You are on page 1of 3

GIFT REAL ESTATE

DAILY WORK REPORT [2 pages in total]

Date

PROJECT INFORMATION
Owner GIFT Real Estate Project Coordinator
Consultant Contractor/
Location Addis Abeba,
Description

Block Unit

Daily Work Report No[XXX-ddmmyy]


Weather Conditions (+ any adverse/unusual weather)

1 Personnel/Tradesmen/Staff on Site/daily laborer (+ No)


IN Description No IN Description No IN Description No IN Description No IN Description No
1 Project Man. 7 Ass. Bar Bender 13 19 25
2 Office Eng. 8 Carpenter 14 20 26
3 Forman 9 Ass. Carpentar 15 21 27
4 Store Keeper 10 Daily Labour 16 22 28
5 Data Collector 11 Gang Chief 17 23 29
6 Bar Bender 12 18 24 30

2 Major Equipment/Plant on Site (+ No)


IN Description No IN Description No IN Description No
3 1 Excavator MAJOR
5 WORKS
Roller (0.8 ton) EXECUTED DURING
9 THE DAY [mark <X> if work done as
OT 2 Concrete Mixer (Overtime)
6 RollerWork]
(16 ton) DESCRIPTION
10 OF

OT?
IN Unit QTY
3 Bar Cutting Machine 7 WORK(S) +11LOCATION
4 Bar Bending Machine 8 10 12
DESCRIPTION OF 11
OT?

IN Unit QTY 12
WORK(S) + LOCATION
1 reinforcement fixing for 1st 13
floor column @block E kg
14
15
2 1st floor column & shear wall
formwork fixing @ block E
16
m2
1st Basment slab formwork fixing
17
3
for block D2
18
m2
2nd Basment column reinforc. fixing
19
4
for block D2
20
kg
2nd Basment column formwor. fixing
21
5
for block D2
22
m2
23
6 Grd. Flr. column reinforcement fixing
24
at block B-2 kg
7 1st bmnt slab conc. Castin @blk B3 m3
8
9
GIFT REAL ESTATE

DAILY WORK REPORT [2 pages in total]


Date

4 MAJOR MATERIAL(S) / EQUIPMENT DELIVERED DURING THE DAY


DESCRIPTION OF DESCRIPTION OF
IN Unit QTY IN Unit QTY
MATERIAL / EQUIPMENT MATERIAL / EQUIPMENT
1 5
2 6
3 7
4 8

5 MAJOR TESTS / INSPECTIONS CONDUCTED + TEST RESULTS RECEIVED/REPORTED


TESTS / INSPECTIONS CONDUCTED TESTS RECEIVED / REPORTED
IN IN
AND RELATED DISCUSSIONS AND RELATED DISCUSSIONS
1 1
2 2
3 3
4 4
5 5

6 Work Stoppages and Reasons + Time Extension Events/Occurrences (if any)


List occurrences/events + discussion on whether these events are causes for <Time Extension Request(s)>
Stoppage
IN Description of Event/Occurrence Explanatory Notes / Comments
(mins)
1
2
3
4
5

7 Designs Changes/Drawings/Orders Received + (Contract) Correspondences Received/Sent Out

8 Major problems/ challenges + Other Important Events to be Recorded

9 Details of <Health and Safety Incidents> (including any Accidents + discussions on measures taken)

Prepared by
[Name, Position, Date] Signature

Verified by
Signature

Page 2 of 2
GIFT REAL ESTATE

DAILY WORK REPORT [2 pages in total]

Date

You might also like