You are on page 1of 2

AAV

AAV

A
QIBL

IV
AAV
AAV
8
IV
8
8

IV

FCU-W-FF-06 FCU-W-FF-05 FCU-W-FF-04 FCU-W-FF-03 FCU-W-FF-07


OMITTED
0.3.14
1. HIGH LEVEL SERVICES SHALL NOT BE INSTALLED ANY LOWER THAN
PRESSURISATION ROOM1
3000mm ABOVE FINISHED FLOOR LEVEL.
STREET LEVEL 2. MINOR BUILDERS-WORK REQUIREMENTS AND FINAL CO-ORDINATION
FCU-W-AG-03 TO BE CARRIED OUT BY THE CONTRACTOR.
FCU-W-AG-08 FCU-W-AG-09 FCU-W-AG-04 FCU-W-AG-05 OMITTED 3. SERVICES TO BE CO-ORDINATED WITH THE CEILING AND ALL
0.3.12b 0.3.13 0.2.1 WASTE 1 SUPPORT SYSTEMS.
0.3.1 MEP MEP Currently shown 4. FINAL LOCATION OF ALL EQUIPMENT TO BE CO-ORDINATED BY THE
ACCESS AREA 1 CORRIDOR 1 CORRIDOR 2 as external CONTRACTOR.
5. AIR VENTS SHALL BE PROVIDED AT ALL HIGH POINTS OF THE
TOP ROOF LEVEL SYSTEM AND DRAIN POINTS AT ALL LOW POINTS OF THE SYSTEM.
TOP ROOF LEVEL 6. EXPANSION AND SUPPORT TO BE DETAILED BY THE CONTRACTOR.
8 8

IV IV

FCU-W-RL-01 FCU-W-RL-02 FCU-W-RL-03


1.3.1b
MEP 1.3.8 1.3.12
CORRIDOR 1 T.B.D T.B.D ROOF LEVEL
BOTTOM ROOF
LEVEL 2.2.11
AAV
AAV T.B.D. 1 OMITTED
FCU-W-CL-38D FCU-W-CL-38E
OMITTED OMITTED

8 8

7
CRAC-040-CHW FCU-W-CL-22A FCU-W-CL-22B CRAC-005-CHW CRAC-004-CHW CRAC-003-CHW CRAC-007-CHW CRAC-007-CHW CRAC-007-CHW FCU-W-CL-100 FCU-W-CL-101 FCU-W-CL-24A FCU-W-CL-24B FCU-W-CL-41 FCU-W-CL-40 FCU-W-CL-98
2.3.14 AAV 2.2.15 2.2.5/2.2.6 2.2.13 1.2.3a 1.1.03d
TCP AHU 01 AAV
2.3.6 2.3.7 2.3.16 2.3.17 TEL 3RD 2.3.18 2.3.12a 2.3.12b BOH STAFF ROOM-M1 / LOCKER BOH PRAYER PUBLIC
MCR 1/2 AHU TCP 1 TEL POLICE TEL QAF PARTIES TEL/IT MAIN BATTERY ROOM BATTERY ROOM CORRIDOR 3 ROOM-M1 CORRIDOR 1 ROOM W TOILET W
WEST TUNNEL COOLING 1A 2A
AHU (BY OTHERS)

2.3.9
ELECTRICAL
ROOM 1
FCU-W-CL-107

6 7
FCU-W-CL-29 FCU-W-CL-31 FCU-W-CL-30
AHU 09 AHU 08
2.3.71 2.2.4 2.2.1 2.2.3
VENTILATION PLANTROOM 1 1ST AID POLICE/QAF GARBAGE 1
8

IV IV
IV

CRAC-008-CHW CRAC-039-CHW FCU-W-CL-34A FCU-W-CL-28 FCU-W-CL-27 FCU-W-CL-26 FCU-W-CL-34 FCU-W-CL-35A FCU-W-CL-23B FCU-W-CL-23 FCU-W-CL-38A FCU-W-CL-39A FCU-W-CL-39B FCU-W-CL-43 FCU-W-CL-25 FCU-W-CL-99
2.3.8 2.3.9 2.3.23 2.2.8/2.2.9 2.2.14 2.1.10 1.1.04d
SPS ENERGY BATTERY GAS SUPPRE- 2.3.20 2.3.19 2.3.24 2.2.12 STAFF ROOM-F1 / STAFF BOH PRAYER PUBLIC
ROOM 1 ROOM 1 SSION 1 T.B.D. A.C.B.S. 1 WASTE 1 T.B.D. 2 LOCKER ROOM F-1 CORRIDOR 2 ROOM M TOILET M
OMITTED
7 6 6
AHU 05 AHU 01 AHU 03 CONCOURSE LEVEL

2.3.11 IV
8
HVAC 1

CRAC-022-CHW CRAC-013-CHW FCU-W-UL-94


4.3.3
4.3.4 4.3.5 ELECTRICAL
SIGNALING 1 TEL/IT 1 ROOM 1
UPPER PLATFORM LEVEL

DD2 (DETAILED)
STATION - THE WHITE PALACE
CHILLED WATER SYSTEMS
DC DC DC
DC DC DC
SCHEMATIC (WEST)
8

CRAC-014A- CRAC-014B- CRAC-041-CHW CRAC-042-CHW FCU-W-UL-95 FCU-W-UL-96 FCU-W-UL-110 FCU-W-UL-111 FCU-W-UL-112


CHW CHW 5.3.31 5.3.3 5.3.5 5.3.6
5.3.2a 5.3.2b TPS BATTERY ELECTRICAL SEWAGE ELECTRICAL 5.3.7
DC TPS 1 DC TPS 1 ROOM ROOM 1 PUMP ROOM 3 ROOM 2 DOMESTIC PUMP & TANK ROOM

UNDER PLATFORM LEVEL P7


7/14/2017 3:27:12 PM
AAV AAV
N

AAV AAV IV
QIBL
A

8
IV IV IV

8 8

FCU-E-FF-02 FCU-E-FF-01 FCU-E-AG-31


0.3.24
0.3.23 MEP
PRESSURISATION ROOM 2 CORRIDOR 4 1. HIGH LEVEL SERVICES SHALL NOT BE INSTALLED ANY LOWER THAN
FCU-E-AG-23 FCU-E-AG-24 FCU-E-AG-25 FCU-E-AG-34 FCU-E-AG-21 FCU-E-AG-22 FCU-E-AG-33 FCU-E-AG-32
BACKUP 3000mm ABOVE FINISHED FLOOR LEVEL.
0.3.34 0.3.32
0.3.35 0.2.3 0.3.37 2. MINOR BUILDERS-WORK REQUIREMENTS AND FINAL CO-ORDINATION
MEP IRRIGATION
PRESSURISATION ROOM 3 WASTE 3 TEL IT STREET LEVEL TO BE CARRIED OUT BY THE CONTRACTOR.
CORRIDOR 7 TANK 2
3. SERVICES TO BE CO-ORDINATED WITH THE CEILING AND ALL
IV SUPPORT SYSTEMS.
8 8
8 4. FINAL LOCATION OF ALL EQUIPMENT TO BE CO-ORDINATED BY THE
IV CONTRACTOR.
5. AIR VENTS SHALL BE PROVIDED AT ALL HIGH POINTS OF THE
SYSTEM AND DRAIN POINTS AT ALL LOW POINTS OF THE SYSTEM.
7 6. EXPANSION AND SUPPORT TO BE DETAILED BY THE CONTRACTOR.
FCU-E-AG-35 FCU-E-CL-17
FCU-E-AG-36
1.3.35
1.EE.15 AHU 11
1.EE.14 VENTILATION
T.B.D 0.EE.9
T.B.D PLANTROOM
TOP ROOF LEVEL REPEATER FIRE
PANEL ROOM FCU-E-AG-02
FCU-E-AG-28 FCU-E-AG-29 0.3.21
FCU-E-AG-03
OMITTED OMITTED MEP
0.3.15 AAV AAV OFFSET AT
MEP ACCESS AREA CORRIDOR 2
BOTTOM
STREET LEVEL ROOF LEVEL
8 TOP ROOF LEVEL

IV
8 OFFSET AT BOTTOM ROOF LEVEL
IV

9 9
FCU-E-CL-29 FCU-E-CL-30 FCU-E-CL-32A FCU-E-CL-22 FCU-E-CL-26 FCU-E-CL-21 FCU-E-CL-25
2.3.70 2.3.69 2.1.19 2.3.20 2.1.17 2.1.20 BOTTOM ROOF LEVEL
SMOKE VENTILATION MEP RETAIL 2.2.21 INFORMATION TRAVEL RETAIL
PLANTROOM CORRIDOR 9 AREA 2 TICKET OFFICE DESK CENTER AREA 1

7
FCU-E-CL-96 CRAC-016-CHW CRAC-021-CHW FCU-E-CL-33 FCU-E-CL-34 FCU-E-CL-35
2.2.22 2.3.40 2.3.72
9 BOH SPS MV 2.3.37 MEP 2.3.73 AHU 10
CORRIDOR 5 ROOM 2 TEL/IT 2 CORRIDOR 10 VENTILATION PLANTROOM
FCU-E-CL-31A FCU-E-CL-31B FCU-E-CL-31C
2.1.21
2.3.71 RETAIL
VENTILATION PLANTROOM AREA 4
IV

10
FCU-E-CL-16B FCU-E-CL-94 FCU-E-CL-95 CRAC-015-CHW FCU-E-CL-19 FCU-E-CL-23 FCU-E-CL-24C FCU-E-CL-24B FCU-E-CL-24A FCU-E-CL-28 CRAC-043-CHW
2.3.42 2.2.21 2.3.40
ELECTRICAL 2.2.17 BOH SPS LV 2.3.43 2.3.46 2.3.35 TCP AHU 02 2.3.34 CRAC-020-CHW FCU-E-PL-73
ROOM 4 STORAGE CORRIDOR 4 ROOM 2 ACBS 2 WASTE 2 7 6 6 AHU TCP 2 MCR 3/4 4.3.10
8 EAST TUNNEL 4.3.9 ELECTRICAL
COOLING AHU TEL/IT 2 ROOM 2
AHU 04 AHU 06 AHU 02 (BY OTHERS) UPPER PLATFORM LEVEL

2.3.44
HVAC 2a

9
FCU-E-CL-16C FCU-E-CL-16D
2.1.18
2.2.16 RETAIL
STATION CONTROL ROOM AREA 3
CONCOURSE LEVEL
FCU-W-UL-97 FCU-E-UL-74 CRAC-023-CHW FCU-E-UL-75 FCU-E-UL-76 FCU-E-UL-77 FCU-E-UL-98 FCU-E-UL-99
5.3.13 5.3.14
5.3.8 5.3.9 5.3.10 5.3.11 5.3.12 5.3.16 ELECTRICAL ELECTRICAL
T.B.D 1 T.B.D 2 TEL/IT T.B.D 3 T.B.D 4 T.B.D 5 ROOM 3 ROOM 4

UNDER PLATFORM LEVEL


8

REFER TO
AVV
DD2 (DETAILED)
DISTRICT FCP01 A B C ACP01 A B C TCP01 A B C
FCU-E-TL-85 FCU-E-TL-84a FCU-E-TL-84b COOLING FCU CHW AHU CHW
TUNNEL STATION - THE WHITE PALACE
6.3.29 WORK CIRCUIT COOLING
CIRCUIT
ELECTRICAL 6.3.34
WASTE 2
PACKAGE FOR CIRCUIT CHILLED WATER SYSTEMS
ROOM 3 ETS DETAILS IV IV
DC SCHEMATIC (EAST)
DIRT AIR IV CS IV CS IV CS
SEPARATOR 1

HM HM HM

T T T T T T
T T T T T T

FCU-E-TL-83 FCU-E-TL-82 FCU-E-TL-81 FCU-E-TL-90 FCU-E-TL-89 FCU-E-TL-88 FCU-E-TL-91 FCU-E-TL-92 FCU-E-TL-93 FCU-E-TL-87 FCU-E-TL-86

6.3.33
FIRE FIGHTING TANK ROOM 1
6.3.32
ETS/CHW PUMP ROOM
6.3.31
T.B.D 2
6.3.30
T.B.D 1 P8
TRANSFER LEVEL DC DC DC DC DC DC DC DC DC DC 7/19/2017 12:27:34 PM