THE ROCHESTER PROJECT

RFI REPLIES MONITORING


AS OFMAY 05, 2018

RFI NO.: ISSUES COMMENTS

AR 008 BLOW UP DETAIL PROVIDED DETAIL


AR 009 UNITS 7&9 @ 2ND FLOOR CLARIFIED
AR 010 UNITS 13,14,15,16 CLARIFIED
AR 011 UNIT 13 PROVIDED DETAIL
CLARIFIED/ PROVIDED NEW ROOM
AR 012 CEILING MATERIAL CONFLICTS SCHEDULE
LEDGE @ 15TH/PARAPET WALL CLARIFIED/PROVIDED DETAILS/ NOTE:
AR 013 HT DRAWINGS SECTIONS
CORRIDOR FLOOR FINISH/NON VERIFY ID PLAN/ CONFIRMED LOCATION
AR 014 SKID TILES ON RAMP DRIVEWAY ONLY

CORRIDOR FR TO 2400 TO 2300


(3RDTO16TH); CORRIDOR 2ND & 17TH
MNT 2400; 3BR UNITS FRM 2400 TO 2300
CORRIDOR & ROOM UNIT (3RD-4TH-16TH); 3BR UNITS FROM 2700 TO
AR 018 CEILING HT 2600 (17TH)

AR 019 BAY WINDOW/ CEILING MAT


AR 020 STAIRS
AR 021 CMU THAT WILL BE USED

AR 022 CMU BLOCKWORKS

AR 023 CEILING HT OF ROOM UNITS


AR 025 CHANGING OF CHB TO AAC BLOCKS
AR 027 CEILING HT OF CORRIDOR CONFLICT
AR 028 MRF ROOFING PROFILE
AR 029 METER DOOR & PIPE CHASE DOOR
AR 030 AMENITY FINISHES
AR 031 GROOVES
STATUS DATE SUBMITTED REMARKS ADDITIONAL NOTES

RETURNED
RETURNED
RETURNED
RETURNED

RETURNED SEE NEW ROOM SCHEDULE

1200MM PARAPET WALLS ON 3RD


RETURNED & ROOFDECK

FINISHES ALREADY GIVEN TO BE


RETURNED CHECK IF ID PLAN IS AVAILABLE CHECKED
UNITS W/ CEILING HT PROVIDED:
2BR-B(008), 2BR-AB(011), 3BR-
A(018), 3BR-B(018), 3BR-BB(018),
3BR-C(018)

VERIFY OTHER UNITS 1BR TO 2BR;


(TO MAKE RFI) DONE
USE 9MM THK ON
GENSET/METERING/TRANSFORMER
RETURNED & BAY ROOF CEILING
RETURNED WITH NOTES
RETURNED

RETURNED WITH ATTACHMENT REFER TO WALL DETAILS AC-605-CD

UNITS W/ CEILING HT PROVIDED:


1BR-A(023), 1BR-B(023), 2BR-
A(023), 2BR-BB(023), 2BR-C(023),
RETURNED VERIFIED FROM RFI AR RFI 018 2BR-D(023), 2BR-E(023)
NOT YET 5/12/2018
NOT YET 5/12/2018
RETURNED 5/18/2018 RIB TYPE LONG SPAN ROOFING SEE SPECS
NOT YET 5/24/2018
NOT YET 5/24/2018
NOT YET 5/25/2018
FLOOR FINISHES SCHEDULE AND MONITORING (Summary)
GROUND FLOOR
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY NOTES
NO.
300X300 Ceramic Tiles GF 04, GF 05 Toilet & Bath, Janitor's Closet
GF 01, GF 02, GF
600x600 Homogenous Tiles 03 Elev. Lobby, Lobby, Mailbox, Patio, Entrance Stairs, JC, Drop Of

Smooth Finish n/a


Dust Proof Concrete Finish GF 07, GF 08 FE Stair 1 & FE Stair 2

*VERIFY PAINTED AREA


AS PER DESIGN
Concrete Hardener Finish GF 11 Ramp, Driveway/ Parking, Metering Room BULLETIN 002/003

*VERIFY PAINTED AREA


AS PER DESIGN
Non Skid Tiles GF 11 Ramp, Driveway Parking BULLETIN 002/003

GF 06, GF 14 & GF IDF & T/E Room 1&2, Pump Room, Transformer, Genset Room
Epoxy Floor Coating 15 *changed to smooth straight to finish refer to PMI13 DB002

2ND FLOOR - 17TH FLOOR


ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
1BA01-02-03 KITCHEN/DINING, LIVING, T&B, BR (UNIT 1)
300X300 Ceramic Tiles (FF1) 1BB01-02-03 KITCHEN/DINING, LIVING, T&B, BR (UNIT7,9,12)
1BBBB01-02-03 KITCHEN/DINING, LIVING, T&B, BR (UNIT 6)
2BA01-02-03-04 KITCHEN/DINING, LIVING. MBR, BR, T&B (UNIT 2)
2BAB01-02-03-04 KITCHEN/DINING, LIVING. MBR, BR, T&B (UNIT 8&13)
2BB01-02-03-04 KITCHEN/DINING, LIVING. MBR, BR, T&B (UNIT 3)
300X300 Ceramic Tiles (FF1) 2BBB01-02-03-04 KITCHEN/DINING, LIVING. MBR, BR, T&B (UNIT 16)

2BC01-02-04-05 KITCHEN/DINING, LIVING. MBR, BR, T&B (UNIT 10)


2BD01-02-04-05 KITCHEN/DINING, LIVING. MBR, BR, T&B (UNIT 11)
2BE01-02-04-05 KITCHEN/DINING, LIVING. MBR, BR, T&B (UNIT 16)

BALCONY (UNIT 10) BALCONY


400X400 Ceramic Tiles (FF2) 2BC03 2BD03 (UNIT 11) BALCONY (UNIT 16)
2BE03
3BA01-03-05-06- KITCHEN/DINING, LIVING, T&B, BR, BR, MBR, T&B, UTILITY
08 (UNIT 4)
300X300 Ceramic Tiles (FF1) 3BB01-03-05-06- KITCHEN/DINING, LIVING, T&B, BR, BR, MBR, T&B, UTILITY
08 (UNIT 5)
3BBB01-03-05-06- KITCHEN/DINING, LIVING, T&B, BR, BR, MBR, T&B, UTILITY
08 (UNIT 14)

BALCONY (UNIT 4) BALCONY


400X400 Ceramic Tiles (FF2) 3BA04 3BB04 (UNIT 5) BALCONY (UNIT 14)
3BBB04
HW 01 HALLWAY
300X300 Ceramic Tiles (FF1)
EL 01 ELEVATOR LOBBY
Epoxy Floor Coating TE 01 T/E ROOM
Dust Proof Concrete Finish FE 01, FE 02 FE Stair 1 & FE Stair 2

3RD FLOOR
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
2BE01-02-03-04 KITCHEN/DINING, LIVING. MBR, BR, T&B (UNIT 15)
3BA01-02-03-04- KITCHEN/DINING, LIVING, T&B, BR, BR, MBR, T&B, UTILITY
300X300 Ceramic Tiles (FF1) 05-06-07 (UNIT 4)
3BA01-02-03-04- KITCHEN/DINING, LIVING, T&B, BR, BR, MBR, T&B, UTILITY
05-06-07 (UNIT 5)

ROOFDECK
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
Poured Concrete RD01 ROOFDECK
Dust Proof Concrete Finish FE 01, FE 02 FE Stair 1 & FE Stair 2
Epoxy Floor Coating MR01, UR01 MACHINE ROOM, UNASSIGNED ROOM
REMARKS

t to finish refer to PMI13 DB002

REMARKS

*02=T&B

*04-T&B
*04-T&B
*04-T&B
*04-T&B

*05-T&B
*02&07-T&B

*02&07-T&B

*02&07-T&B

COMMON
AREAS

REMARKS

*04-T&B
*02&07-T&B

*02&07-T&B

REMARKS

*NO FINISH
CEILING SCHEDULE AND MONITORING (Summary)
GROUND FLOOR
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY NOTES
NO.

GF 06, GF 07, GF IDF, T/E Room, FE Stair 1&2, Pump Room, Genset Room,
Rubbed Finish/ Skimcoat/ Exposed Concrete 08, GF 09, GF 15, Driveway/ Parking
(EC) GF 11
9mm THK Ficemboard GF 12, GF 13 Patio, Metering Area
GF 01, 02, 03, 04, Lobby, Elev. Lobby, Mail Box, T&B, JC, Drop Of, Driveway/
12.5mm Gympsum Board MR 05, 10, 11 Parking

2ND FLOOR - 16TH FLOOR


ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
1BA03 BR (UNIT 1)
1BB03 BR (UNIT 7,9,12)
1BBB03 BR (UNIT 6)

2BA02-03 MBR, BR (UNIT 2)

2BAB02-03 MBR, BR (UNIT 8,13)

2BB02-03 MBR, BR (UNIT 3)

2BBB02-03 MBR, BR (UNIT 16)

2BC02-03 MBR, BR (UNIT 10)


Rubbed Finish/ Skimcoat/ Exposed Concrete
(EC) 2BD02-03 MBR, BR (UNIT 11)

2BE02-03 MBR, BR (UNIT 16)

3BA03-05-06 MBR, BR, BR (UNIT 4)

3BB03-05-06 MBR, BR, BR (UNIT 5)

3BBB03-05-06 MBR, BR, BR (UNIT 14)


TE-01 T/E ROOM
FE 01 STAIR 1 COMMON AREAS

FE 02 STAIR 2

1BA03 BR (UNIT 1) *BULKHEAD


1BB03 BR (UNIT 7,9,12)
1BBB03 BR (UNIT 6)

2BA02 MBR (UNIT 2)

2BAB02 MBR (UNIT 8,13)

2BB02 MBR (UNIT 3)


9mm THK Ficemboard 2BBB02 MBR (UNIT 16)
2BC03 BALCONY (UNIT 10)
2BD03 BALCONY (UNIT 11)
2BE03 BALCONY (UNIT 16)
3BA04 BALCONY (UNIT 4)
3BB04 BALCONY (UNIT 5)
3BBB04 BALCONY (UNIT 14)

1BA01-02 KITCHEN/DINING, LIVING, T&B (UNIT 1)


1BB01-02 KITCHEN/DINING, LIVING, T&B (UNIT 7,9,12)
1BB01-02 KITCHEN/DINING, LIVING, T&B (UNIT 6)
2BA01-04 KITCHEN/DINING, LIVING, T&B (UNIT 2)
2BA01-04 KITCHEN/DINING, LIVING, T&B (UNIT 8,13)
2BA01-04 KITCHEN/DINING, LIVING, T&B (UNIT 3)
2BA01-04 KITCHEN/DINING, LIVING, T&B (UNIT 16)
2BC01-05 KITCHEN/DINING, LIVING, T&B (UNIT 10)
12.5mm Gympsum Board MR
2BD01-05 KITCHEN/DINING, LIVING, T&B (UNIT 11)
2BE01-05 KITCHEN/DINING, LIVING, T&B (UNIT 16)
3BA01-02-07-08 KITCHEN/DINING, LIVING, T&B, T&B, UTILITY (UNIT 4)
3BB01-02-07-08 KITCHEN/DINING, LIVING, T&B, T&B, UTILITY (UNIT 5)
3BBB01-02-07-08 KITCHEN/DINING, LIVING, T&B, T&B, UTILITY (UNIT 14)
HW-01 HALLWAY
COMMON AREAS

EL-01 ELEVATOR LOBBY

4mm THK Ficemboard Ventilated CB w/ Insect IDENTIFY LOCATION


Screen
17TH FLOOR
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.

1BA03 BR (UNIT 1)

1BB03 BR (UNIT 7,9,12)

1BBB03 BR (UNIT 6)

2BA02-03 MBR, BR (UNIT 2)

2BAB02-03 MBR, BR (UNIT 8,13)

2BB02-03 MBR, BR (UNIT 3)

2BBB02-03 MBR, BR (UNIT 16)

2BC02-03 MBR, BR (UNIT 10)


Rubbed Finish/ Skimcoat/ Exposed Concrete
(EC) 2BD02-03 MBR, BR (UNIT 11)

2BE02-03 MBR, BR (UNIT 16)

3BA03-05-06 MBR, BR, BR (UNIT 4)

3BB03-05-06 MBR, BR, BR (UNIT 5)

3BBB03-05-06 MBR, BR, BR (UNIT 14)

TE-01 T/E ROOM


COMMON AREAS
FE 01 STAIR 1

FE 02 STAIR 2

1BA03 BR (UNIT 1) BULKHEADS

1BB03 BR (UNIT 7,9,12)

1BBB03 BR (UNIT 6)

2BA02 MBR (UNIT 2)

2BAB02 MBR (UNIT 8,13)


2BB02 MBR (UNIT 3)

9mm THK Ficemboard 2BBB02 MBR (UNIT 16)

2BC03 BALCONY (UNIT 10)


9mm THK Ficemboard

2BD03 BALCONY (UNIT 11)

2BE03 BALCONY (UNIT 16)

3BA04 BALCONY (UNIT 4)

3BB04 BALCONY (UNIT 5)

3BBB04 BALCONY (UNIT 14)

1BA01-02 KITCHEN/DINING, LIVING, T&B (UNIT 1)


1BB01-02 KITCHEN/DINING, LIVING, T&B (UNIT 7,9,12)
1BB01-02 KITCHEN/DINING, LIVING, T&B (UNIT 6)
2BA01-04 KITCHEN/DINING, LIVING, T&B (UNIT 2)
2BA01-04 KITCHEN/DINING, LIVING, T&B (UNIT 8,13)
2BA01-04 KITCHEN/DINING, LIVING, T&B (UNIT 3)
2BA01-04 KITCHEN/DINING, LIVING, T&B (UNIT 16)
2BC01-05 KITCHEN/DINING, LIVING, T&B (UNIT 10)
12.5mm Gympsum Board MR
2BD01-05 KITCHEN/DINING, LIVING, T&B (UNIT 11)
2BE01-05 KITCHEN/DINING, LIVING, T&B (UNIT 16)
3BA01-02-07-08 KITCHEN/DINING, LIVING, T&B, T&B, UTILITY (UNIT 4)
3BB01-02-07-08 KITCHEN/DINING, LIVING, T&B, T&B, UTILITY (UNIT 5)
3BBB01-02-07-08 KITCHEN/DINING, LIVING, T&B, T&B, UTILITY (UNIT 14)

HW-01 HALLWAY
COMMON AREAS

EL-01 ELEVATOR LOBBY

4mm THK Ficemboard Ventilated CB w/ Insect IDENTIFY LOCATION


Screen

3RD FLOOR
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
2BE02-03 MBR, BR (UNIT 15)
Rubbed Finish/ Skimcoat/ Exposed Concrete
(EC) 3BA03-04-05 BR, BR, MBR (UNIT 4)
3BB03-04-05 BR, BR, MBR (UNIT 5)
9mm THK Ficemboard 2BE02 MBR (UNIT 15)

12.5mm Gympsum Board MR 2BE01-05 KITCHEN/DINING, LIVING, T&B (UNIT 15)


3BA01-02-06-07 KITCHEN/DINING, LIVING, T&B, T&B, UTILITY (UNIT 4)
3BB01-02-06-07 KITCHEN/DINING, LIVING, T&B, T&B, UTILITY (UNIT 5)

4mm THK Ficemboard Ventilated CB w/ Insect


IDENTIFY LOCATION
Screen

ROOF DECK
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
MR-01 MACHINE ROOM
Rubbed Finish/ Skimcoat/ Exposed Concrete
(EC) UR-01 UNASSIGNED ROOM

9mm THK Ficemboard RD-01 ROOFDECK


FE-01 STAIR 1
FE-02 STAIR 2
REMARKS

*Verify if Genset has


9mm ficemboard and
driveway/parking have
Gympsum

REMARKS

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING
*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING
REMARKS

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE
*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

*CONFLICT W/
SCHEDULE

REMARKS
*CONFLICT W/
DRAWING

*CONFLICT W/
DRAWING
*CONFLICT W/
DRAWING

REMARKS
WALL FINISHES SCHEDULE AND MONITORING (Summary)
GROUND FLOOR
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY NOTES
NO.

300MMX300MM CT, PAINTED FINISH GF 04-05 TOILET, JANITOR'S CLOSET

JANITOR'S CLOSET
GF 01-02-03-07- LOBBY, ELEVATOR LOBBY, MAILBOX, FE STAIR 1, FE STAIR 2,
PAINTED FINISH, GLASS 08-10-12 DROP-OFF, PATIO

PAINTED PLASTER GF 06-13-14-15 IDF & T/E ROOM, METERING AREA, TRANSFORMER, GENSET
* TO BE VERIFIED COLUMNS
* TO BE VERIFIED DRIVEWAY AND PARKING COLUMNS AND DROPWALLS
* TO BE VERIFIED INTERIOR OF PIPE CHASE

2ND FLOOR - 16TH FLOOR


ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
1BA03 BR (UNIT 1)
1BB03 BR (UNIT 7,9,12)
1BBB03 BR (UNIT 6)
2BA02-03 MBR, BR (UNIT 2)
2BAB02-03 MBR, BR (UNIT 8,13)
2BB02-03 MBR, BR (UNIT 3)
PAINTED PLASTER, GLASS 2BBB02-03 MBR, BR (UNIT 16)
2BC02-03 MBR, BR (UNIT 10)
2BD02-03 MBR, BR (UNIT 11)
2BE02-03 MBR, BR (UNIT 16)
3BA03-05-06 MBR, BR, BR (UNIT 4)
3BB03-05-06 MBR, BR, BR (UNIT 5)
3BBB03-05-06 MBR, BR, BR (UNIT 14)
1BA03 BR (UNIT 1) *BULKHEAD

1BB03 BR (UNIT 7,9,12)


1BBB03 BR (UNIT 6)

PAINTED PLASTER, GLASS


2BA02 MBR (UNIT 2)
2BAB02 MBR (UNIT 8,13)
2BB02 MBR (UNIT 3)
PAINTED PLASTER, GLASS 2BBB02 MBR (UNIT 16)
2BC03 BALCONY (UNIT 10)
2BD03 BALCONY (UNIT 11)
2BE03 BALCONY (UNIT 16)
3BA04 BALCONY (UNIT 4)
3BB04 BALCONY (UNIT 5)
3BBB04 BALCONY (UNIT 14)
1BA01 KITCHEN/DINING, LIVING (UNIT 1)
1BB01 KITCHEN/DINING, LIVING (UNIT 7,9,12)
1BB01 KITCHEN/DINING, LIVING (UNIT 6)
2BA01 KITCHEN/DINING, LIVING (UNIT 2)
2BA01 KITCHEN/DINING, LIVING (UNIT 8,13)
2BA01 KITCHEN/DINING, LIVING (UNIT 3)
PAINTED PLASTER, GLASS 2BA01 KITCHEN/DINING, LIVING (UNIT 16)
2BC01 KITCHEN/DINING, LIVING (UNIT 10)
2BD01 KITCHEN/DINING, LIVING (UNIT 11)
2BE01 KITCHEN/DINING, LIVING (UNIT 16)
3BA01-08 KITCHEN/DINING, LIVING, UTILITY (UNIT 4)
3BB01-08 KITCHEN/DINING, LIVING, UTILITY (UNIT 5)
3BBB01-08 KITCHEN/DINING, LIVING, UTILITY (UNIT 14)

1BA02 T&B (UNIT 1)

1BB02 T&B (UNIT 7,9,12)

1BB02 T&B (UNIT 6)

2BA04 T&B (UNIT 2)

2BA04 T&B (UNIT 8,13)

2BA04 T&B (UNIT 3)


300MMX300MM CT, PAINTED FINISH 2BA04 T&B (UNIT 16)

2BC05 T&B (UNIT 10)

2BD05 T&B (UNIT 11)


300MMX300MM CT, PAINTED FINISH

2BE05 T&B (UNIT 16)

3BA07 MBR T&B, T&B (UNIT 4)

3BB07 MBR T&B, T&B (UNIT 5)

3BBB07 MBR T&B, T&B (UNIT 14)

HW-01 HALLWAY
PAINTED PLASTER, GLASS FE 01 STAIR 1 COMMON AREAS

FE 02 STAIR 2
EL-01 ELEVATOR LOBBY
PAINTED PLASTER
TE-01 T/E ROOM
DRIVEWAY AND PARKING COLUMNS AND DROPWALLS,
* TO BE VERIFIED PARAPET WALLS
* TO BE VERIFIED INTERIOR OF PIPE CHASE
17TH FLOOR
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
1BA03 BR (UNIT 1)
1BB03 BR (UNIT 7,9,12)
1BBB03 BR (UNIT 6)
2BA02-03 MBR, BR (UNIT 2)
2BAB02-03 MBR, BR (UNIT 8,13)
2BB02-03 MBR, BR (UNIT 3)
PAINTED PLASTER, GLASS 2BBB02-03 MBR, BR (UNIT 16)
2BC02-03 MBR, BR (UNIT 10)
2BD02-03 MBR, BR (UNIT 11)
2BE02-03 MBR, BR (UNIT 16)
3BA03-05-06 MBR, BR, BR (UNIT 4)
3BB03-05-06 MBR, BR, BR (UNIT 5)
3BBB03-05-06 MBR, BR, BR (UNIT 14)
1BA03 BR (UNIT 1) BULKHEADS

1BB03 BR (UNIT 7,9,12)


1BBB03 BR (UNIT 6)
2BA02 MBR (UNIT 2)
2BAB02 MBR (UNIT 8,13)

PAINTED PLASTER, GLASS


2BB02 MBR (UNIT 3)
PAINTED PLASTER, GLASS 2BBB02 MBR (UNIT 16)
2BC03 BALCONY (UNIT 10)
2BD03 BALCONY (UNIT 11)
2BE03 BALCONY (UNIT 16)
3BA04 BALCONY (UNIT 4)
3BB04 BALCONY (UNIT 5)
3BBB04 BALCONY (UNIT 14)
1BA01 T&B (UNIT 1)

1BB01 T&B (UNIT 7,9,12)

1BB01 T&B (UNIT 6)

2BA01 T&B (UNIT 2)

2BA01 T&B (UNIT 8,13)

2BA01 T&B (UNIT 3)


300MMX300MM CT, PAINTED FINISH T&B (UNIT 16)
2BA01
2BC01 T&B (UNIT 10)

2BD01 T&B (UNIT 11)

2BE01 T&B (UNIT 16)


3BA01-08 MASTER T&B, T&B (UNIT 4)
3BB01-08 MASTER T&B, T&B (UNIT 5)
3BBB01-08 MASTER T&B, T&B (UNIT 14)
1BA01 KITCHEN/DINING, LIVING (UNIT 1)
1BB01 KITCHEN/DINING, LIVING (UNIT 7,9,12)
1BB01 KITCHEN/DINING, LIVING (UNIT 6)
2BA01 KITCHEN/DINING, LIVING (UNIT 2)
2BA01 KITCHEN/DINING, LIVING (UNIT 8,13)
2BA01 KITCHEN/DINING, LIVING (UNIT 3)
PAINTED PLASTER, GLASS 2BA01 KITCHEN/DINING, LIVING (UNIT 16)
2BC01 KITCHEN/DINING, LIVING (UNIT 10)
2BD01 KITCHEN/DINING, LIVING (UNIT 11)
2BE01 KITCHEN/DINING, LIVING (UNIT 16)
3BA01-08 KITCHEN/DINING, LIVING, UTILITY (UNIT 4)
3BB01-08 KITCHEN/DINING, LIVING, UTILITY (UNIT 5)
3BBB01-08 KITCHEN/DINING, LIVING, UTILITY (UNIT 14)
HW-01 HALLWAY
PAINTED PLASTER, GLASS FE 01 STAIR 1
FE 02 STAIR 2 COMMON AREAS

PAINTED PLASTER TE-01 T/E ROOM


EL-01 ELEVATOR LOBBY

HW-01 HALLWAY
PAINTED PLASTER, GLASS FE 01 STAIR 1
COMMON AREAS
FE 02 STAIR 2

PAINTED PLASTER TE-01 T/E ROOM


EL-01 ELEVATOR LOBBY
* TO BE VERIFIED INTERIOR OF PIPE CHASE

ROOF DECK
ITEM ITEM DESCRIPTION SCHEDULE LOCATION STATUS QUANTITY
NO.
MR-01 MACHINE ROOM
PAINTED PLASTER UR-01 UNASSIGNED ROOM
RD-01 ROOFDECK
PAINTED PLASTER FE-01 STAIR 1
PAINTED PLASTER FE-02 STAIR 2

HW-01 HALLWAY
PAINTED PLASTER, GLASS FE 01 STAIR 1 COMMON AREAS

FE 02 STAIR 2
DRIVEWAY AND PARKING COLUMNS AND DROPWALLS,
* TO BE VERIFIED PARAPET WALLS
REMARKS
*VERIFY FINISH OF
CERAMIC TILES

*VERIFY FINISH OF
CERAMIC TILES

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

REMARKS
* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES


* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

*PAINT TO BE VERIFIED

REMARKS
* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES

* VERIFY TYPE OF TILES


*PAINT TO BE VERIFIED

REMARKS

*PAINT TO BE VERIFIED
WATERPROOFING SCHEDULE AN
Item Material Additional Materials Approved Equal
No.
A. CAPILLARY WATERPROOFING (Surface-Applied)
Specserv/Hitchins Formdex Plus
Bostic Boscocem Slurry
Tremco Permaquik 200
Specserv/Hitchins Formdex
Admix
1
Pioneer ETL (Epoxy Tank
Lining
Bentonite Waterproofing,
Volclay Voltex Ds/Cetco
(EEI) or Nuraprufe 415
(Specserv/Hitchins)
Specserv/Hitchins Formdex Plus
Bostic Boscocem Slurry
Tremco Permaquik 200
Specserv/Hitchins Formdex
2 Admix

Bentonite Waterproofing,
Volclay Voltex Ds/Cetco
(EEI) or Nuraprufe 415
(Specserv/Hitchins)
3
Specserv/Hitchins Formdex Plus
Specserv/Hitchins Formdex Plus
Bostic Boscocem Slurry
4

Tremco Permaquik 200

Bentonite Waterproofing,
5 Volclay Voltex Ds/Cetco
(EEI) or Nuraprufe 415
Specserv/Hitchins Formdex Uniflex (Specserv/Hitchins)
6
Specserv/Hitchins Formdex Uniflex
7 Specserv/Hitchins Formdex Plus
B. CRYSTALLINE CONCRETE WATERPROOFING (Surface-Applied)

Specserv/Hitchins Formdex Plus


Specserv/Hitchins Formdex
Admix
Pioneer ETL (Epoxy Tank
Lining

1
Bentonite Waterproofing,
Volclay Voltex Ds/Cetco
(EEI) or Nuraprufe 415
1 (Specserv/Hitchins)

Specserv/Hitchins Formdex Plus


Specserv/Hitchins Formdex
Admix

Bentonite Waterproofing,
Volclay Voltex Ds/Cetco
(EEI) or Nuraprufe 415
2 (Specserv/Hitchins)
Specserv/Hitchins Formdex Plus
Specserv/Hitchins Formdex
Admix

Bentonite Waterproofing,
Volclay Voltex Ds/Cetco
(EEI) or Nuraprufe 415
3 (Specserv/Hitchins)
C. BENTONITE WATERPROOFING

Voltex Volclay DS/Cetco (EEI)


1 Nuraprufe 415 (Specserv/Hitchins)
Voltex Volclay DS/Cetco (EEI)

2 Nuraprufe 415 (Specserv/Hitchins)


Voltex Volclay DS/Cetco (EEI)

3 Nuraprufe 415 (Specserv/Hitchins)


Voltex Volclay DS/Cetco (EEI)
4 Nuraprufe 415 (Specserv/Hitchins)
C. FLUID APPLIED WATERPROOFING

Formak 629 (Hitchkins/Specserv) elastomeric waterproofing

Specserv/Hitchins Formdex Uniflex

Specserv/Hitchins Formdex
Admix
2

50mm Thermal Insulator verify brand


2

Hitcins/Specserv Exposed Type PU WP w/ silica sand and broadcast

3
w/ fabric reinf. And silica
Formak 629 (Hitchkins/Specserv) sand elastomeric waterproofing
Nuraplan SF-12 (Hitchins/Specserv)
4
Specserv/Hitchins Formdex Plus Capillary/Cementitious WP

apply abrasion resistant wp


5 Traffigard (Hitchins/Specserv) as final coat
WATERPROOFING SCHEDULE AND MONITORING (Summary) as of June 04, 2018

Location Location as per Plan Locations as per BOQ Submittals Submitted

a. Desalination Plant Cistern Pits Central Domestic Water


(Rain Water Tank, Fire Reserve WT,
Storage,Water Elev Sump Pits, (Neg&Pos
Infiltration Plan,Water Appplication), Oil
Tank) Interceptor/Centralize
Grease Trap/Trench
Drains/Scoop Deck
Drains, Mech, Genset,
LVSG, Transformer Rm, EE
negative application Rm, Pump Rm, Other
25mm thick Wet Areas

b. Elevator & Escalator Elevator Pits


Sump pits

Central Domestic Water


Tank, Fire reserve WT
Lining

negative application
25mm thick

c. Centralized Grease
Trap/Trench Drain

d. MEC/Genset Room/
Transformer Room/ Genset/Transformer/Pum
Exposed or With Areas p Room/Mechanical
Above Room

e. EE Room Flooring of EE room


f. Swimming Pool/
Water Feature
g. Double Slab N/A

a. RC Domestic
Water/Gray Water &
Fire Water Tanks
(underground &
overhead)

Cistern Tank
negative application
25mm thick

b. Drainage Sump Pits


(DSP)/Sewage Pits
(SP)/Grease Trap

negative application
25mm thick

a. Elevator Pits Elevator Pits

negative application
25mm thick

a. Lower Ground
Earthside Walls
(exterior or positive
application)
b. Underground
Cistern Tanks, STP,
(exterior or positive
application)
Cistern Tanks
Blanket Layout before
pouring Lower Ground
Slab
Lower Ground Slab
Elevator Pits
Elevator Pits

Balconies, Toilets,
Washer/Dryer, Decks, Top
slab of domestic water
and fire reserve tank,
a. Balconies Balconies Other Wet areas

b. Roofdecks, Open Roof Decks, Amenity


Decks, Pool Decks Level

Roof Decks
Roof Decks, Amenity
Level

Planters, Lawns, Gardens,


Treepits, Daytanks, Conc
c. Planters, Lawns, Planters, Lawns, Gardens, fins/ledges, Other wet
Gardens, Treepits Treepits areas

d. Daytanks Daytanks

e. Concte Fins/ ACCU


Ledges ACCU Ledges
Approval Status Other Notes References

Please see specs


for additional
procedure

Please see specs


for additional
procedure
Please see specs
for additional
procedure

Please see specs


for additional
procedure

Please see specs


for additional
procedure

If more than
50mm use
welded wire
fabric

If more than
50mm use
welded wire
fabric
W/ 50mm
Thermal
Insulation
see for
residential
07200
see
specifications
for additional
procedure

see
specifications
for additional
procedure

negative
application

see
specifications
for additional
procedure
T

Item Original Material Legend Revised Material Size & Type as per ID 001
No.

600x600 Homogenous Floor Tiles 600X600 Porcelain FT, Polished


Polished Carara Beige (COH)
1 HT2A

600x600 Homogenous Wall Tiles 600x600 Porcelain WT, Matte


Polished Finish, IMB1648 (COH)
2 HT3A

300x600 Homogenous Wall Tile in 300x600 Porcelain WT, Matte


Polished Wall Tile; IMB1648 (COH)
3 HT3B
100x600 Homogenous Accent
Wall Tile in Matte Finish; 100x600 Porcelain Accent WT, Matte
SKL66667 Lombardo (White
Horse)
4 HT4
600x600 Homogenous Wall Tile in
Matte Finish; H60040 Udine 600X600 Porcelain FT, Matte
5 (White Horse) HT5

600x600 Homogenous Wall Tile in


Polished Finish; DCR666017N 150X600 Porcelain WT, Polished
Duomo (White Horse)
6 HT6
8 CT1 300x300 Ceramic FT, Semi Gloss
9 CT2 300x300 Ceramic FT, Semi Gloss
10 - - 300x300 Ceramic FT, Matte
11 - - 300x300 Ceramic WT, Semi Gloss
12 - - 300x300 Ceramic FT, Semi Gloss

LAM

PL6 HPL; GWD 5540 Smoked


Walnut/ PT3 Acrylic Latex Paint;
1 PL1 High Performance Laminate
DE6399 Molasses LRV9 (Dunn
Edwards)

PTD 4 Textured Decorative paint;


2 Decore Classic 1/4 Toner B4730 PL3 High Performance Laminate
(Boysen); 4mm thk Facial Mirror

3 PL4 HPL; MTS 3267 Swanky PL4 High Performance Laminate


Woods (New Mika)
PL5 HPL; DP2901HG Cream Onde
4 PL5 High Performance Laminate
(EDL Laminates)
PA

PT1A - Acrylic Flat Latex; DE6358


1 PT1A Acrylic Latex Paint, Flat
Vapor LRV76 (Dunn Edwards)

PT1B Acrylic Semi Gloss Latex


2 DE6358 Vapor LRV76 (Dunn PT1B Acrylic Latex Paint, Semi Gloss
Edwards)

CT2 100x300 Ceramic Tile; Mikado


3 PT2 Acrylic Latex Paint (Flat or Semi Gloss?)
Gray MS4124 (COH)

4 PT6 Acrylic Latex Paint, Satin


TILE SCHEDULE AND MONITORING (Summary) as of June 04, 2018 (UPDATED)

Color Approved Brand/ Supplier Location as per Plan

Lobby, Elevator Lobby, Reception


LUXE ZAJRE WHITE MICRO CRYSTAL Arkisolutions Area, Mail Area

LUXE LT1606M CARRARA Arkisolutions Elevator Wall Opening

LUXE LT1606M CARRARA Arkisolutions Elevator Wall Opening

FINO YB66311 BLACK SLATE Arkisolutions Elevator Wall Opening

PTD60R3 POWDER MOCHA Arkisolutions Toilet

FINO BSR06302G Arkisolutions Baseboard Toilet

WHITE 4730 COH Hallway, Elevator Lobby


MIKADO GREY MS4124 COH Hallway, Elevator Lobby
to be rfi - Units Toilet
to be rfi - Units Toilet
to be rfi - Units Flooring Interior

LAMINATES SCHEDULE AND MONITORING (Summary) as of June 04, 2018 (UPDATED)

Vanity Counter, Reception


PLUSH ANEGRE GWK5039 Green Laminates Counter

BLACK SILVER GM9209 (w/ Chiseled Wood Reception Counter, Elevator Wall
Green Laminates
3332) Opening

CHISELED WOOD 3332 New Mika Laminates Elevator Wall Opening

WOOL WBR 107 New Mika Laminates Elevator Car Ceiling


PAINTS SCHEDULE AND MONITORING (Summary) as of June 04, 2018 (UPDATED)

Ceiling of Lobby, Elev Lobby, Mail


SUGAR DUST FLAT (011) Boysen Area, Toilet, Typical Hallway 2nd
to 17th

Wall of Lobby, Elev Lobby, Mail


SUGAR DUST FLAT (011) Boysen Area,Toilet, Typical Hallway 2nd
to 17th

Baseboard of Lobby, Elev Lobby,


GRAY GOWN (0239) Boysen Mail Area,Toilet, Typical Hallway
2nd to 17th
SMOKEY TONE (0541) Boysen Additional Mat: Feature Wall
TED)

ocation as per Plan Submittals Submitted Approval Status Other Notes

Ground Floor

Ground Floor

Ground Floor

Ground Floor

Ground Floor

Ground Floor

2nd to 17th Floor


2nd to 17th Floor `
2nd to 17th Floor
2nd to 17th Floor
2nd to 17th Floor

PDATED)

Toilet, Reception at Ground


Floor

Reception Ground, 2nd to


17th

2nd to 17th

Ground to 17th
ATED)

Ground, 2nd-17th

Ground, 2nd-17th

Ground, 2nd-17th

Ground
References

ID.GF.503/504

ID.GF.503
GLASS SCHEDULE AND MONITORING (

Revised Material Size & Type as


Item No. Original Material Legend Color
per ID 001

6mm thk Mirror on 12mm thk


1 GL1 Marine Plywood Backing
6mm thk Back Painted Glass in
Exhanged with Metallic Finish (Graphicote Msil)
2 GL2
PL1 of location on 12mm thk Marine Plywood
Backing w/ 25mm bevel thickness
STONE FINISH SCHEDULE AND MONITORIN

1 ST1 12mm thk Natural Stone BLACK GALAXY

2 ST2 12mm thk Natural Stone VOLAKAS WHITE

STAINLESS STEEL SCHEDULE AND MONITOR

1 SS1

CEILING SCHEDULE AND MONITORING

1 CF-01
Acoustic Ceiling Board in T-runner 600x600mm
2 CF-02
Acoustic Ceiling Board in T-runner 10mm thk
GLASS SCHEDULE AND MONITORING (Summary) as of June 04, 2018 (UPDATED)

Approved Brand/ Location as per Plan Submittals Submitted Approval


Supplier

Pacific Glass Corp Facial Mirror Vanity


Counter/Toilet/Ground

Elevator Car
Pacific Glass Corp Interior Elevator Car
Finish

ONE FINISH SCHEDULE AND MONITORING (Summary) as of June 04, 2018 (UPDATED)

Philippine Granite Stone


Corp

Philippine Granite Stone Vanity Toilet/Ground


Corp Counter

NLESS STEEL SCHEDULE AND MONITORING (Summary) as of June 04, 2018 (UPDATED)

CEILING SCHEDULE AND MONITORING (Summary) as of June 04, 2018 (UPDATED)

Gyroproc or Skycon
Status Other Notes References

w/ 20mm thk
Marine Plywood
substrate
w/ 20mm thk
Marine Plywood ID.GF.502/503
substrate
TABULATION OF PILE CAP

AS PER VALUE ENGINEERING (CAD AS PER LATEST REVISED


ITEM QTY FILE) (March 14, 2018) STRUCTURAL (June 04, 2018) Remarks
t (mm) w (mm) l (mm) t (mm) w (mm) l (mm)
PC1 3 1200 2000 5000 1200 2000 5000
PC2 3 1200 4100 4100 1200 4100 4100
PC3 2 1200 4100 4100 1200 4100 4100
PC4 2 1300 4800 10800 1300 4800 10800
PC5 2 1200 2000 5000 1200 2000 5000
PC6 2 1200 2000 5000 1400 2000 5000
PC7 1 1200 2555 5000 1300 2550 5000
PC8 1 1200 1800 5200 1600 1800 5200
PC9 1 700 8115 13195 700 8115 13195
PC10 2 1200 1600 1600 1200 1600 1600
PC11 2- - - 2000 1600 1600
PCSW1 1 2300 8600 16800 2400 8600 16800
PCSW2 1 2700 18600 29400 3100 18600 29400
ITEM NO. SRF No. BRAND MATERIAL DESCRIPTION LOCATION

1 004 Redwood 10EC Termiticide Tower C & MRF


2 010 Jackbilt 4" & 6" CHB (700psi) Tower C & MRF

3 106 Izumi Anchor Bolt Tower C & MRF


4 100 Sparkton PE Sheet (8 mils) Tower C
Non Shrink & Non Metallic Cement
5 113 Spark Grout Tower C
Non extruding type concrete joint
6 114 Sparkfil-KF filler Tower C

Sparkmix Epoxy-
7 118 CBE All purpose bonding epoxy Tower C & MRF
8 153 Philmetal Rib Type Long Span Roofing Tower C & MRF
MATERIAL SUBMITTAL TABULATION
SUBMITTED
LOCATION Technical
DateSubmitted by Date Received by Physical Sample/ Specifications/
BSPCI EELHI Sample Board Description
Soil Reticulation 28-May-18 28-May-18 ●
Concrete Masonry 8-May-18 9-May-18

Truss connection 16-May-18 16-May-18 ●


Damproofing 2-May-18 2-May-18 ● ●
For anchorage of structural
member 8-May-18 9-May-18
For contraction &
construction joints 8-May-18 9-May-18

For bonding opf old


concrete & fresh concrete 10-May-18 11-May-18
Roofing 7-Jun-18 - ●
TAL TABULATION
SUBMITTED

Product/Manufacturer's Manufacturer's/Mill Anti Reticulation


Company Profile Data/ Brochure Shop Drawings Certificate System Detail Plan
● ● ● ● ●
● ● ●

● ●

● ●

● ●

● ●

APPROVED DATE REMARKS
Letter for Alternative
Brand
● - Pending
21-May-18 Approved
Disapprove (for
18-May-18 resubmission)
18-May-18 Approved

18-May-18 Approved

1-Jun-18 Approved

21-May-18 Approved
- Pending