JIZAN REFINERY & MARINE TERMINAL PROJECT (EPC-PACKAGE 14)
Rev.0 INSTRUMENT RFI ISUED SCHEDULE July 1 2019
Contractor
SN RFI No. QMIS No. DESCRIPTION OF ACTIVITY TO BE INSPECTED/TESTED SATIP Ref. SAIC Ref. LOCATION PLANT CODE DRAWING NO. SAUDI ARAMCO Inspection Level HENC PID PMT
CABLE CONDUIT FROM RC02 MAIN TRAY to RC03 MAIN TRAY, at Sulfur Stacker as per
attached IFC Drawing & Checklist. Shek
JRTP014-RO011-COMM-
HENC-INST- SATIP-P-104-05 SAIC-P-3323 Sulfur Stacker T36 C-8013 H W Ahamed Sant Hashmi
Shadhik
VISUAL INSPECTION OF 1", 1-1/2" & 2" RGS PVC CONDUIT INSTALLATION FOR T36-PGJB-
4395 to MAIN TRAY, FROM T36-PGJB-4396 to MAIN TRAY , T36-XC-4221 to MAIN TRAY, Shek
FROM T36-PGJB-4390 to MAIN TRAY, FROM T36-PGJB-4391 to MAIN TRAY, FROM T36- JRTP014-RO011-COMM-
HENC-INST-
PGJB-4380 to MAIN TRAY,T36-PGJB-4385 to Main Tray, at Sulfur Stacker as per attached
SATIP-P-104-05 SAIC-P-3323 Sulfur Stacker T36
C-8013
H W Ahamed Sant Hashmi
IFC Drawing & Checklist. Shadhik
VISUAL INSPECTION OF 3/4",1"1-1/4"1 1/5" RGS PVC CONDUIT INSTALLATION FOR T36-
PGJB-4686 to T36-XS-4872 B, FROM T36-PGJB-4687 to T36-SS-4871 , at Sulfur Stacker Shek
JRTP014-RO011-COMM-
HENC-INST- as per attached IFC Drawing & Checklist. SATIP-P-104-05 SAIC-P-3323 Sulfur Stacker T36 C-8013 H W Ahamed Sant Hashmi
Shadhik