FLOW PROCESS CHART

Location: Bogor Summary


Activity: Producing pasta Event Present Proposed Savings
Date: 16 Mei 2019 Operation 10
Operator: Sherly Analyst: Dewi Transport 6
Circle appriate Method and Type: Delay 2
Metode : Present Proposed Inspection 4
Type : Worker Material Mechine Storage 1
Remarks: Time (min) 300
Distance (ft)
Cost
waktu Jarak
Deskripsi Kegiatan Simbol Methode Recomendation
(Menit) (Ft)
Penerimaan
Pemeriksaan/Inspeksi
Persiapan
Penimbangan
Pencampuran
Inspeksi
Ke Ruang Pendiaman
Pendiaman
Ke Ruang Pencetakan
Pencetakan
Pengukusan
Ke Ruang Pengeringan
Pengeringan
Inspeksi
Ke Ruang
Penyimpanan
Pendiaman
Ke Ruang Pengemasan
Pengemasan Primer
Pemasukan Saus
Pengemasan Sekunder
dan Tersier
Ke Ruang
penyimpanan Finish
Good
Inspeksi
FLOW PROCESS CHART
Location: Bogor Summary
Activity: Producing Saos Event Present Proposed Savings
Date: 16 Mei 2019 Operation 7
Operator: Anita Analyst: Trisya Transport 3
Circle appriate Method and Type: Delay
Metode : Present Proposed Inspection 2
Type : Worker Material Mechine Storage
Remarks: Time (min)
Distance (ft)
Cost
waktu Jarak
Deskripsi Kegiatan Simbol Methode Recomendation
(Menit) (Ft)
Penerimaan
Pemeriksaan/Inspeksi
Persiapan
Penimbangan
Pengupasan &
Pemotongan
Ke Ruang Pemasakan
Penumisan
Perebusan
Penirisan
Inspeksi
Pengemasan Primer
Ke Ruang Pengemasan
Pasta