Inspection report – NYANGUMI II

Attended:-
No. Names Company Designation
1. Hisham M Ali SECO P. Coordinator
2. Otto Mitimingi KPA Shift Engineer
3. Salim Brek Mohamed KPA Deck
4. Micheal Toitok KPA Tug In charge
5. Willis Abongo KPA Junior Engine Room Tech.
6. John Malasi SECO Electrical
7. Jesse Onyara KPA Electrical
8. Kalawa Clinton ALPHA Legal Department
9. Nancy David DCI DCI
10. Balesa Obed DCI DCI
11. Simon Kemboi DCI DCI
12. Amit Mudalias SECO HVAC Eng.
13. Stephen Macharia SECO Fabrication Sup
14. Matthew Bilo SECO Plumbing Sup
15. Muuna SECO Fabrication HOD

Observations
I. Exhaust pipes from outside has holes and are worn out for the main engine. May need
repair and most likely replacement for both STBD and Port Side.
II. STBD Life raft is broken. Needs replacement.
III. Compass Binnacle (Fibre made) is broken.
IV. Portside and STBD aft ripped off D- Fender.
V. Propeller Port Side damaged on 2 blades on the leading edge.

Inspection Report 1/3 Monday, March 25, 2019


Figure 1: Leading edge blade on Port side is bent.
Figure 2: Leading edge of the second blade is also bent.

Figure 3: STBD Side exhaust pipe has holes and is worn out.
Figure 4: Compass binnacle is broken.

Inspection Report 2/3 Monday, March 25, 2019


Figure 5: Life Raft on the Port Side is broken needs
replacement. Figure 6: Ripped of aft D - Fender.

Inspection Report 3/3 Monday, March 25, 2019