You have the shape –

we have the right Crane design!

Saving potential

Cranes online planning | Thomas Hacke | 29. Jan. 2011


A little more lifting height please!

Standard design Optimal utilization of space


Raised crane

Cranes online planning | Thomas Hacke | 29. Jan. 2011


…or a little less building cost?

Standard design Cost saving


Reduced overall height

Cranes online planning | Thomas Hacke | 29. Jan. 2011


A little less steel – if possible.

Larger deformation differences tolerated with Low extra price for guide rollers and
guide rollers fitted on one side (derailment derailment protection = potential savings of
protection fitted on the opposite side) -> approx. 5 - 10 % on the building structure
lower lateral forces = smaller crane runway costs (weaker building structure)

Cranes online planning | Thomas Hacke | 29. Jan. 2011