Professional Documents
Culture Documents
Special
Long Rope
Lock
Short Rope
Open side
Wall
Min. 3"
Min. 3"
Double Pulley Channel
Ceiling
Cap
Long Rope
Wall Side
Open side
3D View
Button Special
Lock
Short Rope
54 "
OCTAGON - 020-24497849
Pipe end cap
Rope end Cap
Ground Side View
Level
(Fig 2)
Place the lock in the white button, push it up
(Fig 4) slightly & tie a knot of two ropes & insert the
knot into the cavity so that it will not visible
from the front.(Fig 8)
(Fig 8)
3. Fitting the channels to the ceiling
Both channels should be parallel to each other.
The channel with double pulley should be fitted
at the pulling end. Keep minimum 3'' distance
from the wall. Use PVC plugs & screws to fit the Insert rope from the hole, tie a knot and again pull
channels in the ceiling. The distance between the rope at the single pulley end.
Fix the black cap to the pipe end Insert a rope end cap through the open end of
two channel should be equal to the length of the
Repeat this procedure for both ends of all pipes. the two ropes and tie a knot to the open
pipe. (Please Refer the Ceiling Top View on
(Fig 5) end.(Fig 9)
the Rear Page)
(Fig 9)
4. Bracket-Pulley assembly
(Fig 5)
The bracket can be moved within the channel
by loosening the two screws (Plastic /Metal) on
sides of each bracket. Tighten the screws so
that the single & double bracket pulleys
on the two channels are parallel to each other.