Professional Documents
Culture Documents
MFG Option: -37 may be made from RS009023-M03 R0017426 SH5 BN19
CSP*: Penetrant inspect per RA0115-116, Type IVc CSP RA0115-116 R SH5 GN7
Warning - This document contains technical data the export of which is or may be restricted by the Arms Export Control Act and the International Traffic in Arms Regulations (ITAR), 22 C.F.R
parts 120 - 130. Diversion contrary to U.S. law is prohibited. The export, re-export, transfer or re-transfer of this technical data to any other company, entity, person, or destination, or for Page 1 of 5
any use or purpose other than that for which the technical data was originally provided by Aerojet Rocketdyne, is prohibited without prior written approval from Aerojet Rocketdyne and
authorization under applicable export control laws.
Validated
PPAR: Procured Product Acceptance Requirements Aerojet Rocketdyne
This PPAR includes validation requirements. It does not include all drawing requirements and does not include requirements related to specific fabrication sequencing. This PPAR includes
requirements supplemental to all the other requirements of this contract. The requirements of this PPAR shall not relieve Seller of any of its obligations under this contract, nor excuse or
constitute a waiver of any defects or nonconformities in any Goods furnished under this contract, nor change, modify or otherwise affect any of the provisions or requirements of this
contract, including but not limited to the price and delivery schedules contained therein.
In addition, for documents that Aerojet Rocketdyne is not the design authority for and are displayed as 'n/a' or a hyphen symbol '-', use the latest released document at time of first purchase
order release to your company.
This document contains ITAR/USML Technical Information Category IV (i) subject to the export restrictions on the first page Page 2 of 5
Validated
PPAR: Procured Product Acceptance Requirements Aerojet Rocketdyne
This PPAR includes validation requirements. It does not include all drawing requirements and does not include requirements related to specific fabrication sequencing. This PPAR includes
requirements supplemental to all the other requirements of this contract. The requirements of this PPAR shall not relieve Seller of any of its obligations under this contract, nor excuse or
constitute a waiver of any defects or nonconformities in any Goods furnished under this contract, nor change, modify or otherwise affect any of the provisions or requirements of this
contract, including but not limited to the price and delivery schedules contained therein.
Certificates of Conformance
For each designated Certified Special Process (CSP) or Approved Source List (ASL) material, Seller shall submit to Buyer with Sellers shipping document a copy of Sellers Certificate of
Conformance.
Source Validation
If Seller is a "Supplier Portal" Supplier, then Seller will use the Supplier Portal to request Canoga Park Inspection Service. If Supplier is NOT registered for the Supplier Portal, then Seller
will call (818) 586-2790 for assistance.
This document contains ITAR/USML Technical Information Category IV (i) subject to the export restrictions on the first page Page 3 of 5
Validated
PPAR: Procured Product Acceptance Requirements Aerojet Rocketdyne
This PPAR includes validation requirements. It does not include all drawing requirements and does not include requirements related to specific fabrication sequencing. This PPAR includes
requirements supplemental to all the other requirements of this contract. The requirements of this PPAR shall not relieve Seller of any of its obligations under this contract, nor excuse or
constitute a waiver of any defects or nonconformities in any Goods furnished under this contract, nor change, modify or otherwise affect any of the provisions or requirements of this
contract, including but not limited to the price and delivery schedules contained therein.
Remarks:
This document contains ITAR/USML Technical Information Category IV (i) subject to the export restrictions on the first page Page 4 of 5
Validated
PPAR: Procured Product Acceptance Requirements Aerojet Rocketdyne
This PPAR includes validation requirements. It does not include all drawing requirements and does not include requirements related to specific fabrication sequencing. This PPAR includes
requirements supplemental to all the other requirements of this contract. The requirements of this PPAR shall not relieve Seller of any of its obligations under this contract, nor excuse or
constitute a waiver of any defects or nonconformities in any Goods furnished under this contract, nor change, modify or otherwise affect any of the provisions or requirements of this
contract, including but not limited to the price and delivery schedules contained therein.
PACKAGE AND PROTECT PER RA0116-094, METHOD P-13. USE N/A 100% Inspect
OF COMMERCIAL EQUIVALENT PACKAGING IS PERMISSIBLE.
Apply acceptance stamp per RQ0711-635 and drawing SH5 GN13 100% Verify
requirements
Remarks:
This document contains ITAR/USML Technical Information Category IV (i) subject to the export restrictions on the first page Page 5 of 5