You are on page 1of 1

STANDARD OPERATING PROCEDURE

1. Objective
To define the procedure for Dissolution Test Apparatus

2. Scope

This procedure is applicable to clean, calibrate and operate 6- Station Dissolution


Apparatus

3. Responsibility
Executive Quality Control

4. Accountability
Head Quality Control

5. Procedure
5.1. Check water level in the water bath.
5.2. Fill water into the beakers up to the required mark.
5.3. Switch ‘ON’ main power supply and the “Mains” of the equipment.
5.4. Operate the equipment as per operating procedure No SPL/SOP/QC/020
5.5. Start the Instrument and check the following parameter.
5.6. RPM at 50 and 100. The tolerance shall be within ± 4% RPM
5.7. Temperature water bath 37°C .The temperature shall be 36.5-37.5 °C.
5.8. Timer 60 min. The tolerance shall be within ±1 min
5.9. After completing the calibration and record the observation in and get it checked by QC
Officer and approved by QC Head.
5.10. Perform wobble test using paddle and basket assembly. The tolerance shall be ±1.0
mm for basket and ±0.5 mm for paddle.
5.11. Perform Depth test using paddle and basket assembly. The tolerance shall be 25 ±2.0
mm for basket and paddle.
5.12. Operate the equipment as per operating procedure No SPL/SOP/QC/020 and Perform
the dissolution test on prednisone calibrator tablet.

You might also like