4 36 2.66 11.53 - - - - -

2 Landing - - - - - - - -
main bar at gap 12 2 2 4 6.91 - - 7.48 - - -
distribution bar 10 2 13 26 12.41 - 60.70 - - - -

3 Flight 2
main bar 12 1 9 9 23.66 - - 57.65 - - -
12 1 9 9 10.66 - - 25.97 - - -
12 1 9 9 10.66 - - 25.97 - - -
distribution bar 8 1 25 25 4.50 13.55 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 4 of 4
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
distribution bar 8 1 6 6 4.50 3.25 - - - - -
distribution bar 8 1 15 15 4.50 8.13 - - - - -
nosing bar 10 1 9 9 4.50 - 7.62 - - - -
step bars 8 9 4 36 2.66 11.53 - - - - -

Sub Total for Staircase at Ground Floor 71.84 75.93 220.59 0.00 0.00 0.00

Staircase for first and second floor 2 143.67 151.86 441.17 0.00 0.00 0.00
C TOTAL for STAIRCASE 215.51 227.80 661.76 0.00 0.00 0.00 1105.07
- - - - - - - -
D BEAMS
D.1 Footing and Plinth Beam at lvl -0'-0" - - - - - - - -
1 at A-A - - - - - - - -
Bottom bars 12 2 2 4 32.50 - - 35.20 - - -
Top Bars 12 2 2 4 32.50 - - 35.20 - - -
Stirrups 8 2 52 104 2.99 37.45 - - - - -

2 at B-B, C-C & D-D - - - - - - - -


Bottom bars 12 6 2 12 42.50 - - 138.07 - - -
ld 16 6 2 12 2.25 - - - 12.99 - -
Top Bars 12 6 2 12 42.50 - - 138.07 - - -
ld 12 6 2 12 2.25 - - 7.31 - - -
Stirrups 8 6 72 432 2.99 155.55 - - - - -

3 at 1-1 - - - - - - - -
Bottom bars 12 2 2 4 30.50 - - 33.03 - - -
Top Bars 12 2 2 4 30.50 - - 33.03 - - -
Stirrups 8 2 48 96 2.99 34.57 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 5 of 5
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
4 at 2-2,3-3 & 4-4 - - - - - - - -
Bottom bars 12 6 2 12 46.50 - - 151.07 - - -
ld 16 6 2 12 2.25 - - - 12.99 - -
Top Bars 12 6 2 12 46.50 - - 151.07 - - -
ld 12 6 2 12 2.25 - - 7.31 - - -
Stirrups 8 6 80 480 2.99 172.84 - - - - -

D.2 BEAM at GF lvl +10'-0" - - - - - - - -


1 Grid A-A - - - - - - - -
Bottom bars 20 1 2 2 35.50 - - - - 53.38 -
Top Bars 20 1 2 2 35.50 - - - - 53.38 -
extra top bars at 4 20 1 1 1 7.25 - - - - 5.45 -
at 3 20 1 1 1 11.49 - - - - 8.64 -
at 2 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 70 70 4.99 42.07 - - - - -

2 Beam B-B - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 6 of 6
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

3 Beam C-C - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

4 Beam D-D - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 25 1 2 2 8.75 - - - - - 20.56
at B 25 1 2 2 10.33 - - - - - 24.27
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 7 of 7
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

5 Grid 1-1 - - - - - - - -
Bottom bars 20 1 2 2 33.50 - - - - 50.37 -
Top Bars 20 1 2 2 33.50 - - - - 50.37 -
extra top bars at B 20 1 1 1 6.91 - - - - 5.20 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 66 66 4.99 39.66 - - - - -

6 Beam 2-2/4-4 - - - - - - - -
Bottom bars 16 2 3 6 48.00 - - - 138.56 - -
ld 16 2 3 6 3.00 - - - 8.66 - -
Top Bars 20 2 2 4 49.50 - - - - 148.86 -
ld 20 2 2 4 3.75 - - - - 11.28 -
extra top bars at A 20 2 1 2 8.91 - - - - 13.40 -
at B 20 2 2 4 9.49 - - - - 28.54 -
at C 20 2 1 2 9.49 - - - - 14.27 -
at D 20 2 2 4 8.91 - - - - 26.80 -
Stirrups 8 2 101 202 4.17 101.44 - - - - -

7 Beam 3-3 - - - - - - - -
Bottom bars 16 1 3 3 48.00 - - - 69.28 - -
ld 16 1 3 3 3.00 - - - 4.33 - -
Top Bars 20 1 2 2 49.50 - - - - 74.43 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra top bars at A 20 1 1 1 8.91 - - - - 6.70 -
at B 20 1 2 2 9.49 - - - - 14.27 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 8.91 - - - - 13.40 -
Stirrups 8 1 101 101 4.17 50.72 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 8 of 8
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

D.3 Lintel and sill Beam at lvl +10'-0" - - - - - - - -


1 at A-A - - - - - - - -
Bottom bars 10 2 2 4 32.50 - 24.45 - - - -
Stirrups 8 2 52 104 1.24 15.53 - - - - -

2 at B-B & C-C - - - - - - - -


Bottom bars 10 4 2 8 32.50 - 48.91 - - - -
ld 10 4 2 8 2.25 - 3.39 - - - -
Stirrups 8 4 52 208 1.24 31.06 - - - - -

3 at D-D - - - - - - - -
Bottom bars 10 2 2 4 42.50 - 31.98 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 72 144 1.24 21.50 - - - - -

4 at 1-1 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
Stirrups 8 2 28 56 1.24 8.36 - - - - -

5 at 2-2 - - - - - - - -
Bottom bars 10 2 2 4 46.50 - 34.99 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 80 160 1.24 23.89 - - - - -

6 at 3-3 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 28 56 0.99 6.68 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 9 of 9
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
7 at 4-4 - - - - - - - -
Bottom bars 10 2 2 4 52.50 - 39.50 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 92 184 1.24 27.48 - - - - -

D.4 BEAM at GF lvl +21'-0" - - - - - - - -


1 Grid A-A - - - - - - - -
Bottom bars 20 1 2 2 35.50 - - - - 53.38 -
Top Bars 20 1 2 2 35.50 - - - - 53.38 -
extra top bars at 4 20 1 1 1 7.25 - - - - 5.45 -
at 3 20 1 1 1 11.49 - - - - 8.64 -
at 2 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 70 70 4.99 42.07 - - - - -

2 Beam B-B - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

3 Beam C-C - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 10 of 10
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

4 Beam D-D - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 25 1 2 2 8.75 - - - - - 20.56
at B 25 1 2 2 10.33 - - - - - 24.27
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

5 Grid 1-1 - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 11 of 11
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bottom bars 20 1 2 2 33.50 - - - - 50.37 -
Top Bars 20 1 2 2 33.50 - - - - 50.37 -
extra top bars at B 20 1 1 1 6.91 - - - - 5.20 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 66 66 4.99 39.66 - - - - -

6 Beam 2-2/4-4 - - - - - - - -
Bottom bars 16 2 3 6 48.00 - - - 138.56 - -
ld 16 2 3 6 3.00 - - - 8.66 - -
Top Bars 20 2 2 4 49.50 - - - - 148.86 -
ld 20 2 2 4 3.75 - - - - 11.28 -
extra top bars at A 20 2 1 2 8.91 - - - - 13.40 -
at B 20 2 2 4 9.49 - - - - 28.54 -
at C 20 2 1 2 9.49 - - - - 14.27 -
at D 20 2 2 4 8.91 - - - - 26.80 -
Stirrups 8 2 101 202 4.17 101.44 - - - - -

7 Beam 3-3 - - - - - - - -
Bottom bars 16 1 3 3 52.00 - - - 75.05 - -
ld 16 1 3 3 3.00 - - - 4.33 - -
Top Bars 20 1 2 2 53.50 - - - - 80.45 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra top bars at A 20 1 1 1 10.33 - - - - 7.77 -
at B 20 1 2 2 9.49 - - - - 14.27 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 8.91 - - - - 13.40 -
Stirrups 8 1 101 101 4.17 50.72 - - - - -

D.5 Lintel and sill Beam at lvl +21'-0" - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 12 of 12
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
1 at A-A - - - - - - - -
Bottom bars 10 2 2 4 32.50 - 24.45 - - - -
Stirrups 8 2 52 104 1.24 15.53 - - - - -

2 at B-B & C-C - - - - - - - -


Bottom bars 10 4 2 8 32.50 - 48.91 - - - -
ld 10 4 2 8 2.25 - 3.39 - - - -
Stirrups 8 4 52 208 1.24 31.06 - - - - -

3 at D-D - - - - - - - -
Bottom bars 10 2 2 4 42.50 - 31.98 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 72 144 1.24 21.50 - - - - -

4 at 1-1 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
Stirrups 8 2 28 56 1.24 8.36 - - - - -

5 at 2-2 - - - - - - - -
Bottom bars 10 2 2 4 46.50 - 34.99 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 80 160 1.24 23.89 - - - - -

6 at 3-3 - - - - - - - -
Bottom bars 10 2 2 4 14.50 - 10.91 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 16 32 0.99 3.82 - - - - -

7 at 4-4 - - - - - - - -
Bottom bars 10 2 2 4 52.50 - 39.50 - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 13 of 13
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 92 184 1.24 27.48 - - - - -

D.6 BEAM at GF lvl +31'-6" - - - - - - - -


1 Grid A-A - - - - - - - -
Bottom bars 16 1 2 2 34.00 - - - 32.71 - -
Bottom bars 12 1 1 1 33.00 - - 8.93 - - -
Top Bars 16 1 2 2 34.00 - - - 32.71 - -
extra top bars at 4 20 1 1 1 7.25 - - - - 5.45 -
at 3 20 1 1 1 11.49 - - - - 8.64 -
at 2 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 70 70 4.99 42.07 - - - - -

2 Beam B-B - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 1 1 43.00 - - 11.64 - - -
ld 12 1 1 1 2.50 - - 0.68 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 1 1 7.00 - - - 3.37 - -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 16 1 1 1 7.16 - - - 3.44 - -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

3 Beam C-C - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 2 2 43.00 - - 23.28 - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 14 of 14
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
ld 12 1 2 2 2.50 - - 1.35 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 2 2 7.00 - - - 6.74 - -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 16 1 2 2 7.16 - - - 6.89 - -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

4 Beam D-D - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 2 2 43.00 - - 23.28 - - -
ld 12 1 2 2 2.50 - - 1.35 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

5 Grid 1-1 - - - - - - - -
Bottom bars 16 1 2 2 32.00 - - - 30.79 - -
Bottom bars 12 1 1 1 31.00 - - 8.39 - - -
Top Bars 16 1 2 2 32.00 - - - 30.79 - -
extra top bars at B 20 1 1 1 6.91 - - - - 5.20 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 9.25 - - - - 13.91 -
Stirrups 8 1 66 66 4.99 39.66 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 15 of 15
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

6 Beam 2-2/4-4 - - - - - - - -
Bottom bars 16 2 2 4 48.00 - - - 92.37 - -
ld 16 2 2 4 3.00 - - - 5.77 - -
Bottom bars 12 2 1 2 47.00 - - 25.45 - - -
ld 12 2 1 2 2.50 - - 1.35 - - -
Top Bars 16 2 2 4 48.00 - - - 92.37 - -
ld 16 2 2 4 3.00 - - - 5.77 - -
extra top bars at A 16 2 1 2 8.16 - - - 7.85 - -
at B 20 2 1 2 9.49 - - - - 14.27 -
at C 20 2 1 2 9.49 - - - - 14.27 -
at D 20 2 2 4 8.91 - - - - 26.80 -
Stirrups 8 2 101 202 4.17 101.44 - - - - -

7 Beam 3-3 - - - - - - - -
Bottom bars 16 1 2 2 52.00 - - - 50.03 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 1 1 51.50 - - 13.94 - - -
ld 12 1 1 1 2.50 - - 0.68 - - -
Top Bars 16 1 2 2 52.00 - - - 50.03 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 1 1 10.33 - - - 4.97 - -
at B 20 1 1 1 9.49 - - - - 7.13 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 8.91 - - - - 13.40 -
Stirrups 8 1 101 101 4.17 50.72 - - - - -

D.7 Lintel and sill Beam at lvl +31'-6" - - - - - - - -


1 at A-A - - - - - - - -
Bottom bars 10 2 2 4 32.50 - 24.45 - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 16 of 16
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Stirrups 8 2 52 104 1.24 15.53 - - - - -

2 at B-B & C-C - - - - - - - -


Bottom bars 10 4 2 8 32.50 - 48.91 - - - -
ld 10 4 2 8 2.25 - 3.39 - - - -
Stirrups 8 4 52 208 1.24 31.06 - - - - -

3 at D-D - - - - - - - -
Bottom bars 10 2 2 4 42.50 - 31.98 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 72 144 1.24 21.50 - - - - -

4 at 1-1 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
Stirrups 8 2 28 56 1.24 8.36 - - - - -

5 at 2-2 - - - - - - - -
Bottom bars 10 2 2 4 46.50 - 34.99 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 80 160 1.24 23.89 - - - - -

6 at 4-4 - - - - - - - -
Bottom bars 10 2 2 4 52.50 - 39.50 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 92 184 1.24 27.48 - - - - -

D.8 BEAM at GF lvl +42'-0" - - - - - - - -


1 Beam B-B - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 17 of 17
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bottom bars 12 1 1 1 43.00 - - 11.64 - - -
ld 12 1 1 1 2.50 - - 0.68 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 1 1 7.00 - - - 3.37 - -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 16 1 1 1 7.16 - - - 3.44 - -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

2 Beam C-C - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 2 2 43.00 - - 23.28 - - -
ld 12 1 2 2 2.50 - - 1.35 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 2 2 7.00 - - - 6.74 - -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 16 1 2 2 7.16 - - - 6.89 - -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

3 Beam D-D - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 2 2 43.00 - - 23.28 - - -
ld 12 1 2 2 2.50 - - 1.35 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 18 of 18
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
extra top bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

4 Grid 1-1 - - - - - - - -
Bottom bars 16 1 2 2 32.00 - - - 30.79 - -
Bottom bars 12 1 1 1 31.00 - - 8.39 - - -
Top Bars 16 1 2 2 32.00 - - - 30.79 - -
extra top bars at B 20 1 1 1 6.91 - - - - 5.20 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 9.25 - - - - 13.91 -
Stirrups 8 1 66 66 4.99 39.66 - - - - -

5 Beam 2-2/4-4 - - - - - - - -
Bottom bars 16 2 2 4 32.00 - - - 61.58 - -
Bottom bars 12 2 1 2 31.00 - - 16.79 - - -
Top Bars 16 2 2 4 32.00 - - - 61.58 - -
ld 16 2 2 4 3.00 - - - 5.77 - -
extra top bars at B 20 2 1 2 8.91 - - - - 13.40 -
at C 20 2 1 2 9.49 - - - - 14.27 -
at D 20 2 2 4 8.91 - - - - 26.80 -
Stirrups 8 2 59 118 4.17 59.26 - - - - -

6 Beam 3-3 - - - - - - - -
Bottom bars 16 1 2 2 32.00 - - - 30.79 - -
Bottom bars 12 1 1 1 31.50 - - 8.53 - - -
Top Bars 16 1 2 2 32.00 - - - 30.79 - -
extra top bars at A 20 1 1 1 8.91 - - - - 6.70 -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 19 of 19
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 8.91 - - - - 13.40 -
Stirrups 8 1 59 59 4.17 29.63 - - - - -

D.9 Lintel and sill Beam at lvl +42'-0" - - - - - - - -


1 at B-B & C-C - - - - - - - -
Bottom bars 10 4 2 8 32.50 - 48.91 - - - -
ld 10 4 2 8 2.25 - 3.39 - - - -
Stirrups 8 4 52 208 1.24 31.06 - - - - -

2 at D-D - - - - - - - -
Bottom bars 10 2 2 4 42.50 - 31.98 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 72 144 1.24 21.50 - - - - -

3 at 1-1 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
Stirrups 8 2 28 56 1.24 8.36 - - - - -

4 at 2-2 - - - - - - - -
Bottom bars 10 2 2 4 30.50 - 22.95 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 48 96 1.24 14.34 - - - - -

5 at 4-4 - - - - - - - -
Bottom bars 10 2 2 4 36.50 - 27.46 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 60 120 1.24 17.92 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 20 of 20
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
D TOTAL for BEAM 2266.14 796.08 944.99 1751.01 2939.24 89.65 8787.11

E SLABS
E1 SLAB at level 0'-0" - - - - - - - -
1 S1 9'6"x7'6" 1 nos - - - - - - -
main bars- Longitudinal 8 1 13 13 10.17 15.92 - - - - -
main bars- Transverse 8 1 16 16 8.17 15.74 - - - - -
Top Bars- Longitudinal 8 2 16 32 4.83 18.63 - - - - -
Top Bars- Transverse 8 2 16 32 4.17 16.06 - - - - -
Top Binders-Longitudinal 8 2 8 16 10.17 19.59 - - - - -
Top Binders-Transverse 8 2 10 20 8.17 19.67 - - - - -

2 Circular Projections 4 nos - - - - - - -


main bars- Top 10 4 64 256 6.50 - 313.01 - - - -
main bars- Bottom 10 4 32 128 6.50 - 156.51 - - - -
binders- Top 10 4 13 52 25.75 - 251.88 - - - -
binders- Bottom 10 4 13 52 25.75 - 251.88 - - - -
Cantilever Projection
main bars- Top 10 2 390 780 5.00 - 733.63 - - - -
main bars- Bottom 10 2 195 390 5.00 - 366.81 - - - -
Distribution 10 4 10 40 195.00 - 1467.26 - - - -

3 S1 10'x16' 3 nos - - - - - - -
main bars 10 3 12 36 30.57 - 207.02 - - - -
10 3 12 36 21.42 - 145.06 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
distribution bars 10 3 25 75 20.74 - 292.60 - - - -
10 3 25 75 15.42 - 217.55 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
extra bars 8 6 8 48 10.00 57.80 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 21 of 21
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

E2 SLAB at level 21'-0" - - - - - - - -


1 S1 16'x12' 2 nos - - - - - - -
main bars 10 2 20 40 26.57 - 199.92 - - - -
10 2 20 40 17.42 - 131.07 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 19 38 26.74 - 191.14 - - - -
10 2 19 38 21.42 - 153.11 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

2 S1 16'x16' 2 nos - - - - - - -
main bars 10 2 20 40 30.57 - 230.02 - - - -
10 2 20 40 21.42 - 161.17 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 25 50 26.74 - 251.50 - - - -
10 2 25 50 21.42 - 201.47 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

3 S1 10'x16' 3 nos - - - - - - -
main bars 10 3 12 36 30.57 - 207.02 - - - -
10 3 12 36 21.42 - 145.06 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
distribution bars 10 3 25 75 20.74 - 292.60 - - - -
10 3 25 75 15.42 - 217.55 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
extra bars 8 6 8 48 10.00 57.80 - - - - -

E3 SLAB at level 31'-6" - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 22 of 22
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
1 S1 16'x12' 2 nos - - - - - - -
main bars 10 2 20 40 26.57 - 199.92 - - - -
10 2 20 40 17.42 - 131.07 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 19 38 26.74 - 191.14 - - - -
10 2 19 38 21.42 - 153.11 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

2 S1 16'x16' 2 nos - - - - - - -
main bars 10 2 20 40 30.57 - 230.02 - - - -
10 2 20 40 21.42 - 161.17 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 25 50 26.74 - 251.50 - - - -
10 2 25 50 21.42 - 201.47 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

3 S1 10'x16' 3 nos - - - - - - -
main bars 10 3 12 36 30.57 - 207.02 - - - -
10 3 12 36 21.42 - 145.06 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
distribution bars 10 3 25 75 20.74 - 292.60 - - - -
10 3 25 75 15.42 - 217.55 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
extra bars 8 6 8 48 10.00 57.80 - - - - -

E4 SLAB at level 42'-0" - - - - - - - -


1 S1 16'x12' 1 nos - - - - - - -
main bars 10 1 20 20 26.57 - 99.96 - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 23 of 23
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
10 1 20 20 17.42 - 65.54 - - - -
binders 8 2 6 12 8.00 11.56 - - - - -
distribution bars 10 1 19 19 26.74 - 95.57 - - - -
10 1 19 19 21.42 - 76.56 - - - -
binders 8 2 6 12 8.00 11.56 - - - - -
extra bars 8 2 8 16 16.00 30.83 - - - - -

2 S1 16'x16' 1 nos - - - - - - -
main bars 10 1 20 20 30.57 - 115.01 - - - -
10 1 20 20 21.42 - 80.59 - - - -
binders 8 2 6 12 8.00 11.56 - - - - -
distribution bars 10 1 25 25 26.74 - 125.75 - - - -
10 1 25 25 21.42 - 100.73 - - - -
binders 8 2 6 12 8.00 11.56 - - - - -
extra bars 8 2 8 16 16.00 30.83 - - - - -

3 S1 10'x16' 4 nos - - - - - - -
main bars 10 4 12 48 30.57 - 276.02 - - - -
10 4 12 48 21.42 - 193.41 - - - -
binders 8 8 6 48 8.00 46.24 - - - - -
distribution bars 10 4 25 100 20.74 - 390.14 - - - -
10 4 25 100 15.42 - 290.07 - - - -
binders 8 8 6 48 8.00 46.24 - - - - -
extra bars 8 8 8 64 10.00 77.07 - - - - -

E TOTAL for SLAB 1196.18 11075.83 0.00 0.00 0.00 0.00 12272.01

TOTAL REBAR (A+B+C+D+E) 6.37 12.10 1.78 7.47 6.78 1.46 35.97

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 24 of 24
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
tonn

10 % wastage and contingencies shall be added ????? 39.57 mt

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 25 of 25
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION B


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
A Water Tank of Capacity 20000 ltrs
Base
1 Bottom Bars along long wall 10 1 32 32 15.00 - 90.29 - - - -
along short wall 10 1 22 22 20.00 - 82.77 - - - -

1 Top Bars along long wall 10 1 24 24 15.00 - 67.72 - - - -


along short wall 10 1 17 17 20.00 - 63.96 - - - -

3 Vertical Bars along long wall 10 4 32 128 9.00 - 216.70 - - - -


along short wall 10 4 22 88 9.00 - 148.98 - - - -
Binders 8 2 11 22 112.00 296.73 - - - - -

Slab
1 Bottom Bars along long wall 10 2 32 64 15.00 - 180.59 - - - -
along short wall 10 2 22 44 20.00 - 165.54 - - - -

E TOTAL for SLAB 296.73 1016.55 0.00 0.00 0.00 0.00 1313.28

Septic tank slab


1 Bottom Bars along long wall 10 2 24 48 12.00 - 108.35 - - - -
along short wall 10 2 16 32 16.00 - 96.31 - - - -

E TOTAL for SLAB 0.00 204.66 0.00 0.00 0.00 0.00 204.66

10 % contingencies shall be added

Prepared By: Checked/ Forwarded By: Approved By: .


Weight in kg.
8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Total
block A 6.37 12.10 1.78 7.47 6.78 1.46 35.97
block B #REF! #REF! #REF! #REF! #REF! #REF! #REF!
block C #REF! #REF! #REF! #REF! #REF! #REF! #REF!
block D #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Grand Total #REF! mts.

#REF! kgs