PREBORING METHOD
STRAIGHT BORING
1. Check verticality, start preboring.

2. During preboring, interval 1m preboring must be check verticality.

3. Design depth of preboring is shown in attachment.

Checking the verticality

 Axis of auger must be straightness with ladder

 After the penetration, theodolite operator can't be expected to guide the straightness of pile

 Unting- unting + Theodolite  enough


Theodolite + Theodolite good  good