JIZAN REFINERY TERMINAL PROJECT -INSTRUMENT RFI - EPC 14

CONTRACTOR COMPANY
B RFI NO. QMIS NO. Description SATIP SAIC LOCATION PLANT CODE DRAWING NO. Inspection Date TIME (INSPECTION (INSPECTION HENC QC Inspector SAPID Inspector SAPMT Remark
LEVEL) LEVEL)

Visual Inspecton of Cable Glanding Dressing and Final


Terminaton of Instrument Cables ,T36-YS-4671, T36-XS- SATIP-J-902-01 Sulfur Shek Ahamed
HENC-INST- 4672, T36-PC-6288 , to Main JB T36-PGJB-4010 at Sulfur SAIC-J-6606 T36 VA-305738 7-Sep-19 H W Sant Jabbar
(4.02) Stacker Shadhik
Stacker RC-01, as per Highlighted Interconnecton
Diagram.

Witness of Contnuity & Insulaton Resistance (I.R) Test


for Instrument Cables: T36-YS-4671, T36-XS-4672, T36- SATIP-J-902-01 Sulfur Shek Ahamed
HENC-INST- PC-6288 at Sulfur Stacker RC-01, as per Highlighted in (4.01) SATR-J-6602 Stacker T36 VA-305738 7-Sep-19 H W Shadhik Sant Jabbar
Cable Schedule.