You are on page 1of 4

Dubai 2020 Urban Masterplan

environmental challenges and


Forward constraints, and to the socio- • Define urbanization
economic transformations. parameters, and the
The Plan follows the vision of His expansion of future
Highness Shaikh Mohammed Bin metropolitan and regional
The Plan identified the desired
Rashid Al Maktoum The Ruler of settlements; and consider
urbanization parameters, urban
Dubai. infill redevelopment and
fabric and form, development
staging, and scale as the city revitalization opportunities
Underpinning the Plan was the
sought to refocus its targets for
vision of Dubai as a modern Arab • Promote sustainable and well
economic growth and
city and vibrant regional gateway integrated land-use planning
sustainability.
to the world. and mobility networks
Key to the Plan was defining a
Since 1950, Dubai population
preferred spatial direction and • Facilitate the development of
grew about 100 times from a
form that responds to the Emirate activities hubs and centers,
small town of 20 thousands
needs and growth to 2020, while and competitive world class
inhabitants to 1.9 million
enabling immediate possibilities investment oriented
inhabitants (as estimated in
for public and private investment developments (housing,
2010). while its urban fabric
to achieve sustainable growth to resorts, ports, hospitality,
extended rapidly 400 times
beyond 2020 where required. tourism, etc).
approximately.
The Plan considered the impact • Balance between urban
It is known today that during
of the global economic downturn development and
business hours, Dubai may
in 2008; and It aims at promoting conservation of the natural
receive approximately 1.0 million
flexible and responsive landuse, and man-made heritage
visitors (generated from tourism
and quality built environment. environments.
and business trips from other
emirates and abroad).
The objectives of the Plan are to • Provide adequate &
appropriate housing for all
The adopted population forecast
• identify the urbanization (including affordable rental
for 2020 is 2.8 million inhabitants
parameters, housing), and community
as per a medium growth
• facilitate a competitive and facilities.
scenario. However, the Plan is
sustainable spatial planning,
made flexible and allow for a
and • Promote the integrated
higher growth where required.
• continue promoting provision of environmental
responsive planning system infrastructure: water,
The Plan covers the Dubai
and governance framework sanitation, drainage and
Emirate territories including the
to streamline and guide future solid-waste management
sea territory within the12 nautical
miles, the existing urban fabric spatial urbanization
• Promote efficient, secure, and
and committed urban land, and
The Plan considered the environmentally friendly
the desert territory and non-
following issues and aspects: energy supply.
urban land excluding Hatta
Province.
• Forecast the transformation • Mitigate any environmental
The Dubai 2020 Urban of population, and the Socio- degradation.
Masterplan adopts flexible, political trends. This is the
sustainable, and competitive key to managing future • Promote safe and healthy
approach to achieve a city of urbanization. urban environments.
excellence. It seeks to optimize
on existing government • Consider spatial development • Promote implementation tools
infrastructure investments; constraint and possibilities, including governance
rationalize an integrated landuse and challenges. framework
and transport; protect key
economic assets; and be flexible
and responsive to the

Dubai Municipality, Planning Department Page 1 of 4 Feb 2012 File: RB


Dubai 2020 Urban Masterplan

Scope of Work: development assessment and residential plots of land for


approvals). Nationals housing
.
The Planning approach is simply
Given the time constraints of
summarized as follows:
preparing the Dubai 2020 Plan,
Acknowledgement
The Steering Committee
• Identify the elements and The four phases of the Dubai
recommended further essential
components of Dubai 2020 Plan was prepared by the
tasks to be carried out (to
urbanization; Dubai Urban Planning Steering
complement the implementation
Committee in conjunction with
of Dubai 2020 Masterplan).
• Analysis and synthesis of the the services of the consultant
including:
elements and components; AECOM Middle East LTD during
the period July 2010- July 2012.
• A Planning and Environment
• Establish strategies and
Law to complement Phase-4
policies for future The Steering Committee was
(to guide the urban planning
urbanization with established in 2010 by the
and development process);
considerations to the legal Infrastructure and Environment
and
aspects of all land committed Committee, The Executive
for development before 2008, Council, Dubai Government.
• A subsequent Phase-5
related to Urban &
• Prepare comprehensive The Dubai Urban Planning
Environmental Management
strategic spatial structure Steering Committee included
(a Statutory Planning phase members from Dubai Municipality
plan; and
to facilitate the
(DM), Roads and Traffic Authority
implementation of Phases 3).
• Promote implementation tools (RTA), Dubai Electricity and
including legal framework. Water Authority (DEWA), Dubai
Current Status of Civil Aviation Authority (DCAA),
The task was carried out with Dubai Maritime City Authority
consultations with the relevant
the Dubai 2020 (DMCA), and Dubai Land
parties and stakeholders; and in Master Plan: Department who all made
four phases as follows: substantial professional
The Dubai Executive Council has contributions to the preparation of
Phase-1: Review, analysis, and issued the following decisions: the Dubai 2020 Plan.
Synthesis of the Existing
Situation (covering the relevant Decision No 22/2011which adopt The contributions and
aspects: the natural and man- the Urban Spatial Structure Plan participation of the following
made environments, population (Phase-3) including the basic stakeholders and parties are
demographic, socio cultural, strategic directions and also acknowledged:
economic, etc). objectives of the Plan.
• The Dubai Master Developers
Phase-2: Perspective of Decision No 23/2011: which (national property
Development & Urbanization adopt the principle of establishing development companies-
(forecasting for future Urban a ‘Supreme Urban Planning Emaar, Nakheel, etc); and
growth, and prepare Urban Council’ (SUPC) as initially other departments and
Development Program). proposed in Phase-4. This is in agencies of Dubai
order to define the related government.
legislative and statutory
Phase-3: Spatial Structure Plan framework that streamlines the • Dubai Municipality
(Emirate wide Spatial Strategic Emirate’s urban and Departments (Planning,
Planning). environmental planning process Environment, Horticulture &
in a competitive approach. Parks, Sewerage & Irrigation
Phase-4: Legislative and Solid Waste
Implementation Tools (Legal Decision No 24/2011: which Management);
Implementation Tools to adopt the proposal of making
streamline planning process, and available a total of 24,000

Dubai Municipality, Planning Department Page 2 of 4 Feb 2012 File: RB


Dubai 2020 Urban Masterplan

was committed before 2008 for


• The Dubai Government Urbanization urbanization) covers also 20%
Statistics Team as
approximately of the Emirate
established by Dubai Parameters main land area
Municipality in 2010; and
Dubai Emirate extends on land
• The Planning Research and sea. The sea territory within12
Section Team, Dubai nautical miles covers 1450 sq.km
Municipality who was The Emirate main land ( approximately. By 2008,
responsible on the daily excluding Hatta Province - 127 approximately 23% of this
coordination, management Sq.Km) covers 3978 Sq.Km , of territory was subject to dredging
and administration of the which 20% approximately and reclamation as offshore man-
Project under the directions of covered by the existing urban made islands. These islands as
the Steering Committee fabric and projects under at 2010 are partially developed
Head. construction (generally located and urbanized.
west of the outer by-pass road).
The undeveloped land (which

Dubai Municipality, Planning Department Page 3 of 4 Feb 2012 File: RB


Dubai 2020 Urban Masterplan

Note:

The Plan may be reviewed


periodically and/ or amended
anytime where required as
directed by Dubai Government.

Dubai Municipality, Planning Department Page 4 of 4 Feb 2012 File: RB

You might also like