The document lists contractors who were contracted for deserted block work on various levels and flats of a building. It details the levels and flat numbers worked on, number of masons and helpers deployed, and estimated material wastage. The largest job was undertaken by Wonderla with 18 masons and 18 helpers working on levels 9, 8 and 7 of the building totaling 70.4 flats. Smaller jobs were undertaken by Abeer, DMB and Max Gate.
The document lists contractors who were contracted for deserted block work on various levels and flats of a building. It details the levels and flat numbers worked on, number of masons and helpers deployed, and estimated material wastage. The largest job was undertaken by Wonderla with 18 masons and 18 helpers working on levels 9, 8 and 7 of the building totaling 70.4 flats. Smaller jobs were undertaken by Abeer, DMB and Max Gate.
The document lists contractors who were contracted for deserted block work on various levels and flats of a building. It details the levels and flat numbers worked on, number of masons and helpers deployed, and estimated material wastage. The largest job was undertaken by Wonderla with 18 masons and 18 helpers working on levels 9, 8 and 7 of the building totaling 70.4 flats. Smaller jobs were undertaken by Abeer, DMB and Max Gate.