DAY WORK SCHEDULES 19

DAY WORK SCHEDULES


General

1. Work shall not be executed on a day work basis except by written order of the Engineer.
Bidders shall enter basic rates for day work items in the Schedules, which rates shall apply to
any quantity of day work ordered by the Engineer. Nominal quantities have been indicated
against each item of day work, and the extended total for Day work shall be carried forward
to the Summary of Day works. Payments for day work shall not be subject to price
adjustment.

Day work Labor

2. The Contractor shall be entitled to payment in respect of the works ordered calculated at the
basis rates entered by him in the Schedule of Day work Rates: 1. Labor. The rates for labor
shall be deemed to cover all costs to the Contract or including (but not limited to) the amount
of wages paid to such labor, transportation time, over time, subsistence allowances, and any
sums paid to or on behalf of such labor for social benefits in accordance with (Country of
Borrower) law, as well as Contractor's profits and overheads.

Day work Materials

3. The Contractor shall be entitled to payment in respect of materials used for day work (except
for materials for which the cost is included in the percentage addition to labor costs as
detailed here to fore), at the rates entered by him in the Schedule of Day work Rates: 2.
Materials and shall be deemed to include overhead charges and profit as follows;

(a) The rates for materials shall be calculated on the basis of the invoiced price, freight,
insurance, handling expenses, damage, losses, etc., and shall provide for delivery to store for
stock piling at the Site.

Day work Contractor’s Equipment

4. The Contractor shall be entitled to payments in respect of Contractor’s Equipment already on


Site and employed on day work at the basic rental rates entered by him in the Schedule of
Day work Rates: 3. Contractor’s Equipment. The said rates shall be deemed to include
due and complete allowance for depreciation, interest, indemnity and insurance, repairs,
maintenance, supplies, fuel, lubricants, and other consumable, and all over head profit and
administrative costs related to the use of such equipment. The cost of drivers, operators and
assistants will be paid for separately as described under the section on Day work Labor.

5. In calculating the payment due to the Contractor’s Equipment employed on day work, only
the actual number of working hours will be eligible for payment, except that where applicable
and agreed with the Engineer, the traveling time from the part of the Site where the
Construction Plant was located when ordered by the Engineer to be employed on day work
and the time for return journey there to shall be included for payment.

Bidding Document for CONTRACT NO: Procurements of work Single Stage -Two Envelop
20 DAY WORK SCHEDULES

SCHEDULE OF DAY WORKS 1: LABOUR

Nominal Rate Amount


ITEM
DESCRIPTION UNIT
NO.
Quantity LKR LKR

1 Unskilled labour day 60

2 Bar bender day 10

3 Carpenter and Joiner day 20

4 Electrician day 20

5 Fitter day 30

6 Mason day 30

7 Mechanic day 20

8 Operator (heavy machine) day 30

9 Painter day 10

10 Pipe Layer day 60

11 Plumber day 30

12 Pneumatic Tool Operator day 30

13 Steel Work Erector day 10

14 Tiller day 30

15 Welder day 20

Total for Day works Labor:

(Carried forward to Day works Summary on Page 23)

Single Stage -Two Envelop Procurements of work Bidding Document CONTRACT NO:
DAY WORK SCHEDULES 21

SCHEDULE OF DAY WORKS 2: MATERIALS

Nominal Rate Amount


DESCRIPTION UNIT
ITEM
LKR LKR
NO. Quantity
1 Cement Ordinary Portland or Equivalent in Bags (50 Kg) Bags 20
2 Masonry Blocks (400 x 200 x 400) No. 100
3 Ready mix concrete up to Gr.20 Cu.m 5
4 - do - from Gr. 20 up to Gr. 35 A Cu.m 3
5 River sand Cu. m. 5
6 Coarse aggregate for concrete as specified Cu.m 5
7 Fine aggregate for concrete as specified Cu.m 5
8 Timber (Class 1) Cu.m 1
9 Shuttering Planks Sq. m 100
10 Barra Emulsion litre 20
11 Petrol litre 50
12 Diesel litre 50
13 Paints (Enamel/Emulsion) litre 10
14 Bitumen Paints litre 50
15 Thinner litre 10
16 Ribbed TOR Steel reinforcing Bar Tonne 0.1
17 Sheet Piles Tonne 1

Total for Day works Labor:


(Carried forward to Day works Summary on Page 23)

Bidding Document for CONTRACT NO: Procurements of work Single Stage -Two Envelop
22 DAY WORK SCHEDULES

SCHEDULE OF DAY WORKS 3: EQUIPMENT

ITEM Nominal Rate Amount


DESCRIPTION UNIT
NO. Quantity LKR LKR

1 Baby Dumper hr. 20

2 Backhoe Loader (101HP) hr. 20

3 Backhoe Loader (90HP) hr. 20

4 Bull Dozer (Crawler Tractor) (95HP) hr. 20

5 Excavator (.18 m3) hr. 20

6 Excavator (.35 m3) hr. 20

7 Motor Grader (3.1 m) hr. 10

8 Pneumatic Roller (8 -10 Ton) hr 20

9 Sludge pump 4” dia. hr 50

10 Soil Compactor – Vibrating Roller (01 T) hr. 20

11 Tractor with Trailer hr. 50

12 Water pump 4” dia. hr 50

13 Wheel Loader (.9 m3) hr. 20

14 Wheel Loader (1.4 m3) hr. 20

15 Fork Lift (minimum 5 hrs.) – 2.5 on 5 hrs 20

16 Boom Truck (3 Ton) day 20

17 Dump Truck (3 Ton) day 20

18 Hand Rammers (60 Kg) day 20

19 Plate Compactor (Mechanical) (90 Kg) day 20

20 Water Bowser (with driver) (6000 lts) day 20

21 Butt fusion Machine month 0.25

22 Low Loader Truck (30 – 40 Ton) Km 50

23 Truck with Tipper (3 – 8 Ton) Km 50

Total for Day works Equipment:


(Carried forward to Day works Summary on Page 23)

DAY WORKS SUMMARY

Single Stage -Two Envelop Procurements of work Bidding Document CONTRACT NO:
DAY WORK SCHEDULES 23

Description Amount
LKR

1. Total for Day work: Labor

2. Total for Day work: Materials

3. Total for Day work: Equipment

Total Day Works

Note:

1. The Total Day works shall be taken for evaluation, but shall not be included in the

Contract price

2. Contractor’s overhead and profit should be included to the above rates.

Bidding Document for CONTRACT NO: Procurements of work Single Stage -Two Envelop