Professional Documents
Culture Documents
Modul 20. Gravity Settler Mixed Flow-Tugas Ke 2B
Modul 20. Gravity Settler Mixed Flow-Tugas Ke 2B
GRAVITY SETTLER
ARIS DWI CAHYANTO
Sumber :
Noel De Nevers, 2000
Air Pollution Control Engineering
Wallohu a’lam bishowab 1
Tugas ke 2B
• Hitung efisiensi gravity settler, H = 2m, L =
sesuai dengan Tabel, V rata-rata = 1 m/s,
densitas = 2000 kg/m3, µ = 1,8.10-5 kg/m.s
Sumber :
Noel De Nevers, 2000
Air Pollution Control Engineering
Wallohu a’lam bishowab 2
Tabel 1. Panjang (L)
Sumber :
Noel De Nevers, 2000
Air Pollution Control Engineering
Wallohu a’lam bishowab 3
Ditanyakan
1. Contoh Perhitungan pada D = 1 mikro meter
2. Perhitungan keseluruhan mencapai 100%
fraksi terpisahkan pada Tabel
3. Grafik Block Flow
4. Grafik Mixed Flow
5. Gambar sketsa Gravity Setler
Sumber :
Noel De Nevers, 2000
Air Pollution Control Engineering
Wallohu a’lam bishowab 4
TERIMA KASIH