1 General ............................................ 3

2 Application principles ........................ 3

3 Requirements ........................................ 3

4 Offer and execution


documents ............................................... 4
2 As of: 01/03

Page 3

ZTV-ING - Part 6 Construction Procedures - Section 3 Protection against the effects of weather

1 General - the feasibility of the protective devices


weather conditions
(1) Part 6 Section 3 shall only apply in conjunction with
Part 1 General. to be observed.

(2) Protection against atmospheric agents (5) The interior clearances are on the under
they are stationary or mobile, with tarpaulins or in the protective devices against
or other covers. of the work to be carried out.
gene. vote, with a minimum light height of 2.00 m
must not be fallen below.

2 Use principles (6) The protective devices shall be so designed


precipitation, surface and spray
(1) Protection against atmospheric agents as well as spray from the to be processed
should be designed in such a way that the processing Areas are kept away.
conditions of the materials intended for installation. (7) Water is to be discharged harmless.
fe and material systems can be maintained.
( 8) It may be appropriate to arrive on the mountain
(2) The provisions of occupational safety are Mendes water through an upstream threshold
side
observed. The contractor has all for catch.
Occupational safety required constructions
and execution measures with the (9) The construction under a flexible roof skin
competent authorities. shall be so designed that no water accumulation
occur.
(3) The protective devices against weathering
including additional measures to: (10) The outer skin of the protective device must be
Traffic safety is provided in separate service tear resistant and flame retardant.
identify positions.
(11) Whenthe
especially fixing the outer
pressure and skin,
suction stresses
3 conditions from wind and traffic.
(12) The interior is to be illuminated in such a way that
(1) Protection against atmospheric agents orderly workflow is ensured.
They are so to plan and execute that their
Stability and traffic safety at all times (13) Ensure adequate ventilation. The
are guaranteed, the permissible Ventilation must not lead to a poor performance of
of the affected parts of the structure are not exceeded. lead.
and easy and fast assembly.
(14) Dripping-down of condensate water
ge and feasibility are possible. the surfaces to be treated should be prevented.
(2) For the determination of wind loads, DIN ( 15) A suitable measure against condensation
Technical Report "Actions on Bridges". For example, a double-walled roof
(3) If a load of snow is to be be skin. In case of possible heating, attention must be
NEN, DIN 1055-5 must be used. The th that promoted the formation of condensation
paid
contained therein special regulations for weather can be.
Safeguards and the scheme for simultaneous (16) All constructions are on load-distributing
Consideration of snow load and wind load To file documents.
is notable.
(17) Movable structures are easily
(4) Type, number and dimensions of protective devices
equip common roles for their leadership
directions against the weather are on the load distribution of U-profiles or rails.
Object, the intended execution, the local see are. The roles must be identifiable.
and traffic conditions and the processing
in particular (18) Protective devices may not be inserted in the
Clearance of under-exploited
- the planned daily output,
rich in sweeping equipment. The safety
- the temperature-related downtime, such as conditions for work in the area of overhead line
Heating and curing time, and other electrical overhead lines
to be observed.
- the total construction time,
(19) Insofar as the leadership and security of the
- the traffic conditions,
Traffic and the protection of the protective equipment
against weather conditions are against

As of: 01/03 3

Page 4

ZTV-ING - Part 6 Construction Procedures - Section 3 Protection against the effects of weather

Start-up accidents passive guards


see.
(20) The proper state of passive
Protective devices and other additional
Traffic safety measures are also available
to ensure work-free periods.

4 Offer and Export


management dossier
( 1) The tenderer must submit the template for the submission of tenders.
ge of the graphic representation of the selected
Protective devices against the effects of weather,
if applicable, including heating, ventilation
and lighting equipment with which
to demand a detailed description.
(2) If necessary, the permissible exposure
ments of components (eg support arms)
become.
(3) For the protective devices against
influences are static evidence and
necessary. Included is the
Proof that the resulting additional
the permissible loads of the affected
NEN building parts are not exceeded. is
nothing else in the terms of reference
These documents are issued by a test
nieur tested submitted.
(4) If an examination is to be carried out by a
the test engineer to be appointed.
should be indicated in the terms of reference
that the static evidence and design
plans submitted to the client for examination.
are laying.
(5) The documents examined must be available during the
Construction on site.
(6) Any auxiliary structures for the anchoring
on the building require the approval of the
Client and are with him in good time
Start of construction to vote. Damage to
Building parts should be avoided if possible. Despite-
the required repairs are
contractor at his expense.
men.
(7) The contractor must submit an implementation
in which the conformity of the
Structure of the protective device against weathering
influences with the tested documents
becomes.
(8) If the certificate of conformity
done by the test engineer, this is to be
agree on.
(9) Only after presentation of the execution protocol
may accompany the construction work under or in the protection
be started.