(4) CC Pavement 0%
B- New 2-lane
realignment/
bypass
(1) Earthwork up to top 6.73%
of the sub-grade
(2) Granular work (sub- 7.92%
base, base, shoulders)
C- New culverts,
minor bridges,
underpasses,
overpasses on
existing road,
realignments,
bypasses:
Item Weightage in Stage for Payment Percentage
percentage to the weightage to
Contract Price Particular
item(col.2)
1 2 3 4
(1) Culverts 5.79%
(2) Minor bridges 0%
(b) Overpass. 0%
(1)Foundation 0%
(2)Sub-structure 0%
(3)Super-structure 0%
(including crash
barriers etc. complete)
B-Widening and
Rehabilitation /repair
of
(a) ROB 0%
(b) RUB 0%
(1) Foundation 0%
(2) Sub-structure 0%
(3) Super-structure 0%
(including crash
barriers etc.
complete)
D-New rail-road
bridges
(a) ROB 0%
(b) RUB 0%
Item Weightage in Stage for Payment Percentage
percentage to the weightage to
Contract Price Particular
item(col.2)
1 2 3 4
Structures (elevated 0% (1) Foundation 0%
sections, reinforced (2) Sub-structure 0%
earth)
(3) Super-structure 0%
(including crash
barriers etc.
complete)
(4) Reinforced Earth 0%
Other engineering 16.27% (i)Service roads 0.00%
works (ii)Toll Plaza 1 no
including CC
Pavement, barrier 18.31%
gates, High mast
Lighting overhead sign
boards and
administrative building
(iv)Road signs,
markings, km stones, 8.0%
safety devices.
(vi)Project facilities
a) Bus bay 7.76%
b) Bus shelter 0.72%
c) Truck lay bye 0.96%
d) Rest Area including
fresh rooms, Kiosks, 0.33%
etc.
e) Weigh Bridge 0.29%
Others
(a) Street lightning 0.17%
system at Four Lane,
bus bay locations, rest
area, etc.
b) Pedestrian Guard 6.63%
Rail
(vi)Repairs and 0.13%
Rehabilitation of
Culverts.
(vii)Road side 0%
plantation
(viii)Repair of 0%
protection works
Item Weightage in Stage for Payment Percentage
percentage to the weightage to
Contract Price Particular
item(col.2)
1 2 3 4
(ix)Safety and traffic 0%
management during
construction
(x) Junctions and cross 15.01%
rods
* The above list is illustrative and may require modification as per the scope of the work.
1.3.1 Road works including approaches to minor bridges, Major Bridges and Structures (excluding
service roads).
Procedure for estimating the value of road work done shall be as follows:
Table 1.3.1
(4) CC Road 0%
(5) Widening and reconstruction 4.85% Cost of ten completed culverts shall be
of culverts determined pro rate with respect to the
total number of culverts. Payment
shall be made on the completion of ten
culverts.
(6) Widening and reconstruction 2.61% Cost of each minor bridge shall be
of minor bridges determined on pro rata basis with
respect to the total linear length of the
minor bridges. Payment shall be made
on the completion of a minor bridge.
(1) Earthwork up to top of the sub- 6.73% Unit of measurement is linear length.
grade Payment of each stage shall be made
(2) Granular work (sub-base, 7.92% on pro rata basis on completion of a
base, shoulders) stage in full length or 5 (five) km
(3) Bituminous work 0% length.
(4) CC Pavement 31.45%
@ For example, if the total length of bituminous work to be done is 100 km, the cost per km of
bituminous work shall be determined as follows:
Cost per km = P x weightage for road work x weightage for bituminous work
X (1/L)
L = Total length in km
Similarly, the rates per km for stages (1), (2) and (4) above shall be worked out.
Procedure for estimating the value of Major Bridge works shall be as stated in table 1.3.2:
Table 1.3.2
1.3.3 Structures
Procedure for estimating the value of structure work shall be as stated in table 1.3.3:
Table 1.3.3
Stage of payment Weightage Payment procedure
Procedure for estimating the value of other engineering works done shall be as stated in table 1.3.4:
Table 1.3.4
1.2 Payment for Maintenance shall be made in quarterly installments in accordance with the
provisions of Clause 19.7.