Team Leader
Widening and Reconstruction of existing intermediate/2 Lane to 2 Lane
with paved shoulder configuration from existing Km. 268.000(Design
Km. 266.100) to Km. 300.00 (Design Km. 296.500) excluding existing Km.
277.650 to 277.900 & Km. 297.080 to 297.315 of NH-58 in the state of
Uttarakhand through an Engineering, Procurement and Construction
(EPC) Contract
Stage Complete(Feb-2019) 9
Upto Date #REF!
Total Paid till Previous Bill = 28.00
Total This Bill #REF!
Widening and Reconstruction of existing intermediate/2 Lane to 2 Lane
with paved shoulder configuration from existing Km. 268.000(Design Km.
266.100) to Km. 300.00 (Design Km. 296.500) excluding existing Km.
277.650 to 277.900 & Km. 297.080 to 297.315 of NH-58 in the state of
Uttarakhand through an Engineering, Procurement and Construction
(EPC) Contract
Stage Payment Statement-
1.3.4 (iii) Road side Drain
Chainage Length
Sl No Unit Side IPC No. Remarks
From To
Chainage
Sl No RFI No. Date Unit Side Unit
From To
10/6/2018,
16/6/2018,
CDS/KD/PROT/44, 103, 21/6/2018,
2 164, 222, 258, 324 & 24/6/2018, 266+130 266+137 Mtr RHS 0.007
335 27/6/2018/
10/7/2018 &
11/6/2018,
13/7/2018
12/6/2018,
CDS/KD/PROT/47A, 62A, 13/6/2018,
3 64A, 81, 96, 153, 262 & 15/6/2018, 266+137 266+142 Mtr RHS 0.005
16/6/2018,
276A 20/6/2018,
28/6/2018
11/6/2018,&
CDS/KD/PROT/49, 54, 30/6/2018
12/6/2018,
4 112 & 150 17/6/2018 266+200 266+260 Mtr RHS 0.060
11/6/2018,&
20/6/2018
6/7/2018,
8/7/2018,
CDS/KD/PROT/50, 314A, 11/7/2018,
5 319, 332, 337, 345, 350 14/7/2018, 266+420 266+425 Mtr RHS 0.005
& 351 21/7/2018
25/7/2018
12/6/2018,&
CDS/KD/PROT/62, 118, 24/7/2018
18/6/2018,
6 223 & 331 24/6/2018 & 266+427 266+444 Mtr RHS 0.017
11/7/2018
13/6/2018,
CDS/KD/PROT/69,221 &
8 272 24/6/2018 & 266+460 266+460 Mtr RHS 0.000
29/06/2018
13/7/2018,
CDS/KD/PROT/334B, 13/7/2018,
9 331B, 342B & 343B 16/7/2018 & 266+468 266+473 Mtr RHS 0.005
20/7/2018
14/6/2018,
CDS/KD/PROT/72, 81A, 15/6/2018,
10 151A & 274A 20/6/2018 & 266+550 266+585 Mtr RHS 0.035
29/6/2018
15/6/2018 &
11 CDS/KD/PROT/93 & 148 20/6/2018 266+615 266+655 Mtr RHS 0.040
15/6/2018 &
12 CDS/KD/PROT/92 & 149 20/6/2018 266+780 266+810 Mtr RHS 0.030
Widening and Reconstruction of existing intermediate/2 Lane to 2 Lane with paved shoulder configuratio
existing Km. 268.000(Design Km. 266.100) to Km. 300.00 (Design Km. 296.500) excluding existing Km. 27
277.900 & Km. 297.080 to 297.315 of NH-58 in the state of Uttarakhand through an Engineering, Procure
Construction (EPC) Contract
Stage Payment Statement-
1.3.4 Other Works
(VIII) Protection Works
(a) Retaining Wall
Chainage
Sl No RFI No. Date Unit Side Unit
13 CDS/KD/PROT/341A 16/7/2018 266+810 266+860 Mtr RHS 0.050
17/6/2018,
CDS/KD/PROT/105, 151
14 & 203 20/6/2018 & 266+870 266+890 Mtr RHS 0.020
23/6/2018
18/6/2018,
21/6/2018,
CDS/KD/PROT/119, 165,
15 213, 304 & 314B 24/6/2018, 268+050 268+085 Mtr RHS 0.035
3/7/2018 &
6/7/2018
22/6/2018,
CDS/KD/PROT/175A, 24/6/2018,
18 209, 263 & 306 28/6/2018 & 268+230 268+250 Mtr RHS 0.020
3/7/2018
22/6/2018,
CDS/KD/PROT/173A,
19 250, 251 & 336A 26/6/2018 & 268+480 268+500 Mtr RHS 0.020
13/7/2018
23/6/2018,01/
CDS/KD/PROT/201,285,3 07/2018,
21 269+600 269+623 Mtr RHS 0.023
31A &344 12/07/2018 &
21/07/2018
25/6/2018,
CDS/KD/PROT/240,273
22 29/6/2018 & 270+705 270+725 Mtr RHS 0.020
& 323 10/07/2018
25/6/2018,5/0
CDS/KD/PROT/239,313,3 7/2018 ,
23 270+740 270+755 Mtr RHS 0.015
32A & 340 12/07/2018 &
16/07/2018
26/6/2018,
29/6/2018,
CDS/KD/PROT/249,
25 29/6/2018, 271+010 271+053 Mtr RHS 0.043
273A, 274, 288 & 318 1/7/2018 &
8/7/2018
Widening and Reconstruction of existing intermediate/2 Lane to 2 Lane with paved shoulder configuratio
existing Km. 268.000(Design Km. 266.100) to Km. 300.00 (Design Km. 296.500) excluding existing Km. 27
277.900 & Km. 297.080 to 297.315 of NH-58 in the state of Uttarakhand through an Engineering, Procure
Construction (EPC) Contract
Stage Payment Statement-
1.3.4 Other Works
(VIII) Protection Works
(a) Retaining Wall
Chainage
Sl No RFI No. Date Unit Side Unit
26/6/2018,
CDS/KD/PROT/252, 278,
26 279 & 337 30/6/2018, 271+190 271+220 Mtr RHS 0.030
14/7/2018
9/6/2018 &
27 CDS/KD/PROT/36 & 70 13/6/2018 271+460 271+485 Mtr RHS 0.025
9/6/2018 &
28 CDS/KD/PROT/26 & 27 9/6/2018 271+555 271+600 Mtr RHS 0.045
9/6/2018,
10/6/2018,
CDS/KD/PROT/35,43,102 16/6/2018,
29 ,314 & 341 271+760 271+780 Mtr RHS 0.020
5/07/2018 &
16/07/2018
9/7/2018,
CDS/KD/PROT/321A, 12/07/2018,
30 271+840 271+864 Mtr RHS 0.024
335B, 344A &346 21/07/2018 &
23/07/2018
31 CDS/KD/PROT/421 8/7/2018 271+864 271+875 Mtr RHS 0.011
Chainage
Sl No RFI No. Date Unit Side Unit
38 CDS/KD/PROT/505 8/19/2018 273+280 273+292 Mtr RHS 0.012
39 CDS/KD/PROT/843 8/20/2018 273+500 273+535 Mtr RHS 0.035
40 CDS/KD/PROT/513 8/20/2018 273+900 273+941 Mtr RHS 0.041
41 CDS/KD/PROT/517 8/24/2018 273+955 274+050 Mtr RHS 0.095
1 CDS/KD/PROT/536 9/3/2018 274+050 274+060 Mtr RHS 0.010
2 CDS/KD/PROT/543 9/8/2018 274+060 274+110 Mtr RHS 0.050
3 CDS/KD//PROT/583 9/15/2018 274+110 274+132 Mtr RHS 0.022
4 CDS/KD/PROT/595 9/18/2018 274+540 274+580 Mtr RHS 0.040
5 CDS/KD/PROT/598 9/18/2018 274+740 274+765 Mtr RHS 0.025
6 CDS/KD/PROT/609 9/21/2018 274+765 274+787 Mtr RHS 0.022
7 CDS/KD/PROT/611 9/22/2018 274+900 274+945 Mtr RHS 0.045
8 CDS/KD/PROT/614 9/22/2018 274+945 275+005 Mtr RHS 0.060
9 CDS/KD/PROT/624 9/25/2018 276+100 276+140 Mtr RHS 0.040
10 CDS/KD/PROT/631 9/29/2018 276+555 276+585 Mtr RHS 0.030
11 CDS/NH/58/2/PW/88 10/22/2018 276+640 276+680 Mtr RHS 0.040
12 CDS/NH/58/2/PW/149 11/2/2018 276+800 276+828 Mtr RHS 0.028
13 CDS/NH58/2/PW/151 11/2/2018 277+510 277+535 Mtr RHS 0.025
14 CDS/NH58/2/PW/152 11/2/2018 277+535 277+551 Mtr RHS 0.016
15 CDS/NH58/2/PW/150 11/2/2018 277+580 277+590 Mtr RHS 0.010
16 CDS/NH/58/2/PW/163 11/4/2018 277+620 277+680 Mtr RHS 0.060
17 CDS/NH/58/2/PW/159 11/5/2018 277+750 277+816 Mtr RHS 0.066
18 CDS/NH/58/2/PW/580 11/15/2018 278+300 278+322 Mtr RHS 0.022
19 CDS/KD/PROT/724 11/28/2018 278+322 278+323 Mtr RHS 0.001
20 CDS/NH/58/2/PW/273 12/1/2018 278+930 278+956 Mtr RHS 0.026
21 CDS/NH/58/2/PW/272 12/1/2018 278+980 279+004 Mtr RHS 0.024
22 CDS/KD/PROT/755 12/2/2018 279+004 279+021 Mtr RHS 0.017
23 CDS/KD/PROT/794 12/7/2018 279+100 279+109 Mtr RHS 0.009
24 CDS/KD/PROT/795 12/7/2018 279+668 279+723 Mtr RHS 0.055
25 CDS/NH/58/2/PW/335 12/7/2018 280+170 280+244 Mtr RHS 0.074
26 CDS/KD/PROT/480 12/12/2018 280+660 280+699 Mtr RHS 0.039
27 CDS/NH/58/2/PW/404 12/14/2018 281+250 281+290 Mtr RHS 0.040
28 CDS/NH/58/2/PW/386 12/14/2018 281+290 281+302 Mtr RHS 0.012
29 CDS/NH/58/2/PW/387 12/15/2018 281+350 281+390 Mtr RHS 0.040
30 CDS/KD/PROT/834 12/16/2018 281+660 281+694 Mtr RHS 0.034
31 CDS/KD/PROT/843 12/17/2018 281+750 281+785 Mtr RHS 0.035
32 CDS/KD/PROT/852 12/18/2018 281+930 282+020 Mtr RHS 0.090
33 CDS/KD/PROT/850 12/18/2018 282+030 282+070 Mtr RHS 0.040
34 CDS/KD/PROT/856 12/18/2018 282+100 282+148 Mtr RHS 0.048
35 CDS/KD/PROT/857 12/18/2018 282+250 282+273 Mtr RHS 0.023
36 CDS/NH/58/2/PW/442 12/20/2018 282+290 282+340 Mtr RHS 0.050
Widening and Reconstruction of existing intermediate/2 Lane to 2 Lane with paved shoulder configuratio
existing Km. 268.000(Design Km. 266.100) to Km. 300.00 (Design Km. 296.500) excluding existing Km. 27
277.900 & Km. 297.080 to 297.315 of NH-58 in the state of Uttarakhand through an Engineering, Procure
Construction (EPC) Contract
Stage Payment Statement-
1.3.4 Other Works
(VIII) Protection Works
(a) Retaining Wall
Chainage
Sl No RFI No. Date Unit Side Unit
37 CDS/KD/PROT/906 12/24/2018 282+355 282+362 Mtr RHS 0.007
38 CDS/KD/PROT/909 12/25/2018 282+450 282+466 Mtr RHS 0.016
39 CDS/KD/PROT/942 12/29/2018 282+800 282+829 Mtr RHS 0.029
40 CDS/KD/PROT/946 12/29/2018 282+850 282+905 Mtr RHS 0.055
41 CDS/KD/PROT/950 12/30/2018 282+924 282+930 Mtr RHS 0.006
282+930 282+950 Mtr RHS 0.020
282+955 282+963 Mtr RHS 0.008
283+000 283+025 Mtr RHS 0.025
283+037 283+048 Mtr RHS 0.011
283+053 283+063 Mtr RHS 0.010
283+200 283+550 Mtr RHS 0.350
284+239 284+280 Mtr RHS 0.041
285+170 285+185 Mtr RHS 0.015
285+560 285+566 Mtr RHS 0.006
285+571 285+596 Mtr RHS 0.025
285+640 285+681 Mtr RHS 0.041
285+750 285+757 Mtr RHS 0.007
285+762 285+770 Mtr RHS 0.008
286+200 286+220 Mtr RHS 0.020
286+240 286+280 Mtr RHS 0.040
286+700 286+750 Mtr RHS 0.050
286+800 286+831 Mtr RHS 0.031
286+870 286+893 Mtr RHS 0.023
287+010 287+042 Mtr RHS 0.032
287+050 287+086 Mtr RHS 0.036
287+100 287+126 Mtr RHS 0.026
287+150 287+167 Mtr RHS 0.017
287+300 287+333 Mtr RHS 0.033
287+990 288+054 Mtr RHS 0.064
288+725 288+820 Mtr RHS 0.095
288+825 288+835 Mtr RHS 0.010
289+910 289+925 Mtr RHS 0.015
289+930 289+932 Mtr RHS 0.002
290+217 290+230 Mtr RHS 0.013
290+235 290+246 Mtr RHS 0.011
291+350 291+391 Mtr RHS 0.041
291+455 291+480 Mtr RHS 0.025
291+560 291+730 Mtr RHS 0.170
Widening and Reconstruction of existing intermediate/2 Lane to 2 Lane with paved shoulder configuratio
existing Km. 268.000(Design Km. 266.100) to Km. 300.00 (Design Km. 296.500) excluding existing Km. 27
277.900 & Km. 297.080 to 297.315 of NH-58 in the state of Uttarakhand through an Engineering, Procure
Construction (EPC) Contract
Stage Payment Statement-
1.3.4 Other Works
(VIII) Protection Works
(a) Retaining Wall
Chainage
Sl No RFI No. Date Unit Side Unit
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
houlder configuration from
ding existing Km. 277.650 to
ngineering, Procurement and
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-4
IPC-1
IPC-1
IPC-2
IPC-2
IPC-2
IPC-2
houlder configuration from
ding existing Km. 277.650 to
ngineering, Procurement and
IPC-4
IPC-4
IPC-4
IPC-1
IPC-2
IPC-2
IPC-2
IPC-2
IPC-2
IPC-2
IPC-2
houlder configuration from
ding existing Km. 277.650 to
ngineering, Procurement and
Remarks
Widening and Reconstruction of existing intermediate/2 Lane to 2 Lane with paved shoulder
configuration from existing Km. 268.000(Design Km. 266.100) to Km. 300.00 (Design Km. 296.500)
excluding existing Km. 277.650 to 277.900 & Km. 297.080 to 297.315 of NH-58 in the state of Uttarakhand
through an Engineering, Procurement and Construction (EPC) Contract
Stage Complete(Dec-18) 1
Up to date Quantity 2
Up to Previous Quantity 2
This bill Quantity 0
existing New
100 70
200 80
200 70
20 70
20 60
60 50
150 30
100 40
30 140
70 60
100 60
120 100
130 100
100 100
30 85
280 90
190 90
100 80
100 120
400 60
450 70
320 90
130 100
250 90
350 140
200 60
300 70
200 80
280 100
190 80
230 100
70 120
130 2655
50
230
240
50
100
30
100
50
50
200
50
250
100
30
120
70
180
120
130
50
100
200
40
360
100
650
110
100
140
50
50
120
130
40
40
150
20
70
80
100
50
130
170
80
120
100
200
100
50
100
50
100
50
50
70
50
130
100
590
160
100
250
50
70
30
350
100
50
100
900
150
350
150
500
600
50
260
60
80
120
380
50
850
340
60
50
100
400
50
200
180
220
70
170
60
250
50
50
150
100
60
40
350
50
500
130
370
250
50
120
30
50
100
40
110
190
760
50
100
20
30
100
250
170
580
50
610
490
30
380
160
280
30
120
70
220
560
450
150
230
170
340
60
100
30000
27345
85