REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE REGIONAL DIRECTOR
NEGROS ISLAND REGION ( NIR )
( INTERIM - OFFICE )
CANGMATING, SIBULAN, NEGROS ORIENTAL

REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED


NATIONAL ROADS INCLUDING DRAINAGE ALONG
JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD
K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594;
K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134
SAGAY CITY, NEGROS OCCIDENTAL

SECTION ID = S00019NR
NET LENGTH = 3.55 KM
WIDTH = 6.10 METERS ( SECTION 1 & 8 )
7.32 METERS ( SECTION 2 )
6.70 METERS ( SECTION 3, 4, 5, 6, 7 & 9 )
THICKNESS = 0.28 METERS
INDEX OF SHEETS:
NO. SHEET CONTENTS
1 LAY OUT PLAN, VICINITY MAP & INDEX OF SHEETS N

2 TYPICAL ROAD SECTION DETAIL

GROUTED RIPRAP DETAIL W E


ELEVATION DETAILS OF WEEPHOLES

OPEN LINED CANAL DETAIL


S
3 THERMOPLASTIC PAVEMENT MARKINGS DETAIL
LUZON
SUMMARY OF QUANTITIES

PAVEMENT DESIGN PARAMETER BEGINNING OF PROJECT


BEGINNING OF SECTION 1 END OF SECTION 1
STA. 84+002.54 ( K0084+000 )
GENERAL NOTES STA. 83+714.00 ( K0084+(-286) )

SPECIFICATIONS

SCHEDULE OF ITEMS

ea
4 ROAD GEOMETRIC DESIGN HORIZONTAL & VERTICAL CURVES

eS

Pac
pin
5 SUPERELEVATION & PAVEMENT WIDENING

ilip
L A Y - O U T P L A N

ific
Ph
( SECTION 1 )
6 STANDARD PLAN OF PORTLAND CEMENT CONCRETE PAVEMENT

Oc
t
es
SCALE 1 : 2,000 M.

ean
W
7 STANDARD PLAN OF METAL GUARDRAIL

10 - 17 PLAN AND PROFILE

18 - 37 CROSS - SECTION
VISAYAS

BEGINNING OF SECTION 2
END OF SECTION 1 BEGINNING OF SECTION 3
STA. 85+848.00 ( K0085+848 ) END OF SECTION 3
STA. 85+992.57 ( K0086+000 ) STA. 99+800.00 ( K0099+798 ) STA. 100+309.75 ( K0100+234 )
Project Site

MINDANAO

L A Y - O U T P L A N
( SECTION 3 )
SCALE 1 : 3,000 M.
L A Y - O U T P L A N
( SECTION 2 ) LOCATION MAP
SCALE 1 : 1,000 M.

Manapla Cadiz City

Sagay City
Victorias City
Escalante City

Silay City
BEGINNING OF SECTION 4 END OF SECTION 4 BEGINNING OF SECTION 5 END OF SECTION 5 BEGINNING OF SECTION 6 END OF SECTION 6 Talisay City
STA. 103+080.58 ( K0103+000 ) STA. 105+480.00 ( K0105+490 ) STA. 105+585.18 ( K0105+594 ) Negros Occidental 1st DEO
STA. 102+462.00 ( K0102+462 ) STA. 104+000.00 ( K0104+000 ) STA. 105+388.84 ( K0105+320 ) Toboso
Bacolod City
Bacolod City DEO
Murcia
Bago City
Salvador Benedicto
Calatrava
The Site
Pulupandan
San Carlos City
Valladolid Negros Occidental 4th DEO
San Enrique
La Carlota
Pontevedra
La Castellana Canlaon Vallehermoso
L A Y - O U T P L A N L A Y - O U T P L A N Moises Padilla
Hinigaran
( SECTION 5 ) ( SECTION 6 ) (Magallon)

L A Y - O U T P L A N Isabela
SCALE 1 : 10,000 M. SCALE 1 : 1,000 M. Binalbagan
( SECTION 4 ) Negros Occidental 2nd DEO

Himamaylan Guihulngan City


SCALE 1 : 4,000 M.

Ilog Negros Oriental 1st DEO


La Libertad
Kabankalan City Jimalalud
Cauayan

DE S
AL
Tayasan

CI RO
NT
OC NEG
Ayungon

Candoni
END OF PROJECT Bindoy (Payabon)
BEGINNING OF SECTION 7 Sipalay City
END OF SECTION 7 BEGINNING OF SECTION 8 END OF SECTION 8 BEGINNING OF SECTION 9 Negros Occidental 3rd DEO Mabinay
STA. 108+044.00 ( K0108+044 ) STA. 108+272.65 ( K0108+275 ) STA. 108+630.00 ( K0108+630 )
END OF SECTION 9
STA. 108+753.17 ( K0108+698 ) STA. 115+990.70 ( K0116+(-9.30)) Manjuyod
( BUG-ANG BR. ABUT. "A" ) STA. 116+133.97 ( K0116+134 )
Hinoba-an (Asia)
Bais City

IEN OS
Tanjay City
Kalumboyan

L
TA
OR EGR
Pamplona
Amlan (Ayuquitan)

N
San Jose
Basay
Negros Oriental 2nd DEO Sibulan
Bayawan City
(Tulong) Santa Catalina Dumaguete City
Valencia
(Luzurriaga)
Bacong
L A Y - O U T P L A N L A Y - O U T P L A N L A Y - O U T P L A N Negros Oriental 3rd DEO
Dauin
( SECTION 7 ) ( SECTION 8 ) ( SECTION 9 )
Siaton Zamboanguita
SCALE 1 : 2,000 M. SCALE 1 : 1,000 M. SCALE 1 : 1,000 M.

VICINITY MAP
SURVEYED & PREPARED:
REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594; LAYOUT PLAN & STEPHEN B. ABASTILLAS 1
ENGINEER III
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134 AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
VICINITY MAP CHECKED:
( INTERIM - OFFICE ) CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION
0
0.1
SPECIFICATION :

NS
LA
NP
1. SAFETY ON THE PROJECT

0
0.1
NO
REFLECTORIZED PAVEMENT MARKINGS ( WHITE ) IF THE ENGINEER ASSIGNED IN THE PROJECT NOTICES ANYTHING ON

OW
100mm WIDTH THE SITE THAT IS CONSIDERED UNSAFE, A SITE INSTRUCTION

0.10
5
SH

5
0.1
0.1
SHOULD IMMEDIATELY BE GIVEN TO THE CONTRACTOR REGARDING

AS
EDGE OF PAVEMENT THIS MATTER THAT COULD CAUSE SAFETY PROBLEMS, SUCH AS:

TH
WID

WIDTH AS SHOWN ON PLANS


0
A. HINDRANCES TO THE TRAFFIC FLOW, IF NEEDED THE

0.1

0.10
SHOULDER SHOULD BE USED SO THAT TWO WAY TRAFFIC
3.00 6.00 3.00 6.00 3.00 CAN BE MAINTAINED.

0
B. LACK OF TRAFFIC CONTROL ( STOP / GO BOARD )

0.15
0.1
C. INADEQUATE WARNING SIGNS FOR THE ROAD USERS
REFLECTORIZED PAVEMENT MARKINGS ( YELLOW ) REFLECTORIZED PAVEMENT MARKINGS

0.10
150mm WIDTH FOR HORIZONTAL CURVE ( WHITE ) 150mm WIDTH
D. IMPROPER USE OF EQUIPMENT THAT POSE DANGER

E. EXCAVATION THAT IS NOT PROPERLY BARRICADED AND


EDGE OF PAVEMENT LIGHTED DURING NIGHT TIME.

0.10
REFLECTORIZED PAVEMENT MARKINGS ( WHITE ) F. THE CONTRACTOR IS RESPONSIBLE FOR ALL ROAD SAFETY
100mm WIDTH DEVICES / ARRANGEMENT ON THE JOB SITE, THIS INCLUDES
SIGNAGES, LIGHTING AND OTHER ROAD SAFETY DEVICES
REQUIRED TO WARN AND PROTECT ROAD USERS.

2. QUALITY CONTROL
TYPICAL THERMOPLASTIC PAVEMENT MARKINGS DETAIL SUBSTANDARD MATERIALS WILL RESULT IN SUB STANDARD
SCALE N.T.S. WORK. THE RESPONSIBILITY FOR TESTING AND ACCEPTANCE LIES
FULLY WITH THE CONTRACTOR, AND IT IS THE RESPONSIBILITY OF
THE MATERIALS ENGINEER TO OVERSEE ALL TESTING AND TO
ENSURE THAT THE TESTS COMPLY WITH THE SPECIFICATIONS AND
PROCEDURES.

3. LOCATION OF PUBLIC UTILITIES

BEFORE THE CONTRACTOR BEGINS ANY EXCAVATION BELOW


EXISTING GROUND PARTICULARLY ADJACENT TO THE EXISTING ROAD
AND PROPERTIES. THE UTILITY AUTHORITIES SHOULD BE GIVEN
ADVANCED NOTICES AND SITE INSPECTION SHOULD BE ARRANGED
AND THE SAME APPLIES TO HEAVY EQUIPMENT CROSSING THE ROAD.

4. EXCAVATION

UNSUITABLE MATERIALS THAT MAY BE ENCOUNTERED DURING


THE EXCAVATION. SHOULD BE REMOVED TO THE SATISFACTION OF
THE PROJECT ENGINEER. PHOTOGRAPHS SHOULD BE TAKEN
BEFORE REPLACEMENT OF EXCAVATION MATERIALS AND SHALL BE
MEASURED AND AGREED BY BOTH PARTIES. THE CONTRACTOR AND
THE PROJECT ENGINEER. THE VOLUME SHOULD BE RECORDED IN A
LOG BOOK FOR RECORD PURPOSES. EXCAVATED MATERIALS SHOULD
BE REMOVED FROM THE CONSTRUCTION SITE. THE HAULING AND THE
DISPOSAL IS WITHIN THE AUTHORITY OF THE PROJECT ENGINEER.

5. PAVEMENT

ANY ITEM OF WORK REFLECTED ON THE PLANS / CONTRACT


SUCH AS CLEARING & GRUBBING, SUB - GRADE PREPARATION, BASE
MATERIALS PREPARATION. PCCP AND RIPRAP SHOULD CONFORM WITH
THE 2004 DPWH STANDARD SPECIFICATION WHICH IS THE BASES OF
REFERENCE IN ANY CONSTRUCTION ACTIVITIES.

6. RIPRAP AND GROUTED RIPRAP

A. FOOTING SHALL BE CARRIED DOWN TO A FIRM FOUNDATION


AS DIRECTED BY THE ENGINEER.

B. CLASS "A" CONCRETE SHALL BE USED.

C. MORTAR TO BE ONE (1) PART CEMENT AND THREE (3) PARTS


SAND.

NOTE: D. MORTAR JOINTS 2 1/2 CM TO 4 CM.

E. THE STONES SHALL NOT BE LESS THAN 15 KGS. IN WEIGHT


QUANTITIES ARE SUBJECT TO INCREASE / DECREASE, DEPENDING AND LAID OFF TO THE LINES AND DIMENSION REQUIRED.
UPON THE RESULT OF JOINT FINAL INSTRUMENT SURVEY.
7. STONE MASONRY

A. STONES... THE STONE SHALL BE CLEAN, HARD & DURABLE &


SHALL BE SUBJECT TO ENGINEERS APPROVAL. STONES
SHOULD HAVE A THICKNESS OF NOT LESS THAN 150 mm. AND
WIDTHS OF NOT LESS THAN ONE & ONE- HALF TIMES THEIR
RESPECTIVE THICKNESS, AND LENGTHS OF NOT LESS THAN
ONE AND ONE-HALF TIMES THEIR RESPECTIVE WIDTHS. FACE
STONES SHALL BE DRESSED TO PROVIDE BED & JOINT LINES
THAT DO NOT VARY MORE THAN 20mm FROM THE TRUE LINES
& TO ENSURE THE MEETING OF BED JOINT LINES WITHOUT
THE ROUNDING OF THE CORNERS OF THE STONES IN
GENERAL NOTES EXCESS OF 30mm IN RADIUS. FACE STONES SHALL BE
PITCHED TO THE LINE ALONG THE BEDS 7 JOINTS THE
MAXIMUM PROJECTION OF THE ROCK FACES BEYOND THE
1. ALL DIMENSION SHOWN IN PLAN ARE IN METERS EXCEPT AS NOTED. PITCH LINES SHALL NOT BE MORE THAN 50 mm.

2. HORIZONTAL AND VERTICAL CONTROL ARE ALL ASSUMED AND B. MORTAR... THE MORTAR FOR THE MASONRY SHALL BE
ESTABLISHED DURING THE SURVEY. COMPOSED OF ONE PART OF PORTLAND CEMENT AND TWO
PARTS OF FINE AGGREGATES.
3. CURVED COMPUTATION ARE BASED ON HORIZONTAL AND VERTICAL
GEOMETRY. C. THE BASE SHALL BE CARRIED DOWN TO A FIRM FOUNDATION
AS DIRECTED BY THE ENGINEER.
4. THE ORIGINAL GROUND AND FINISHED GRADE ELEVATION REFERS TO
7. ROAD MARKINGS ( THERMOPLASTIC )
THE EXISTING AND PROPOSED ELEVATION OF THE ROAD CENTERLINE
PROFILE. THE FINISHED GRADE IS ALSO THE ELEVATION OF THE CENTER- A. THE PROJECT ENGINEER SHOULD VERIFY FROM THE BILL
LINE AS SHOWN IN THE TYPICAL CROSS SECTION. OF QUANTITIES THE TYPE OF ROAD MARKINGS THAT IS
REQUIRED WHETHER CONTINUOUS OR BROKEN. THE
5. FOR SUPER ELEVATION, CURVE WIDENING OR HORIZONTAL TRANSITION DIMENSIONS, COLORS AND MATERIALS TYPE SHOULD
REFER TO TABLE FOR SUPER ELEVATION DEVELOPMENT FOR ROAD CONFORM TO THE SPECIFICATION PRESCRIBED IN THE BLUE
SAFETY DESIGN MANUAL. BOOK 2004 EDITION.

B. THE PROJECT ENGINEER SHOULD CHECK WITH THE


6. SLOPE PROTECTION SHALL BE PROVIDED IN AREAS INDICATED ON THE
LABORATORY TO ENSURE THAT THE TYPE OF MATERIALS IS
PLANS IN ACCORDANCE WITH DETAILS SHOWN IN THE DRAWING. CORRECT AND HAS BEEN APPROVED.

7. ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATIONS FOR C. PRE - MARKING SHOULD BE CAREFULLY CARRIED OUT BY
HIGHWAYS, BRIDGES AND AIRPORTS, 2013 EDITION. THE CONTRACTOR AND CHECKED AND APPROVED BY THE
PROJECT ENGINEER BEFORE LAYING ON THE ROAD
8. DESIGN WAS BASED ON THE DATA SUBMITTED BY THE SURVEY TEAM OF MARKINGS TO START.
PLANNING AND DESIGN DIVISION OF DPWH, NEGROS ISLAND REGION
D. PRE - MARKING IS NORMALLY CARRIED OUT BY SURVEY
(NIR), REGIONAL OFFICE.
INSTRUMENT ON STRAIGHT SECTIONS AND BY A ROPE
LINE ON A CURVE. THE PROPOSED ALIGNMENT SHOULD BE
9. THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS AND MARKED W/ PAINTS SPOTS ON THE PAVEMENT SURFACE FOR
PROVIDE ACCESSIBILITY FACILITIES FOR PERSONS WITH DISABILITY IN THE MACHINE TO FOLLOW.
ACCORDANCE WITH D.O. 37 SERIES OF 2009.

SURVEYED & PREPARED:


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD THERMOPLASTIC PAVEMENT MARKINGS DETAIL DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594;
SUMMARY OF QUANTITIES
PAVEMENT DESIGN PARAMETER STEPHEN B. ABASTILLAS 3
ENGINEER III
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134 GENERAL NOTES CHECKED: AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
( INTERIM - OFFICE ) SPECIFICATION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL SCHEDULE OF ITEMS JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION
FORMULA :

LEGEND :

HORIZONTAL CURVE (CIRCULAR)


SCALE NTS
LEGEND :

NOTE :

IN ANY SYMMETRICAL VERTICAL PARABOLIC CURVE

FORMULA :

LEGEND :

SYMMETRICAL VERTICAL PARABOLIC CURVE


SCALE NTS

IN ANY UNSYMMETRICAL VERTICAL


PARABOLIC CURVE

FORMULA :

LEGEND :

UNSYMMETRICAL VERTICAL PARABOLIC CURVE


SCALE NTS

DESIGN CONTROLS VERTICAL CURVES


SCALE NTS

SURVEYED & PREPARED:


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594; ROAD GEOMETRIC DESIGN STEPHEN B. ABASTILLAS 4
ENGINEER III
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134 HORIZONTAL & VERTICAL CURVES CHECKED: AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
( INTERIM - OFFICE ) CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION
TRANSITION: STRAIGHT-CIRCULAR CURVE CASE 1

TRANSITION: CIRCULAR CURVE-STRAIGHT-CIRCULAR CURVE CASE 2

Ln

WIDENING ON HORIZONTAL SIMPLE CURVE

TRANSITION: CIRCULAR CURVE-MINIMUM STRAIGHT-CIRCULAR CURVE CASE 3

TRANSITION: CIRCULAR CURVE-CIRCULAR CURVE CASE 4

SURVEYED & PREPARED:


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594; SUPERELEVATION & STEPHEN B. ABASTILLAS 5
ENGINEER III
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134 AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
PAVEMENT WIDENING CHECKED:
( INTERIM - OFFICE ) CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION
1D 1F

1B
1C

NOTE:
1L 1K

1F

NOTE:

PLAN
1J ( SHOWING FLARING OF EXISTING CONCRETE PAVEMENT )
SCALE 1 : 50 M

1A TYPICAL PLAN OF A TWO LANE PAVEMENT


NOT TO SCALE

1B DETAIL "A"
SCALE 1 : 10 M

1G SECTION I 1K S E C T I O N 1L S E C T I O N WHERE:
SCALE 1 : 40 M

1C DETAIL "B"
SCALE 1 : 10 M

CONTRACTION JOINT CONSTRUCTION JOINT

1H SECTION II
SCALE 1 : 40 M

DETAIL OF EXPANSION JOINT (DOWELLED) AT


1D DETAIL "C" CERTAIN INTERSECTIONS AND STRUCTURES
SCALE 1 : 10 M

GENERAL NOTES :

DETAIL OF BAR SPACING


ALONG CURVES

1E DETAIL "D" WOODEN SIDE FORM WOODEN/METAL SIDE FORM METAL SIDE FORM
SCALE 1 : 10 M

DETAIL OF SIDE FORMS

1I DETAILS OF JOINTS IN RIGID PAVEMENT


SCALE NTS

1F S E C T I O N STANDARD PLAN OF PORTLAND CEMENT CONCRETE PAVEMENT


SCALE 1 : 10 M

SURVEYED & PREPARED:


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594;
STANDARD PLAN OF STEPHEN B. ABASTILLAS 6
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134
PORTLAND CEMENT CHECKED:
ENGINEER III
AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
( INTERIM - OFFICE ) CONCRETE PAVEMENT CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION
100 100
2300 2300

260

180

180
1000

1000
700

1700

700
100

180

50

260
50
40
1000

540

100

100

130
EMBEDDED

254
700

100

130
76

302

SURVEYED & PREPARED:


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594; STANDARD PLAN OF STEPHEN B. ABASTILLAS 7
ENGINEER III
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134 AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
METAL GUARDRAIL CHECKED:
( INTERIM - OFFICE ) CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION
BEGINNING OF PROJECT
END OF SECTION 1
BEGINNING OF SECTION 1
STA. 84+002.54 ( K0084+000 )
STA. 83+714.00 ( K0084+(-286) )

H O U S E S

0
49.0
50
.00 51
49.00 .00

49.00
48.00 42.00 44.00 48.00

50
46.00 48.00

0
46.00

0
0

42.0

.0
48.0
43.0
45.0

44.0
46.0

51.0
0
0

0
H O U S E S

75.000

70.000

65.000

60.000
ELEVATION

55.000

50.000

45.000

40.000

-15.000
35.000
STATION 83+714.00 83+800.00 83+900.00 84+002.54

EXISTING GROUND (L/S)

EXISTING GROUND (C/L)

EXISTING GROUND (R/S)

VERTICAL CURVATURE * TO FOLLOW EXISTING VERTICAL CURVATURE

HORIZONTAL CURVATURE * TO FOLLOW EXISTING HORIZONTAL CURVATURE

SUPERELEVATION * TO FOLLOW EXISTING SUPERELEVATION

WIDENING * TO FOLLOW EXISTING WIDENING

SURVEYED & PREPARED:


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594; STEPHEN B. ABASTILLAS 8
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134
PLAN & PROFILE CHECKED:
ENGINEER III
AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
( INTERIM - OFFICE ) CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION
BEGINNING OF SECTION 2
STA. 85+848.00 ( K0085+848 )

END OF SECTION 1
STA. 85+992.57 ( K0086+000 )

SUGARC
ANE PLAN
TA TION
RICEFIEL
D 50
.0

51
0

.00
0
.0
49

52.00

51.00
50

0
.00 49.00

50.0
48.00
SUGARC
AN E PLANTA
TION

RICEFIELD

70.000

65.000

60.000

55.000
ELEVATION

g=-2.123%
50.000 %
g=2.677

45.000

40.000

35.000

0.000
STATION 85+848.00 85+900.00 85+992.58
52.173

51.918

51.494

51.069

50.644

50.248

50.000

49.997

50.283

FINISHED GRADE

EXISTING GRADE

HORIZONTAL CURVATURE

VERTICAL CURVATURE

NC e=-5.767%
SUPERELEVATION
e=5.767%

WIDENING

SURVEYED & PREPARED:


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594; STEPHEN B. ABASTILLAS 9
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134
PLAN & PROFILE CHECKED:
ENGINEER III
AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
( INTERIM - OFFICE ) CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION
HOU
SES
0 50.0
50.0 0

BEGINNING OF SECTION 3
STA. 99+800.00 ( K0099+798 )
END OF SECTION 3
STA. 100+309.75 ( K0100+234 )
N
ATIO
NT
LA HOU
EP SES
AN
RC
GA SUGA
RCAN
SU E PL

0
ANTATI 0

49.0
ON 49.0 49.00

00 .
49
N HOU
IO SES
AT
A NT
PL
A NE
RC
GA
SU

65.000

60.000

55.000
ELEVATION

50.000 g=0.228% g=-0.265%


g=0.326%
%
g=2.714

45.000

40.000

35.000

30.000
0.000
STATION 99+800.00 99+900.00 100+000.00 100+100.00 100+200.00 100+309.76 100+400.00
48.364

48.907

49.440

49.842

50.078

50.158

50.204

50.249

50.288

50.303

50.293

50.258

50.206

50.153

50.100

50.047

49.994

49.941

49.888

49.835

49.782

49.729

49.686

49.680

49.714

49.777

49.809
FINISHED GRADE

EXISTING GRADE

HORIZONTAL CURVATURE

VERTICAL CURVATURE

NC e=2.385% NC
SUPERELEVATION e=-2.385%

WIDENING

SURVEYED & PREPARED:


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.:
ANNIE P. MEJOGUE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING
DRAINAGE ALONG JCT NATL RD SAGAY - BATO - DIAN - MARCELO - BALEA JCT ROAD DESIGNED:
ENGINEER III

OFFICE OF THE REGIONAL DIRECTOR


K0084+(-286) - K0084+000; K0085+848 - K0086+000; K0099+798 - K0100+234;
K0102+462 - K0103+000; K0104+000 - K0105+320; K0105+490 - K0105+594; STEPHEN B. ABASTILLAS 10
NEGROS ISLAND REGION ( NIR ) K0108+044 - K0108+275; K0108+630 - K0108+698; K0116+(-9.30) - K0116+134
PLAN & PROFILE CHECKED:
ENGINEER III
AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV
( INTERIM - OFFICE ) CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR 37
CANGMATING, SIBULAN, NEGROS ORIENTAL LOCATION: SAGAY CITY, NEGROS OCCIDENTAL JOSE ROY H. LAGON
ASST. CHIEF, PLANNING & DESIGN DIVISION