CRAC-040-CHW FCU-W-CL-22A FCU-W-CL-22B CRAC-005-CHW CRAC-004-CHW CRAC-003-CHW CRAC-007-CHW CRAC-007-CHW CRAC-007-CHW FCU-W-CL-100 FCU-W-CL-101 FCU-W-CL-24A FCU-W-CL-24B FCU-W-CL-41 FCU-W-CL-40 FCU-W-CL-98
2.3.14 AAV 2.2.15 2.2.5/2.2.6 2.2.13 1.2.3a 1.1.03d
TCP AHU 01 AAV
2.3.6 2.3.7 2.3.16 2.3.17 TEL 3RD 2.3.18 2.3.12a 2.3.12b BOH STAFF ROOM-M1 / LOCKER BOH PRAYER PUBLIC
MCR 1/2 AHU TCP 1 TEL POLICE TEL QAF PARTIES TEL/IT MAIN BATTERY ROOM BATTERY ROOM CORRIDOR 3 ROOM-M1 CORRIDOR 1 ROOM W TOILET W
WEST TUNNEL COOLING 1A 2A
AHU (BY OTHERS)
2.3.9
ELECTRICAL
ROOM 1
FCU-W-CL-107
6 7
FCU-W-CL-29 FCU-W-CL-31 FCU-W-CL-30
AHU 09 AHU 08
2.3.71 2.2.4 2.2.1 2.2.3
VENTILATION PLANTROOM 1 1ST AID POLICE/QAF GARBAGE 1
8
IV IV
IV
CRAC-008-CHW CRAC-039-CHW FCU-W-CL-34A FCU-W-CL-28 FCU-W-CL-27 FCU-W-CL-26 FCU-W-CL-34 FCU-W-CL-35A FCU-W-CL-23B FCU-W-CL-23 FCU-W-CL-38A FCU-W-CL-39A FCU-W-CL-39B FCU-W-CL-43 FCU-W-CL-25 FCU-W-CL-99
2.3.8 2.3.9 2.3.23 2.2.8/2.2.9 2.2.14 2.1.10 1.1.04d
SPS ENERGY BATTERY GAS SUPPRE- 2.3.20 2.3.19 2.3.24 2.2.12 STAFF ROOM-F1 / STAFF BOH PRAYER PUBLIC
ROOM 1 ROOM 1 SSION 1 T.B.D. A.C.B.S. 1 WASTE 1 T.B.D. 2 LOCKER ROOM F-1 CORRIDOR 2 ROOM M TOILET M
OMITTED
7 6 6
AHU 05 AHU 01 AHU 03 CONCOURSE LEVEL
2.3.11 IV
8
HVAC 1
DD2 (DETAILED)
STATION - THE WHITE PALACE
CHILLED WATER SYSTEMS
DC DC DC
DC DC DC
SCHEMATIC (WEST)
8
AAV AAV IV
QIBL
A
8
IV IV IV
8 8
IV
8 OFFSET AT BOTTOM ROOF LEVEL
IV
9 9
FCU-E-CL-29 FCU-E-CL-30 FCU-E-CL-32A FCU-E-CL-22 FCU-E-CL-26 FCU-E-CL-21 FCU-E-CL-25
2.3.70 2.3.69 2.1.19 2.3.20 2.1.17 2.1.20 BOTTOM ROOF LEVEL
SMOKE VENTILATION MEP RETAIL 2.2.21 INFORMATION TRAVEL RETAIL
PLANTROOM CORRIDOR 9 AREA 2 TICKET OFFICE DESK CENTER AREA 1
7
FCU-E-CL-96 CRAC-016-CHW CRAC-021-CHW FCU-E-CL-33 FCU-E-CL-34 FCU-E-CL-35
2.2.22 2.3.40 2.3.72
9 BOH SPS MV 2.3.37 MEP 2.3.73 AHU 10
CORRIDOR 5 ROOM 2 TEL/IT 2 CORRIDOR 10 VENTILATION PLANTROOM
FCU-E-CL-31A FCU-E-CL-31B FCU-E-CL-31C
2.1.21
2.3.71 RETAIL
VENTILATION PLANTROOM AREA 4
IV
10
FCU-E-CL-16B FCU-E-CL-94 FCU-E-CL-95 CRAC-015-CHW FCU-E-CL-19 FCU-E-CL-23 FCU-E-CL-24C FCU-E-CL-24B FCU-E-CL-24A FCU-E-CL-28 CRAC-043-CHW
2.3.42 2.2.21 2.3.40
ELECTRICAL 2.2.17 BOH SPS LV 2.3.43 2.3.46 2.3.35 TCP AHU 02 2.3.34 CRAC-020-CHW FCU-E-PL-73
ROOM 4 STORAGE CORRIDOR 4 ROOM 2 ACBS 2 WASTE 2 7 6 6 AHU TCP 2 MCR 3/4 4.3.10
8 EAST TUNNEL 4.3.9 ELECTRICAL
COOLING AHU TEL/IT 2 ROOM 2
AHU 04 AHU 06 AHU 02 (BY OTHERS) UPPER PLATFORM LEVEL
2.3.44
HVAC 2a
9
FCU-E-CL-16C FCU-E-CL-16D
2.1.18
2.2.16 RETAIL
STATION CONTROL ROOM AREA 3
CONCOURSE LEVEL
FCU-W-UL-97 FCU-E-UL-74 CRAC-023-CHW FCU-E-UL-75 FCU-E-UL-76 FCU-E-UL-77 FCU-E-UL-98 FCU-E-UL-99
5.3.13 5.3.14
5.3.8 5.3.9 5.3.10 5.3.11 5.3.12 5.3.16 ELECTRICAL ELECTRICAL
T.B.D 1 T.B.D 2 TEL/IT T.B.D 3 T.B.D 4 T.B.D 5 ROOM 3 ROOM 4
REFER TO
AVV
DD2 (DETAILED)
DISTRICT FCP01 A B C ACP01 A B C TCP01 A B C
FCU-E-TL-85 FCU-E-TL-84a FCU-E-TL-84b COOLING FCU CHW AHU CHW
TUNNEL STATION - THE WHITE PALACE
6.3.29 WORK CIRCUIT COOLING
CIRCUIT
ELECTRICAL 6.3.34
WASTE 2
PACKAGE FOR CIRCUIT CHILLED WATER SYSTEMS
ROOM 3 ETS DETAILS IV IV
DC SCHEMATIC (EAST)
DIRT AIR IV CS IV CS IV CS
SEPARATOR 1
HM HM HM
T T T T T T
T T T T T T
FCU-E-TL-83 FCU-E-TL-82 FCU-E-TL-81 FCU-E-TL-90 FCU-E-TL-89 FCU-E-TL-88 FCU-E-TL-91 FCU-E-TL-92 FCU-E-TL-93 FCU-E-TL-87 FCU-E-TL-86
6.3.33
FIRE FIGHTING TANK ROOM 1
6.3.32
ETS/CHW PUMP ROOM
6.3.31
T.B.D 2
6.3.30
T.B.D 1 P8
TRANSFER LEVEL DC DC DC DC DC DC DC DC DC DC 7/19/2017 12:27:34 PM