ENGINEERING OVERVIEW OF THE MANUAL
Issue 1
MANUAL
PROPRIETARY INFORMATION - For Authorised Company Use Only July 1996

CHAPTER 1

OVERVIEW OF THE MANUAL


TABLE OF CONTENTS

1.1 PURPOSE ...................................................................................................................................... 3

1.2 SCOPE ........................................................................................................................................... 3

1.3 DRILLING ENGINEERING MANUAL STRUCTURE .............................................................. 4

1.4 TERMINOLOGY .......................................................................................................................... 5

1.5 MANUAL CONTROL .................................................................................................................. 5

1.6 REVISION ..................................................................................................................................... 6

DRILLING DEPARTMENT
PETRONAS CARIGALI SDN BHD
DEM 1

DRILLING Page 2 of 6
ENGINEERING OVERVIEW OF THE MANUAL
Issue 1
MANUAL
PROPRIETARY INFORMATION - For Authorised Company Use Only July 1996

This page is intentionally blank.

DRILLING DEPARTMENT
PETRONAS CARIGALI SDN BHD
DEM 1

DRILLING Page 3 of 6
ENGINEERING OVERVIEW OF THE MANUAL
Issue 1
MANUAL
PROPRIETARY INFORMATION - For Authorised Company Use Only July 1996

1.1 PURPOSE
The Drilling Engineering Manual (DEM) is on the second level in a hierarchical system of
manuals which documents the Drilling Management System. The first level document is
the Drilling Management Manual (DMM), the documents on the third level are the Well
Design Manual (WDM) and the Drilling Operations Manual (DOM).
The purpose of the Drilling Engineering Manual is to:
• Provide detailed mapping of the driver and support processes performed by Drilling
during the process management cycle. This cycle results in the planning and
scheduling, implementation, analysis and improvement stages of Drilling activities.
• Illustrate the individual activities and tasks which form part of the processes.
• Detail the interfaces with other processes.
• Illustrate the activity flows, interfaces, responsibilities and routines undertaken to
ensure optimised performance of the processes.
• Provide timings for the tasks to ensure efficiency of the process.
• Emphasise the importance of performance monitoring, analysis, improvement and
feedback. Document the embedding of these activities into the routine conduct of all
processes, activities and tasks.
Non-core activities, such as administrative duties, are not covered in this document.
However, it is important that the closed-loop quality management system is applied to all
activities undertaken by Drilling personnel.

1.2 SCOPE
The contents of this manual shall be applied by all Drilling personnel for drilling activities
in Malaysia.
This manual describes the processes and tasks, not the detailed engineering considerations
and procedures. These are described in the following documents:
! Well Design Manual.
! Drilling Operations Manual.

DRILLING DEPARTMENT
PETRONAS CARIGALI SDN BHD
DEM 1

DRILLING Page 4 of 6
ENGINEERING OVERVIEW OF THE MANUAL
Issue 1
MANUAL
PROPRIETARY INFORMATION - For Authorised Company Use Only July 1996

1.3 DRILLING ENGINEERING MANUAL STRUCTURE


The manual is structured in the following chapters:
Chapter 1 Introduces the manual, explains its purpose and scope, how to use it
Overview of the and how it will be updated.
Manual

"
Chapter 2 Describes the well planning processes and the associated activities.
Planning and These cover the early stages prior to conceptual design through to
Scheduling the approved Notice of Operation. (For detailed engineering
considerations and procedures refer to the Well Design Manual).
"
Chapter 3 Covers the execution of the plan and the interfaces between field
Implementation operations and office based control activities. (For detailed
operational considerations and procedures refer to the Drilling
Operations Manual).
"
Chapter 4 Describes the examination of data reported during the planning and
Analysis implementation stages.

"
Chapter 5 Describes the feedback loop that identifies, evaluates and
Improvement implements improvements to processes and documentation.

DRILLING DEPARTMENT
PETRONAS CARIGALI SDN BHD
DEM 1

DRILLING Page 5 of 6
ENGINEERING OVERVIEW OF THE MANUAL
Issue 1
MANUAL
PROPRIETARY INFORMATION - For Authorised Company Use Only July 1996

1.4 TERMINOLOGY
The following abbreviations are used in the documentation of the DQMS:
AFE Authorisation For Expenditure GOR Gas Oil Ratio
API American Petroleum Institute HSE Health, Safety and Environment
BCWP Basis for Completion/Workover IADC International Association of
Design Drilling Contractors
BDP Basis for Drilling Plan KPI Key Performance Indicator
BFD Basis for Design LOT Leak Off Test
BHA Bottom Hole Assembly LTI Lost Time Incident
BWD Basis for Well Design LTIFR Lost Time Incident Frequency
CWPHA Completion/Workover Rate
Programme Hazard Assessment MTC Major Tender Committee
DDM Daily Drilling Meeting NOOP Notice of Operation
DDR Drilling Manager NPT Non-productive Time
DEM Drilling Engineering Manual P&A Plug and Abandon
DIMS Drilling Information PDO Procedures for Drilling
Management System Operations
DMM Drilling Management Manual PE Petroleum Engineering
DMS Drilling Management System QA Quality Assurance
DOM Drilling Operations Manual QC Quality Control
DPEP Drilling Project Execution Plan ROP Rate of Penetration
DS Drilling Supervisor RPM Revolutions per Minute
DT Drilling Team RS Rig Superintendent
DTL Drilling Team Leader SIPROD Simultaneous Production and
DWD Detailed Well Design Drilling
EIA Environmental Impact TD Total Depth
Assessment TOR Terms of Reference
EWR End of Well Report WDM Well Design Manual
FDP Field Development Plan WIMS Well Information Management
FIT Formation Integrity Test System
GM General Manager WOB Weight on Bit
1.5 MANUAL CONTROL
Controlled copies of the manual shall be distributed to the manual holders listed on the
control page. The manual owner is also responsible for the distribution and registration of
any uncontrolled copies
All Drilling personnel must be familiar with the contents of this manual. They must apply
the contents and ensure that other stakeholders understand their responsibilities.

DRILLING DEPARTMENT
PETRONAS CARIGALI SDN BHD
DEM 1

DRILLING Page 6 of 6
ENGINEERING OVERVIEW OF THE MANUAL
Issue 1
MANUAL
PROPRIETARY INFORMATION - For Authorised Company Use Only July 1996

1.6 REVISION
All readers are encouraged to submit suggestions for revisions to this manual and the
Drilling Management System. Suggestions must be submitted in writing to the manual
owner, the Drilling Manager, through the Suggestions for Improvement system.
# DEM, Chapter 5.2, Implement Change.
Suggestions for Improvement must include the following:
• Background to the proposed revision.
• Objective of the proposed revision.
• Draft of the proposed revision.
• The advantages and disadvantages of the proposed revision.
All suggestions must be screened and assessed by the manual owner. The owner is
responsible for incorporating agreed, approved updates in future revisions of the manual.

DRILLING DEPARTMENT
PETRONAS CARIGALI SDN BHD

You might also like